MONTHYEARML24004A0792024-01-18018 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0041 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) U-604780, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML22034A9832022-02-15015 February 2022 FRN - Notice of Issuance of COVID-19 Exemptions Issued in January 2022 ML22013B2772022-01-14014 January 2022 Exemption from Specific Requirements of 10 CFR Part 26 (EPID L-2022-LLE-0003 (COVID-19)) ML21112A0072021-04-29029 April 2021 Exemption from Specific Requirements of 10 CFR Part 26 (EPID L-2021-LLE-0027 (COVID-19)) ML20339A5382020-12-16016 December 2020 Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0232 (COVID-19)) ML20323A4342020-12-11011 December 2020 Exemption from Annual Force-on-Force Exercise Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Subsection VI.C.3(l)(1) (EPID L-2020-LLE-0200 (COVID-19)) ML20339A3182020-12-0303 December 2020 Incoming Request-Clinton-Exelon Generation Co., LLC NMP1L3362, Request for an Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force (FOF) Exercises Due to COVID- 19 Public Health Emergency2020-11-13013 November 2020 Request for an Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force (FOF) Exercises Due to COVID- 19 Public Health Emergency ML20243A0002020-09-23023 September 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for August 2020 ML20209A0002020-08-13013 August 2020 Exemption Request from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel (EPID-L-2020-LLE-0119 (COVID-19)) ML19092A2622019-07-15015 July 2019 Exemption from 10 CFR 2.109 (B)(Epid L-L-2018-LLE-0018) ML19092A2582019-07-11011 July 2019 Letter, Exemption from the Requirements of 10 CFR Part 54, Section 54.17(A) ML19193A0152019-07-11011 July 2019 Exemption from the Requirements of 10 CFR 54.17(A) RS-18-137, Request for Exemption from 10 CFR 2.109(b)2018-11-0808 November 2018 Request for Exemption from 10 CFR 2.109(b) ML16257A4802017-01-23023 January 2017 Letter Exemption from the Requirements of 10 CFR Part 73, Sections 55(p)(1)(i) and (p)(1)(ii) Related to the Suspension of Security Measures in an Emergency or During Severe Weather (CAC Nos. MF8275 - MF8278) ML0614302462006-06-27027 June 2006 TMI and Zion - Exemption from the Requirements of 10 CFR 50.54(a)(3) Re Submittal of Changes to Quality Assurance Topical Report RS-04-086, Request for Exemption from 10 CFR 50 Appendix J in Support of Request for License Amendment Related to Application of Alternative Source Term2004-07-0101 July 2004 Request for Exemption from 10 CFR 50 Appendix J in Support of Request for License Amendment Related to Application of Alternative Source Term ML0233805002002-11-25025 November 2002 Exemption Request from the Requirements of 10 CFR 50.36(C)(1) 2024-01-18
[Table view] Category:Letter
MONTHYEARIR 05000461/20230042024-02-0202 February 2024 Integrated Inspection Report 05000461/2023004 ML23361A1572024-01-24024 January 2024 Audit Plan in Support of Review of License Amendment Request Regarding Revision of Technical Specifications Related to Reactor Water Cleanup Isolation ML24004A0792024-01-18018 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0041 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000461/20234022023-12-27027 December 2023 Security Baseline Inspection Report 05000461/2023402 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 IR 05000461/20235012023-12-0505 December 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000461/2023501 ML23284A2512023-11-22022 November 2023 Amendment No. 250 to Adopt TSTF-332 ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000461/20230032023-11-0808 November 2023 Integrated Inspection Report 05000461/2023003 ML22300A2212023-11-0202 November 2023 Preliminary Decommissioning Cost Estimate and Fuel Management Plan RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 RS-23-090, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2023-09-0707 September 2023 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs IR 05000461/20234202023-08-29029 August 2023 Security Baseline Inspection Report 05000461/2023420 RS-23-081, Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2023-08-21021 August 2023 Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation IR 05000461/20230022023-08-0404 August 2023 Integrated Inspection Report 05000461/2023002 RS-23-085, Supplemental Information Related to Request for Partial Site Release2023-08-0303 August 2023 Supplemental Information Related to Request for Partial Site Release ML23209A8102023-07-28028 July 2023 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23198A0152023-07-27027 July 2023 License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23202A0992023-07-24024 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000461/2023004 ML23200A2592023-07-24024 July 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting-Meeting Summary