Letter Sequence Request |
|---|
EPID:L-2020-SLE-0002, Comment (2) of Raymond Hardy on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC, Point Beach, Units 1 and 2 (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance...
|
MONTHYEARML20329A2482020-11-16016 November 2020 Enclosure 3, Attachment 2, Appendix E Applicants Environmental Report Subsequent Operating License Renewal Point Beach Nuclear Plant Units 1 and 2 Project stage: Other ML20321A1872020-11-16016 November 2020 Single Positive Test Form Collected on 02/11/2020 Project stage: Request ML21033A4022021-01-22022 January 2021 NextEra Energy Point Beach - Point Beach Nuclear Plant - Units 1 and 2 Subsequent License Renewal Project stage: Other ML20351A3922021-01-26026 January 2021 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process (EPID No. L-2020-SLE-0002) (Docket No. 50 266 and 50-301) - Letter Project stage: Other PMNS20210090, Environmental Scoping Meeting Related to the Point Beach Nuclear Plant, Unit Nos. 1 and 2 (Point Beach), Subsequent License Renewal Application2021-02-0303 February 2021 Environmental Scoping Meeting Related to the Point Beach Nuclear Plant, Unit Nos. 1 and 2 (Point Beach), Subsequent License Renewal Application Project stage: Meeting ML21048A0362021-02-0404 February 2021 Comment (1) of Willard Sielaff on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21040A2232021-02-0505 February 2021 Comment (2) of Raymond Hardy on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC, Point Beach, Units 1 and 2 Project stage: Request ML21040A2282021-02-0808 February 2021 Comment (3) from Hannah Mortensen on Behalf of Physicians for Social Responsibility Wisconsin on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Point Beach Nuclear Plant, Units 1 & 2 Project stage: Request ML21050A0822021-02-12012 February 2021 Comment (4) of Geralyn Leannah Opposing Notice of Lntent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Project stage: Request ML21050A0832021-02-14014 February 2021 Comment (5) of Bruce Krawisz on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A0862021-02-14014 February 2021 Comment (6) of Theresa Deluca Opposing Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A0882021-02-16016 February 2021 Comment (7) of Randy Connour on Notice of Lntent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Project stage: Request ML21050A0892021-02-16016 February 2021 Comment (8) of Eric Newgent on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21056A5612021-02-17017 February 2021 Physicians for Social Responsibility (Psr) Request for Extension of Scoping Comment Period Project stage: Request ML21042B9452021-02-17017 February 2021 Scoping and Process Meeting - February 17, 2021 Project stage: Meeting ML21062A1922021-02-17017 February 2021 Transcript from Point Beach Nuclear Plant Subsequent License Renewal Scoping Meeting Project stage: Meeting ML21075A3432021-02-17017 February 2021 Meeting Summary: Public Scoping Meeting for the Environmental Review of the Subsequent License Renewal Application for Point Beach Nuclear Plant, Unit Nos. 1 and 2 (EPID No.: L-2020-SLE-0002) - Summary Project stage: Meeting ML21050A0992021-02-17017 February 2021 Comment (10) of Ann Rogers Opposing Notice of Lntent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Project stage: Request ML21050A1052021-02-17017 February 2021 Comment (12) of Shahla Werner Opposing Notice of Lntent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Project stage: Request ML21050A0922021-02-17017 February 2021 Comment (9) of Diane Palecek Opposing Notice of Lntent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Project stage: Request ML21050A1022021-02-17017 February 2021 Comment (11) of John Duffin Opposing Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1092021-02-18018 February 2021 Comment (13) of Pamela Richard Opposing Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1272021-02-18018 February 2021 Comment (20) from Pam Nelson Opposing Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1322021-02-18018 February 2021 Comment (24) of Sandra Couch on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Nexteraenergy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1182021-02-18018 February 2021 Comment (16) from Andrew Benson Supporting Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1252021-02-18018 February 2021 Comment (19) of Ellen Atkison Opposing Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1222021-02-18018 February 2021 Comment (18) of Kristina Mageau on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Nexteraenergy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Project