Similar Documents at Surry |
---|
Category:Letter
MONTHYEARML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20244032024-10-0303 October 2024 Cyber Security Inspection Report 05000280-2024403 and 05000281-2024403 Cover Letter (Public) IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 and Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 – Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure 2024-09-03
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24102A0682024-04-10010 April 2024 IST (z)(2) Hardship RR V-1 RCS Cold Leg, Lh Safety Injection Check Valves ML24065A2532024-03-0505 March 2024 RAI Issuance Surry RR IST P-1 P-2 ML23187A1122023-07-0606 July 2023 TSC Relocation LAR RAIs ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23068A0242023-03-0808 March 2023 RAI Issuance Fuel Handling Trolley LAR ML23054A2412023-02-23023 February 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry Turbine Building Tornado Reclassification ML23046A1172023-02-0202 February 2023 002 Radiation Safety Baseline Inspection Information Request ML23018A1642023-01-17017 January 2023 Formal Issuance of RAIs for Surry ISI Alternative for SG Welds, 30 Day Calendar Response Period (Email) ML22349A2102022-12-15015 December 2022 Formal 43-day Request for Additional Information Issuance for Surry Turbine Building License Amendment Request ML22339A1582022-11-30030 November 2022 Requalification Inspection Notification Letter ML22258A2202022-09-13013 September 2022 FFD RFI ML22251A1292022-09-0909 September 2022 Request for Additional Information Related to Response to Generic Letter 2004-04 ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22223A1192022-08-14014 August 2022 RP Inspection Document Request Letter Final ML22110A2052022-04-19019 April 2022 Formal Issuance of RAIs for Post LOCA Buffer Change LAR ML22067A1622022-03-0909 March 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22012A0572022-01-11011 January 2022 Issuance of RAIs for Surry Unit 1, Spring 2021 Steam Generator Tube Inspection ML21225A5022021-08-13013 August 2021 Request for Additional Information for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Appendix E of Fleet Report Com-Naf-2 (EPID:L02021-LLT-0000) Public Version ML21196A1012021-07-15015 July 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000280/2021011 and 05000281/2021011) and Request for Information (RFI) ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21102A3122021-04-12012 April 2021 NRR E-mail Capture - Surry, Units 1 & 2 - Final RAI for the LOCA AST LAR ML21076A4622021-03-17017 March 2021 NRR E-mail Capture - Draft RAI for Versatile Internals and Component Program for Reactors Vipre Code Review (L-2021-LLT-0000) ML21061A0292021-03-0101 March 2021 2021 Sur - POV Inspection Information Request ML21049A2662021-02-16016 February 2021 NRR E-mail Capture - Surry, Units 1 and 2 - Final RAI Concerning the Leak-Before-Break (LBB) LAR ML21049A2672021-02-11011 February 2021 NRR E-mail Capture - Surry, Units 1 & 2 - Draft RAI for the LBB LAR ML21020A1322021-01-19019 January 2021 NRR E-mail Capture - RAIs for Surry'S Request for Proposed Alternative S1-I5-ISl-05 and S2-I5-ISl-06 (ML20296A680) ML21020A1332021-01-13013 January 2021 NRR E-mail Capture - Draft RAIs for Surry'S Request for Proposed Alternative S1-I5-ISl-05 and S2-I5-ISl-06 (ML20296A680) ML20315A3972020-11-10010 November 2020 Notification of NRC Supplemental Inspection (95001) and Request for Information - RA ML20156A0652020-06-0404 June 2020 NRR E-mail Capture - Final RAIs for Surry U1 Fall 2019 Sgtir Application ML20136A0102020-05-14014 May 2020 NRR E-mail Capture - Final RAIs Regarding Surry Units 1 & 2 LAR to Adopt 10 CFR 50.69 ML20134J1382020-05-0606 May 2020 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML20106E9552020-04-15015 April 2020 Program Inspection RFI ML20029D8382020-02-0505 February 2020 Email from T. Tran, Nmss/Drefs/Elrb; Re., Request for Additional Information - Surry SLRA Environmental Review ML20013C7282020-01-0909 January 2020 NRR E-mail Capture - Final RAI Regarding Surry'S TS One-Time 14-Day AOT RSST Cable Replacement LAR ML20007F7952020-01-0606 January 2020 NRR E-mail Capture - Surry RAI Regarding Its Rx Coolant P-T Limits LAR ML19323E2212019-11-13013 November 2019 NRR E-mail Capture - RAI on the SPS Rtb CT Extension LAR ML19317F1042019-11-0707 November 2019 NRR E-mail Capture - Draft RAIs for SB LOCA LAR (Non Prop) ML19296D8982019-10-23023 October 2019 NRR E-mail Capture - RAI for Surry ISTF-411 LAR to Extend Rx Trip Breakers TS CT to 24 Hours ML19283B6252019-10-0202 October 2019 Questions Related to Interval Visual Inspections in Lieu of External Visual Inspections ML19283B6232019-09-20020 September 2019 NRC Surry Draft RAI-Open Cycle Cooling Water (NRC TRP-20 James Gavula) ML19283B6282019-09-19019 September 2019 SLRA - Draft 3rd Round RAI - Selective Leaching (Trp 33) ML19283B6272019-09-18018 September 2019 SLRA - Clarification Call for 3rd Round RAI - Trp 14 (Buried Piping) ML19253C7532019-08-20020 August 2019 SLRA Transmittal Email Attachment 4D Confirmation Letter - August 20, 2019 ML19231A1532019-08-14014 