IR 05000461/20234012023-07-19019 July 2023 Cyber Security Inspection Report 05000461/2023401 ML23194A1662023-07-19019 July 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Partial Site Release ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-073, Request for Partial Site Release2023-06-0707 June 2023 Request for Partial Site Release IR 05000461/20230102023-05-26026 May 2023 Triennial Fire Protection Inspection Report 05000461/2023010 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23143A3182023-05-23023 May 2023 Information Meeting (Open House) with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Clinton Power Station, Unit 1 IR 05000461/20230012023-05-0404 May 2023 Integrated Inspection Report 05000461/2023001 ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000461/20220062023-03-0101 March 2023 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2022006) RS-23-039, Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air2023-03-0101 March 2023 Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air ML23031A2972023-03-0101 March 2023 Issuance of Amendment No. 248 Adoption of TSTF-269, Revision 2 RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23039A1852023-02-10010 February 2023 Integrated Inspection Report 05000461/2022004 07201046/2022001 RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000461/20220112023-01-27027 January 2023 Biennial Problem Identification and Resolution Inspection Report 05000461/2022011 RS-23-002, Application to Adopt TSTF-332, ECCS Response Time Testing2023-01-13013 January 2023 Application to Adopt TSTF-332, ECCS Response Time Testing ML23005A0682023-01-0505 January 2023 Notification of NRC Fire Protection Team Inspection Request for Information: Inspection Report 05000461/2023010 ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20224022022-12-0606 December 2022 Security Baseline Inspection Report 05000461/2022402 RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI 2024-02-02
[Table view] |
Text
December 16, 2020 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)
Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
CLINTON POWER STATION, UNIT NO. 1 - EXEMPTION FROM SELECT REQUIREMENTS OF 10 CFR PART 26 (EPID L-2020-LLE-0232 [COVID-19])
Dear Mr. Hanson:
The U.S. Nuclear Regulatory Commission (NRC) has approved the requested exemption from specific requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 26, Fitness for Duty Programs, Section 26.205, Work hours, for Clinton Power Station, Unit No. 1 (Clinton). This action is in response to the Exelon Generation Company, LLC (Exelon, the licensee) application dated December 3, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20339A318), which cited the March 28 and November 10, 2020 (ADAMS Accession Nos. ML20087P237 and ML20261H515, respectively), letters from Mr. Ho Nieh describing a process to request expedited review of certain exemptions from 10 CFR Part 26 during the Coronavirus Disease 2019 (COVID-19) public health emergency (PHE).
The application provided the following information:
A statement that explains how, and for which covered groups, the COVID-19 PHE impacts the licensees ability to meet the work-hour control requirements of 10 CFR 26.205(d)(1)-(d)(7);
A statement that describes how an exemption from the 10 CFR 26.205(d)(1)-(d)(7) work-hour control requirements would be used to manage the impact of the COVID-19 PHE on maintaining plant operational safety and security; A list of positions for which Exelon may implement alternative work-hour controls at Clinton upon the NRC granting the requested exemption. From this, the NRC has determined the positions for which Exelon will maintain current work-hour controls under 10 CFR 26.205(d)(1)-(d)(7) and the positions at Clinton for which Exelon requested the exemption; The date and time when Exelon will begin implementing site-specific COVID-19 PHE fatigue-management controls at Clinton for personnel specified in 10 CFR 26.4(a);
B. Hanson A statement that Exelons site-specific COVID-19 fatigue-management controls at Clinton are consistent with the constraints outlined in the March 28 and November 10, 2020, letters; and A statement that Exelon will establish alternative controls at Clinton for the management of fatigue during the period of the exemption and, at a minimum, the controls ensure that, for individuals subject to these alternative controls:
o Individuals will not work more than 16 work hours in any 24-hour period and not more than 86 work hours in any 7-day period, excluding shift turnover, o A minimum 10-hour break is provided between successive work periods, o 12-hour shifts are limited to not more than 14 consecutive days, o A minimum of 6 days off is provided in any 30-day period, and o Requirements have been established for behavioral observation and self-declaration during the period of the exemption.