stage: Request ML21050A1212021-02-18018 February 2021 Comment (17) from Stephen Roddy Opposing Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1332021-02-18018 February 2021 Comment (25) of Mark Giese on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1312021-02-18018 February 2021 Comment (23) from Patrick Bosold Opposing Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1382021-02-18018 February 2021 Comment (27) of Leonard Kellum Opposing Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1342021-02-18018 February 2021 Comment (26) of Jim Yarbrough Opposing Notice of Lntent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Project stage: Request ML21050A1292021-02-18018 February 2021 Comment (22) from Dennis Schaef on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1162021-02-18018 February 2021 Comment (14) of Marie Luna on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1282021-02-18018 February 2021 Comment (21) of Karl Koessel Opposing Notice of Lntent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Project stage: Request ML21050A1172021-02-18018 February 2021 Comment (15) of Joann Nishiura on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Nexteraenergy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1592021-02-19019 February 2021 Comment (29) of Philip Ratcliff on Notice of Lntent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Project stage: Request ML21062A0162021-02-19019 February 2021 Comment (31) of Karen Wilson on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21062A0152021-02-19019 February 2021 Comment (30) of Claire Gervais Opposing Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1392021-02-19019 February 2021 Comment (28) of Croitiene Ganmoryn on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21062A0182021-02-20020 February 2021 Comment (32) of Larry Troshynski on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21062A0262021-02-21021 February 2021 Comment (35) of Dwight Rousu on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21062A0282021-02-21021 February 2021 Comment (37) of Karen Kirschling on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21062A0272021-02-21021 February 2021 Comment (36) of Ernest Fuller on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21062A0242021-02-21021 February 2021 Comment (34) of Miriam Kurland Opposing Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21062A0232021-02-21021 February 2021 Comment (33) of Kristin Womack on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21062A0292021-02-25025 February 2021 Comment (38) of Satya Vayu on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21062A0332021-02-26026 February 2021 Comment (41) of Gerrit Bruhaug Opposing Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21062A0342021-02-26026 February 2021 Comment (42) of Avery Schwab on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21062A0352021-02-26026 February 2021 Comment (43) of Dawn Wallander on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request 2021-02-19
[Table View] |
Text
3/9/2021 blob:https://www.fdms.gov/58f70cd4-2a19-4de6-9373-43280c86a6bc blob:https://www.fdms.gov/58f70cd4-2a19-4de6-9373-43280c86a6bc 1/3 PUBLIC SUBMISSION As of: 3/9/21 3:50 PM Received: March 03, 2021 Status: Pending_Post Tracking No. klu-d1rj-y66e Comments Due: March 03, 2021 Submission Type: Web Docket: NRC-2020-0277 Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Comment On: NRC-2020-0277-0001 Notice of Intent To Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Document: NRC-2020-0277-DRAFT-0187 Comment on FR Doc # 2021-02001 Submitter Information Name: Alfred Meyer Address:
New York, NY, 10028 Email: alfred.c.meyer@gmail.com Phone: 2022158208 General Comment SCOPING COMMENTS REGARDING THE PROPOSED LICENSE EXTENSION FOR THE POINT BEACH NUCLEAR POWER PLANT Re: Docket ID: NRC-2020-0277 Point Beach Nuclear Plant, Units 1 & 2 MARCH 3, 2021
Dear Friends,
As a member of Physicians for Social Responsibility - Wisconsin, I care deeply about the public health and environmental well being of Wisconsinites, Lake Michigan, and all the great lakes.
Operating two nuclear reactors on the shore of Lake Michigan, creating more highly radioactive and toxic wastes at the edge of one of the worlds greatest fresh water resources, is cause for extreme caution.
I have fwo topics for inclusion in the scoping of the EIS for Point Beach License Extension. Please address each of the sub points listed in the following. I look forward to your reply to these comments.
