Change in Completion Hours Estimate Amendment Turb Bldg. Loading Basis Change LAR
ML22256A303
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/13/2022
From: Klos L
Plant Licensing Branch II
To: Geoffrey Miller
Virginia Electric & Power Co (VEPCO)
Klos L
References
EPID L-2022-LLA-0056
Download: ML22256A303 (2)


Text

Klos, John From: Klos, John Sent: Tuesday, September 13, 2022 9:50 AM To: gary.d.miller@dominionenergy.com Cc: Klos, John

Subject:

RE: Surry Units 1 and 2 -- Change in completion hours estimate Re: Amendment Turb Bldg. Loading Basis change LAR (EPID L-2022-LLA-0056)

Gary, I am writing to inform you that due to personnel changes on this project in 2 different technical branches and with the additional of an audit for this LAR the initial forecasted hours of 260 is being increase to 400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />; however, the NRC does not plan to change the original forecasted completion date of April 28, 2023.

Thanks in advance, John Klos DORL Mcguire, Surry Licensing Project Manager U.S. NRC, Office of Nuclear Reactor Regulation (NRR),

Division of Operating Reactor Licensing (DORL),

NRC/NRR/DORL/LPL2-1, MS O9E3 Washington, DC 20555-0001 301.415.5136, John.Klos@NRC.gov From: Klos, John <John.Klos@nrc.gov>

Sent: Tuesday, May 17, 2022 12:35 PM To: gary.d.miller@dominionenergy.com Cc: Klos, John <John.Klos@nrc.gov>

Subject:

FW: Surry Units 1 and 2 Acceptance of Requested Licensing Action Re: Amendment Turb Bldg. Loading Basis change LAR (EPID L2022LLA0056)

Gary, By letters dated April 14, 2022 and May 11, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No.s ML22104A125 and ML22131A326, respectively, Virginia Electric and Power Company (Dominion Energy Virginia) submitted a license amendment for Surry Power Station (Surry) Units 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an application for an amendment to a license (including the technical specifications) must fully describe the changes requested, and 1

following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal the NRC staff has estimated that this licensing request will take approximately 260 hours0.00301 days <br />0.0722 hours <br />4.298942e-4 weeks <br />9.893e-5 months <br /> to complete. The NRC staff expects to complete this review by April 28, 2023. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.

If you have any questions, please contact me.

John Klos DORL Mcguire, Surry Licensing Project Manager U.S. NRC, Office of Nuclear Reactor Regulation (NRR),

Division of Operating Reactor Licensing (DORL),

NRC/NRR/DORL/LPL21, MS O9E3 Washington, DC 205550001 301.415.5136, John.Klos@NRC.gov 2