Letter Sequence Meeting |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARPMNS20201328, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and2020-12-0909 December 2020 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Request ML20338A0472020-12-0909 December 2020 December 9, 2020 FPL Slides Rps/Esfas Nuclear Instrumentation Project stage: Request PMNS20201397, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and2020-12-16016 December 2020 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Request ML21011A2382021-01-11011 January 2021 Slides for January 13, 2021 Presubmittal Meeting with NextEra Concerning Digital I&C Closed Non-Proprietary Project stage: Request ML21011A2232021-01-22022 January 2021 Requests for Withholding Information from Public Disclosure Project stage: Other PMNS20210136, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and2021-02-0404 February 2021 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Request ML21047A2102021-02-16016 February 2021 NRC Presubmittal Meeting Telecon February 18, 2021 Open Meeting - FPL Safety System Replacement Project LAR - Nonproprietary Project stage: Meeting PMNS20210305, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade at Turkey Point Nuclear Generating, Unit Nos. 3 and 42021-03-29029 March 2021 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade at Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Project stage: Request ML21054A0012021-03-29029 March 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade Project stage: Meeting ML21096A0612021-04-0808 April 2021 FPL Slides for Meeting with FPL-Turkey Point Units 3 and 4 Concerning Digital Instrumentation and Control Modification - Open Project stage: Request ML21096A0772021-04-0808 April 2021 FPL Slides for Meeting with FPL-Turkey Point Units 3 and 4 Concerning Digital Instrumentation and Control Modification Project stage: Request ML21099A1052021-04-23023 April 2021 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance PMNS20210737, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and2021-05-28028 May 2021 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Request ML21159A1652021-06-0404 June 2021 Affidavit for Nextera Tricon Presentation for Turkey Point 5th Presubmittal Meeting Project stage: Meeting ML21159A1892021-06-0909 June 2021 Non-Proprietary - FPL NRC Presubmittal Meeting June 9th Closed Slides Project stage: Meeting ML21159A1712021-06-0909 June 2021 FPL NRC Presubmittal Meeting June 10th Week Open Session Project stage: Meeting ML21176A0102021-06-29029 June 2021 Summary of Drop-in Meeting with NextEra-Florida Power and Light to Discuss Pending Submittals Related to Digital Instrumentation and Controls and Improved Standard Technical Specifications for Turkey Point Nuclear Plant, Units 3 & 4 (EPID L Project stage: Meeting ML21172A2712021-06-29029 June 2021 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Withholding Request Acceptance PMNS20210933, Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and2021-07-12012 July 2021 Partially Closed Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control Upgrade and Standard Technical Specifications Update at Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Request ML21200A1472021-07-22022 July 2021 Nextera/Fpl Meeting Slides for July 22, 2021 Partially Closed Meeting Concerning Control Room Digital Modernization - Closed Public Project stage: Request ML21200A1562021-07-22022 July 2021 Nextera/Fpl Meeting Slides for July 22, 2021 Partially Closed Meeting Concerning Control Room Digital Modernization - Open Project stage: Request ML21190A1862021-08-0202 August 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point Units 3 and 4 Project stage: Meeting ML21232A0172021-08-20020 August 2021 Licensees Non-Proprietary Presentation (2 of 2) for August 23 and 25, 2021 Public Meeting Project stage: Meeting ML21279A0962021-08-20020 August 2021, 23 August 2021, 15 October 2021 Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade for Turkey Point, Units 3 and 4 Project stage: Request ML21235A0932021-08-23023 August 2021 Licensees Non-Proprietary Presentation (1 of 2) for August 23 and 25, 2021 Public Meeting Project stage: Meeting PMNS20211047, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control License Amendment Request for Turkey Point Nuclear Generating Unit Nos. 3 and 42021-08-23023 August 2021 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Pending Digital Instrumentation and Control License Amendment Request for Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Meeting ML21279A0432021-10-15015 October 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade for Turkey Point, Units 3 and 4 Project stage: Meeting PMNS20211430, Pre-application Meeting with Terrapower to Discuss the Natrium Energy Island Decoupling2021-11-15015 November 2021 Pre-application Meeting with Terrapower to Discuss the Natrium Energy Island Decoupling Project stage: Meeting ML21246A0212021-11-23023 November 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade on Turkey Point Units 3 and 4 Project stage: Meeting ML21214A1192021-11-23023 November 