August 2019 Final Requests for Additional Information for the Safety Review of the Surry Power Station, Units 1 and 2 Subsequent License Renewal Application Set 4 August 14, 2019. L-2018-RNW-0023/000951 ML19217A3582019-08-0202 August 2019 SLRA RAI Transmittal Email Set 3 with Attachments- 2-August 5, 2019 ML19192A2472019-07-10010 July 2019 Final Disposition List of Request for Additional Information for the Safety Review of the Surry Power Station, Units 1 and 2 Subsequent License Renewal Application (L-2018-RNW-0023/000951) ML19184A1392019-07-0101 July 2019 SLRA Email Transmittal of Draft RAIs with Attachments - 29JUN2019 ML19169A0962019-06-17017 June 2019 NRR E-mail Capture - Request for Additional Information Emergency Action Level Scheme Change for Millstone Power Station - Units 1, 2, and 3, North Anna Power Station - Units 1 and 2, and Surry Power Station - Units 1 and 2 ML19164A3332019-06-11011 June 2019 Final Request for Additional Information for the Safety Review of the Surry Power Station, Units 1 and 2 Subsequent License Renewal Application Set 2 June 11, 2019 ML19176A5262019-06-11011 June 2019 SLRA Email Transmittal of Draft RAIs with Attachments June 11, 2019 2024-04-10
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 13, 2020 Mr. Daniel Stoddard Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
SURRY POWER STATION - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION
Dear Mr. Stoddard:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region II staff will conduct a problem identification and resolution (PI&R) inspection at your Surry Power Station during the weeks of July 13-17, 2020, and July 27-31, 2020. The inspection team will be led by Mr. Andrew Patz, NRC Resident Inspector of the Shearon Harris Nuclear Power Plant. This inspection will be conducted in accordance with the baseline inspection procedure, 71152, Problem Identification and Resolution, issued February 26, 2015.
The biennial PI&R inspection and assessment of the licensees Corrective Action Program (CAP) complements and expands upon the resident baseline inspections of routine daily screening of all corrective action program issues, quarterly focused issue reviews, and semiannual trend PI&R reviews.
On May 6, 2020, Mr. Patz confirmed with Ms. Maria Groshner, Licensing, of some details and expectations for the two weeks of onsite inspection.
The enclosure lists documents that will be needed prior to the inspection. Please have the referenced information available no later than June 29, 2020. This request is being submitted early to allow sufficient time for your staff to adequately plan and process this request.
However, all information provided to the team for review should be sensitive to the date of the inspection and updated with information that is no later than June 22, 2020.
Contact Mr. Patz with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.
If additional documents are needed, they will be requested when identified. Prior to the onsite inspection, Mr. Patz will discuss with your staff the following inspection support administrative details: availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; method of tracking inspector requests during the
D. Stoddard 2 inspection; access to licensee computers; working space; arrangements for site access; and other applicable information.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Mr. Patz at (404) 997-5153.
Sincerely,
/RA/
Stewart N. Bailey, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.: 05000280, 05000281 License Nos.: DPR-32 and DPR-37
Enclosure:
Information Request for Surry Problem Identification and Resolution Inspection cc: Distribution via ListServ PAPERWORK REDUCTION ACT STATEMENT This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.
PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
ML20134J138 OFFICE RII/DRP RII/DRP NAME A. Patz S. Bailey DATE 05/07/2020 05/13/2020 INFORMATION REQUEST FOR SURRY POWER STATION PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION (JULY 13-17, 2020 AND JULY 27-31, 2020)
Note: Unless otherwise noted, the information requested below corresponds to documents generated since October 18, 2018. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.
- 1. Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program. This should include procedures related to:
a) Corrective action process b) Cause evaluation c) Operating experience program d) Employee concerns program e) Self-assessment program f) Maintenance rule program and implementing procedures g) Operability determination and functionality assessment process h) Degraded/non-conforming condition process (e.g., RIS 2005-20) i) System health process or equivalent equipment reliability improvement programs j) Preventive maintenance deferral process If any of the procedures requested above were revised after October 18, 2018, please provide copies of all revisions during the onsite inspection.
- 2. List of top ten risk-significant systems, top ten risk-significant components for each one of the top ten risk-significant systems, and top ten risk-significant operator manual actions.
