Email: Oconee SLRA - RAI 4.6.1-1a - NRC Staff Comments
ML22130A011
Person / Time
Site: Oconee  Duke energy icon.png
Issue date: 04/25/2022
From: Angela Wu
NRC/NRR/DNRL/NLRP
To: Gambrell R, Guill P
Duke Energy Carolinas
Wu A, 301-415-2995
Shared Package
ML22130A003 List:
References
Download: ML22130A011 (1)


Text

From: Wu, Angela To: Guill, Paul F; Gambrell, Reene Cc: Johnson, Marieliz

Subject:

Oconee SLRA - RAI 4.6.1-1a - NRC Staff Comments Date: Monday, April 25, 2022 10:19:00 AM Hello Paul & Reene, Please see below for the staffs comments on RAI 4.6.1-1a:

1. The RAI number should be 4.6.1-1a, and not B4.6.1-1a stated in several places in the ePortal response.
2. The response states The material used for the fatigue exemption evaluation is SA-516 Grade 70 and that [t]he evaluation bounds the containment liner plate and cold penetrations that are part of the Oconee Units. Provide justification of why the fatigue exemption evaluation (of all six criteria) based on SA516 Grade 70 material is bounding of components with all other liner plate and cold penetration materials of construction listed in Table 4.6.1-1, OR alternatively evaluate each component material separately.
3. Wherever the response states 106 cycles, (e.g., criteria b, d, e, f) it should read 106 cycles or 1000000 cycles. In discussion of criteria (b), Therefore, 106 normal pressure cycles would have to should read Therefore, 106 normal pressure cycles fluctuations would have to. For criteria (b), also address the additional case of pressure fluctuations as a result of Type A tests (claimed to be considered in SLRA 4.6.1 as amended by response to RAI 4.6.1-1), which is expected to be greater than the normal pressure fluctuations stated in the response of -2.45 to 1.2 psig.
4. As stated in the followup RAI 4.6.1-1a alternative request, in the response provide reference to the calculation # that documents the described fatigue exemption evaluation, or provide the calculation on the ePortal for staff verification that a calculation exists.

Ill be expanding our public meeting agenda on Thursday, 4/28 to include this topic.

Thanks!

Angela