2021 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 Project stage: Withholding Request Acceptance PMNS20211499, Pre-application Meeting with Terrapower to Discuss the the Methodology Used in Identifying the Risk-Informed, Performance-Based (RIPB) Principal Design Criteria (PDC)2021-11-23023 November 2021 Pre-application Meeting with Terrapower to Discuss the the Methodology Used in Identifying the Risk-Informed, Performance-Based (RIPB) Principal Design Criteria (PDC) Project stage: Meeting PMNS20211473, Pre-application Meeting with Terrapower to Discuss the Environmental Methodology for the Natrium Design2021-11-30030 November 2021 Pre-application Meeting with Terrapower to Discuss the Environmental Methodology for the Natrium Design Project stage: Meeting ML21340A1072021-12-0606 December 2021 Public Meeting Terrapower Natrium PDC Presentation Project stage: Request ML21302A0052021-12-23023 December 2021 Email to Nextera/Fpl Re Discussion of Availability of Human Factor Validation Information to Support the Planned Turkey Point Digital I&C License Amendment Request Project stage: Other ML21314A1422022-01-10010 January 2022 Terrapower, LLC - Summary of September 28, 2021, Pre-application Public Meeting to Discuss the Site Selection Process for the Natrium Plant Project stage: Meeting ML22011A0722022-01-11011 January 2022 Terrapower Pre-Application Radiological Source Term Methodology Development Presentation Project stage: Other PMNS20211570, Pre-application Meeting with Terrapower to Discuss the Source Term Methodology Plans for the Natrium Design2022-01-12012 January 2022 Pre-application Meeting with Terrapower to Discuss the Source Term Methodology Plans for the Natrium Design Project stage: Meeting ML21362A6522022-02-14014 February 2022 Summary of November 17, 2021, Pre-application Public Meeting with Terrapower, LLC to Discuss the Natrium Reactor Energy Island Decoupling Project stage: Meeting PMNS20220144, Pre-application Meeting with Terrapower to Discuss the Human Factors Engineering on Natrium Plant Design2022-02-18018 February 2022 Pre-application Meeting with Terrapower to Discuss the Human Factors Engineering on Natrium Plant Design Project stage: Meeting ML21363A1762022-02-18018 February 2022 Summary of Pre-Application Public Meeting with Terrapower, LLC to Discuss the Digital Instrumentation and Control System for the Natrium Reactor Project stage: Meeting PMNS20220162, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Units 3 and 42022-02-25025 February 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Units 3 and 4 Project stage: Meeting ML22063A4482022-03-0202 March 2022 Nextera/Fpl Affidavit for Proprietary Presentation for March 7, 2022, Public Meeting Project stage: Meeting ML22074A2212022-03-11011 March 2022 Terrapower, LLC, Human Factors Engineering Program Presentation Material Project stage: Request ML22080A2562022-03-21021 March 2022 Terrapower Submittal of Functional Containment Presentation Material Project stage: Request ML22082A2222022-03-23023 March 2022 Terrapower Slide Presentation for Met Tower Water Supply Public Meeting Project stage: Request PMNS20220148, Pre-application Meeting with Terrapower to Discuss the Natrium Plant Design Functional Containment2022-03-23023 March 2022 Pre-application Meeting with Terrapower to Discuss the Natrium Plant Design Functional Containment Project stage: Meeting ML21362A7632022-03-23023 March 2022 Summary of December 1, 2021, Pre-Application Public Meeting with Terrapower, LLC to Discuss the Environmental Methodology for the Natrium Reactor Project stage: Meeting PMNS20220150, Pre-application Meeting with Terrapower to Discuss the Meteorological Data and Plant Water Source for the Natrium Plant Design2022-03-28028 March 2022 Pre-application Meeting with Terrapower to Discuss the Meteorological Data and Plant Water Source for the Natrium Plant Design Project stage: Meeting ML21348A7402022-03-30030 March 2022 Summary of Public Meeting to Discuss the Structures, Systems and Components Classification for the Natrium Reactor Project stage: Meeting 2021-06-04
[Table View] |
Text
MEMORANDUM TO:
William B. Kennedy, Acting Chief Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation FROM:
Mallecia A. Sutton, Senior Project Manager Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF MARCH 30, 2022, PUBLIC MEETING WITH TERRAPOWER, LLC TO DISCUSS THE METEOROLOGICAL DATA AND PLANT WATER SOURCE FOR THE NATRIUM REACTOR (EPID NO. L-2021-LRM-0071)
On March 30, 2022, the U.S. Nuclear Regulatory Commission (NRC) staff held an observation public meeting with TerraPower, LLC (TerraPower) to provide the NRC staff with an overview of the meteorological data and plant water source for the Natrium Reactor. The public meeting notice, dated February 17, 2022, can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) under Accession No. ML22087A066. The presentation slides can be found at ML22082A222. Participants included personnel from the NRC staff, TerraPower, General Electric Hitachi, Bechtel, Duke Energy, and members of the public. The Enclosure provides the list of meeting attendees.