Neutron Embrittlement of Reactor Pressure Vessels Lake Levels and Stronger Bigger Storms Neutron Embrittlement of Reactor Pressure Vessels SUNI Review Complete Template=ADM-013 E-RIDS=ADM-03 ADD: Phyllis Clark, Bill Rogers, Kevin Folk, Stacey Imboden, Mary Neely Comment (182)
Publication Date:2/1/2021 Citation: 86 FR 7747
3/9/2021 blob:https://www.fdms.gov/58f70cd4-2a19-4de6-9373-43280c86a6bc blob:https://www.fdms.gov/58f70cd4-2a19-4de6-9373-43280c86a6bc 2/3 Point 1:
Earlier NRC reporting identified Unit 2 at Point Beach as one of the two most embrittled reactors in the United States. Currently NRC opinion seems to discount the risks that the additional embrittlement over time incurs. A rule change may alter the official listed status of a facility, but it cannot alter the laws of physics and metallurgy.
Before any license extension may be granted for Point Beach, the NRC must conduct a transparent, thorough and publically reported examination of the sample coupons within the Point Beach reactors.
These bits of metal were placed in the reactor vessels so that at a later time, like now, they could be examined to assess the degree of neutron bombardment degradation and embrittlement of the reactor pressure vessel metal.
There is plenty of time in which to accomplish this important empirical task, in that current licenses expire in 2030 and 2033. With what is at stake, the Great Lakes and the health of so many who live around them, it is unconscionable to judge reactor integrity from a computer modeled calculation rather than examining empirical evidence and openly discussing what is found and what that means regarding additional decades of reactor operation.
No license extension should be granted unless and until empirical evidence is used to determine that continued reactor operation is safe based on the analysis of neutron embrittlement of the reactor pressure vessel metal.
Point 2:
Issuance of a license extension for Point Beach should be contingent upon a thorough and transparent hard look at an autopsy of the soon to be closed Palisades Nuclear Power Plant in Michigan, and solid judgment that the evidence discovered adequately addresses any and all safety of operation concerns at Point Beach.
Here again there is available empirical evidence to examine. To estimate or calculate or postulate evidence is malfeasance in contrast to readily available empirical evidence.
Point 3:
A comprehensive listing and analysis of all NRC safety notices for Point Beach needs to be conducted before license extension.
There are past periods wherein Point Beach was the worst or next to worst operated site in the United States, accounting for a disproportionate percentage of NRC Red Findings.
Do any of these past events portend degradation of equipment condition and function, especially when considering an additional 20 years of operation?
Lake Levels In 2013 Lake Michigan was at a historic low water level. Seven years later in 2020, Lake Michigan was at a historic high water level. At the same time, within the past few weeks we have seen a storm system that covered almost the entire continental United States and froze the state of Texas.
The greater volatility and extremes of weather events is consistent with basic climate science and the weather phenomenon we observe and experience. How will these future extreme events impact the site
3/9/2021 blob:https://www.fdms.gov/58f70cd4-2a19-4de6-9373-43280c86a6bc blob:https://www.fdms.gov/58f70cd4-2a19-4de6-9373-43280c86a6bc 3/3 integrity and function, ensuring that public health and environmental safety are paramount?
Point 1)
There must be a full and hard look at the physical characteristics of the Point Beach site relative to providing uninterrupted access of personnel and materials and electricity during times of high water levels, significant rainfall, and strong and persistent winds.
Point 2)
Climate impact projections must include examination of the synergistic effects of multiple weather components. High lake levels, heavy rains and prolonged high winds are three such factors. Higher lake levels make storm damage worse. Point Beach is right at the waters edge, and not far above current lake levels.
Point 3)
Evaluate all mechanical components on site for potential flooding, especially durability of off site power supply, to withstand such extreme weather conditions.
Point 4)
Examine and report on effects of higher lake levels on ground water levels, movements and contamination in the area of the Point Beach facility.