Final Safety Evaluation Report for the Subsequent License Renewal Application Review
Date released: 01/04/2022 Download: ML21354A174



Non-Concurrence on the Safety Evaluation Report Related to the Subsequent License Renewal Application of North Anna Power Station, Units 1 and 2
ML22004A223
Person / Time
Site: North Anna Dominion icon.png
Issue date: 11/10/2021
From: James Gavula
NRC/NRR/DNRL/NLRP
To:
Vera Amadiz M
References
EPID L-2020-SLR-0000, EPID L-2021-SLR-0003, NCP-2021-007
Download: ML22004A223 (8)
Non-Concurrence on the Safety Evaluation Report Related to the Subsequent License Renewal Application of North Anna Power Station, Units 1 and 2
ML22004A084
Person / Time
Site: North Anna Dominion icon.png
Issue date: 09/07/2021
From: Brian Allik
NRC/NRR/DNRL/NLRP
To:
Vera Amadiz M
References
EPID L-2020-SLR-0000, EPID L-2021-SLR-0003, NCP-2021-006
Download: ML22004A084 (8)
Final Safety Evaluation Report for the Subsequent License Renewal Application Review (EPID No. L 2020 SLR 0000) - SER
ML21354A196
Person / Time
Site: North Anna Dominion icon.png
Issue date: 01/03/2022
From:
NRC/NRR/DNRL
To:
James L M
References
EPID L-2020-SLR-0000, EPID L-2021-SLR-0003
Download: ML21354A196 (485)
Final Safety Evaluation Report for the Subsequent License Renewal Application Review (EPID No. L-2020-SLR-0000) - Issuance Letter
ML21354A195
Person / Time
Site: North Anna Dominion icon.png
Issue date: 01/04/2022
From: Beverly Smith
NRC/NRR/DNRL
To: Stoddard D G
Dominion Energy Co, Virginia Power (Virginia Electric & Power Co)
James L M
References
EPID L-2020-SLR-0000, EPID L-2021-SLR-0003
Download: ML21354A195 (3)