Please provide by June 17, 2020.
- 3. List of all Action Requests initiated including the following information for each AR:
a) AR number b) Brief, but complete problem description c) Priority or level d) Affected system e) Affected component f) Responsible plant department g) AR completion status If possible, provide this list in a format compatible with spreadsheet software (i.e. Excel example shown below) and ensure the list is searchable and can be filtered by system.
AR # Problem Priority System Component Org Status AR001 A RHR Pump 2 RHR 2-RHR- ENG Open failed flow criteria PMP-A per SR 5.0.5.4
- 4. List of outstanding corrective actions including the following information for each action:
a) Corrective action number b) Corrective action type (e.g., corrective action to prevent recurrence, enhancement, maintenance rule evaluation, etc.)
c) Brief, but complete corrective action description d) Associated AR number e) Corrective action initiation date f) Number of extensions g) Corrective action due date h) Completion status If possible, provide this list in a format compatible with spreadsheet software (i.e. Excel, example shown below) and ensure the list is searchable and can be filtered by system.
Corrective Type Description AR System Initiation Extensions Due Status Action # Date Date 001 CAPR Revise AR0058 RHR 03/05/20 2 09/15/20 Awaiting Procedure CARB NGK-003-4585 review
- 5. List of control room deficiencies with a brief description and corresponding AR and/or work order (WO) number.
- 6. List of operator workarounds and operator burdens with a brief description and corresponding AR number, searchable and filtered by system.
- 7. List of all currently extended or overdue ARs, searchable and filtered by system and sorted by initiation date, with the following information:
a) AR number b) Priority or Significance c) AR title and short description
- 8. List of all ARs that have been voided, cancelled, or deleted, searchable and filtered by system. Please provide the following information for each AR:
a) AR number b) Brief, but complete problem description c) Reason voided, cancelled, or deleted
- 9. List of all structures, systems, and components (SSCs) which were classified as (a)(1) in accordance with the Maintenance Rule since October 2018. Please include the following information for each system in (a)(1):
a) Date of classification in (a)(1) b) Reason for being placed in (a)(1) c) Planned actions and their status
- 10. List of Maintenance Preventable Functional Failures (MPFF) of risk-significant systems.
Please include actions completed and current status.
- 11. List of corrective maintenance work orders and modifications for safety-related (SR) structures, systems, and components and any work considered high risk. Please include the following information for each work order:
a) WO number b) Brief, but complete work description c) Affected system and components d) Date of initiation e) Date of completion (if completed) f) Associated CR (if applicable)
If possible, provide this list in a format compatible with spreadsheet software (i.e. Excel, example shown below) and ensure the list is searchable and can be filtered by system.
Work Description System Component Initiation Due Status Order # Date Date WO01345 Replace breaker SI 2A-SI-PMP, 01/05/19 05/15/19 Closed 2A-BKR-08-BB4 BKR-08-BB4 for 2A SI Pump.
- 12. Corrective action closeout packages, including ARs with description of corrective actions, for all NRC findings and licensee-identified violations (LIVs). Please include a cross-reference linking NRC finding numbers and LIVs to appropriate AR numbers.
- 13. Corrective action closeout packages, including ARs with description of corrective actions, for all licensee event reports (LERs) issued. Please include a cross reference linking LER number to appropriate AR number.
- 14. List of all NRC generic communications (e.g., Information Notices, Generic Letters, etc.) and industry operating experience (OE) documents (e.g., Part 21 reports, vendor information letters, information from other sites, etc.) evaluated by the site for applicability to the station, regardless of the determination of applicability. Please include the reference number (e.g.,
AR number) for the documents that evaluated the aforementioned OE information.
- 15. Copies of all quality assurance audits and/or assessments issued, including the last two audits/assessments of the corrective action program.
- 16. Copies of all department self-assessments.
- 17. Copy of the most recent integrated plant trend report, departmental trend report(s), and corrective action trend reports, including any human performance and equipment reliability trends.
- 18. Copy of the latest Corrective Action Program statistics (if already compiled) such as the number of ARs initiated by department, human performance errors by department, and others as may be available.
- 19. List of routine meetings involving the CAP to be held while team is onsite.
- 20. List of ARs related to equipment aging issues in the top ten risk-significant systems since July 2015 (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, etc.; environmental qualification).
Please provide the following information for each AR:
a) AR number b) Priority c) AR problem description
- 21. If performed, please provide any recent self-assessment of the site safety culture completed.
- 22. Copies of corrective action program documents related to cross-cutting issues (human performance, problem identification and resolution, and safety conscious work environment) identified via trending, self-assessments, safety review committee or other oversight methods
- 23. List of all root cause, apparent cause, common cause and related or similar equipment cause evaluations with a brief description.
- 24. Copy of Probabilistic Risk Assessment importance measures report, if available.
- 25. System health reports, system design basis documents, maintenance rule functions and status, and system description information upon notification of system selections.