This pre-application interaction provided background information on the Natrium Reactor and an overview of regulatory information and as well as the potential reuse in some capacities of a meteorological tower and a water supply at the site proposed for the Natrium Reactor near the Naughton Power Plant in Wyoming.
The NRC staff began the public meeting with an introduction and explanation of logistical information. The NRC staff explained that the meeting was an observation meeting and that TerraPower representatives would provide the NRC staff with an overview of the meteorological data and plant water source for the Natrium Reactor.
CONTACT: Mallecia A. Sutton, NRR/DANU 301-415-0673 July 20, 2022 Signed by Sutton, Mallec on 07/20/22
W. Kennedy 2
During the meeting, TerraPower provided information on the draft purpose and need statement, the site selected (Naughton Parcel 19/20), and the meteorological towers and water supply planned for use. The NRC staff gave feedback in response to questions on the subjects presented. At the end of the presentation, the public had an opportunity to ask questions of the NRC staff. The NRC staff asked for feedback, concerns, and any improvements that can be made to the public meeting process, at the closure of the meeting.
Project No. 99902100
Enclosure:
List of Attendees
W. Kennedy 3
SUBJECT:
SUMMARY
OF MARCH 30, 2022, PUBLIC MEETING WITH TERRAPOWER, LLC TO DISCUSS THE METEOROLOGICAL DATA AND PLANT WATER SOURCE FOR THE NATRIUM REACTOR (EPID NO. L-2021-LRM-0071)
DATED: JULY 20, 2022 DISTRIBUTION:
PUBLIC RidsNrrDanu Resource RidsNrrDanuUal1 Resource DGreene, NRR CSmith, NRR MSutton, NRR KWagner, NRR WKennedy, NRR ASiwy, NRR PVokoun, NMSS DBarnhurst, NMSS THathaway, RES KQuinlan, NRR KErwin, NMSS ADAMS Accession Number: ML22189A209 NRC-001 OFFICE NRR/DANU/UAL1/PM NRR/DANU/UAL1/PM NRR/DANU/UAL1/LA NAME KWagner MSutton DGreene DATE 7/11/2022 7/12/2022 7/14/2022 OFFICE NRR/DANU/UAL1/BC(A)
NRR/DANU/UAL1/PM NAME WKennedy MSutton DATE 7/14/2022 7/20/2022 OFFICIAL RECORD COPY
Enclosure List of Attendees Public Meeting with TerraPower, LLC to Discuss the Meteorological Data and Plant Water Source for the Natrium Reactor Wednesday, March 30, 2022 2:00 PM - 3:00 PM Name Organization Mallecia Sutton U.S. Nuclear Regulatory Commission (NRC)
Kevin Quinlan NRC Kenneth Erwin NRC Katherine Wagner NRC Alex Siwy NRC Daniel Barnhurst NRC Patricia Vokoun NRC Trey Hathaway NRC Ryan Sprengel TerraPower, LLC (TerraPower)
Ian Gifford TerraPower Erin Wisler TerraPower Michael Montecalvo TerraPower Nick Kellenberger TerraPower George Honma General Electric Hitachi Steven Kline Bechtel Alice Carson Bechtel Aarti Shah Bechtel Lee Grzeck Duke Energy Adam Stein Public Citizen Jana Bergman Public Citizen Lisa Matis Public Citizen John Pfabe Public Citizen