Therefore, the NRC finds that the technical basis for an exemption described in the March 28 and November 10, 2020, letters is applicable to the licensees specific request.
Section 26.9, Specific exemptions, of 10 CFR allows the NRC to grant exemptions from the requirements of 10 CFR Part 26. The NRC staff has determined that granting the licensees requested exemption is authorized by law, will not endanger life or property or the common defense and security, and is otherwise in the public interest.
The underlying purpose of 10 CFR 26.205(d) is to prevent impairment from fatigue due to duration, frequency, or sequencing of successive shifts. Based on the evaluation provided in the NRCs March 28 and November 10, 2020, letters and the criteria discussed above, no new accident precursors are created by using whatever licensee staff resources may be necessary or available during the term of this exemption to respond to a plant emergency and to ensure that the plant maintains a safe and secure status. Therefore, the probability of postulated accidents is not increased. Also, the consequences of postulated accidents are not increased because there is no change in the types of accidents previously evaluated. The requested exemption would allow the use of licensee staff resources as may be necessary to maintain safe operation of the plant and to respond to a plant emergency. Therefore, the NRC finds that there is no undue risk to public health and safety from granting the requested exemption.
The requested exemption would allow the use of licensee security staff resources as may be necessary to ensure the common defense and security. Therefore, the NRC finds that there is no impact on common defense and security from granting the requested exemption.
Due to the impacts that the COVID-19 PHE has had on the licensees ability to comply with the work-hour controls of 10 CFR 26.205(d), the importance of maintaining the operations of Clinton, and the controls the licensee has established, the NRC finds that granting the requested exemption is in the public interest.
Granting the requested exemption from the requirements of 10 CFR 26.205 is categorically excluded under 10 CFR 51.22(c)(25), and there are no extraordinary circumstances present that would preclude reliance on this exclusion. The NRC staff determined, per 10 CFR 51.22(c)(25)(vi)(I), that the requirements from which the exemption is sought involve other requirements of an administrative, managerial, or organizational nature.
B. Hanson The NRC staff also determined that approval of this exemption involves no significant hazards consideration because it does not authorize any physical changes to the facility or any of its safety systems, does not authorize changes to any of the assumptions or limits used in the facility licensees safety analyses, and does not introduce any new failure modes. There is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite because this exemption does not affect any effluent release limits as provided in the facility licensees technical specifications or by the regulations in 10 CFR Part 20, Standards for Protection Against Radiation. There is no significant increase in individual or cumulative public or occupational radiation exposure because this exemption does not affect limits on the release of any radioactive material or the limits provided in 10 CFR Part 20 for radiation exposure to workers or members of the public. There is no significant construction impact because this exemption does not involve any changes to a construction permit. There is no significant increase in the potential for or consequences from radiological accidents because the exemption does not alter any of the assumptions or limits in the licensees safety analysis. In addition, the NRC staff determined that there would be no significant impacts to biota, water resources, historic properties, cultural resources, or socioeconomic conditions in the region. Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the approval of this exemption request.
Based on the above, the NRC staff finds that (1) the exemption is authorized by law, (2) the exemption will not endanger life or property or the common defense and security, and (3) the exemption is otherwise in the public interest.
This exemption is effective from December 17, 2020, through February 14, 2021.
Sincerely, Digitally signed by David David J. J. Wrona Date: 2020.12.16 Wrona 17:19:22 -05'00' David J. Wrona, Acting Deputy Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-461 cc: Listserv
ML20339A538 ** via concurrence from model Safety Evaluation OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DRO/IOLB/BC NSIR/DPCP/RSB/BC**
NAME JWiebe (RHaskell for) SRohrer (JBurkhardt for) CCowdrey ABowers DATE 12/15/2020 12/7/2020 12/8/2020 3/30/2020 OFFICE NMSS/REFS/ERLRB/BC** OGC - NLO NRR/DORL/LPL3/BC NRR/DORL/DD(A)
NAME RElliott TCampbell NSalgado DWrona DATE 3/31/2020 12/15/2020 12/16/2020 12/16/2020