Category:Exemption from NRC Requirements
MONTHYEARML24004A0792024-01-18018 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0041 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) U-604780, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML22034A9832022-02-15015 February 2022 FRN - Notice of Issuance of COVID-19 Exemptions Issued in January 2022 ML22013B2772022-01-14014 January 2022 Exemption from Specific Requirements of 10 CFR Part 26 (EPID L-2022-LLE-0003 (COVID-19)) ML21112A0072021-04-29029 April 2021 Exemption from Specific Requirements of 10 CFR Part 26 (EPID L-2021-LLE-0027 (COVID-19)) ML20339A5382020-12-16016 December 2020 Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0232 (COVID-19)) ML20323A4342020-12-11011 December 2020 Exemption from Annual Force-on-Force Exercise Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Subsection VI.C.3(l)(1) (EPID L-2020-LLE-0200 (COVID-19)) ML20339A3182020-12-0303 December 2020 Incoming Request-Clinton-Exelon Generation Co., LLC NMP1L3362, Request for an Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force (FOF) Exercises Due to COVID- 19 Public Health Emergency2020-11-13013 November 2020 Request for an Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force (FOF) Exercises Due to COVID- 19 Public Health Emergency ML20243A0002020-09-23023 September 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for August 2020 ML20209A0002020-08-13013 August 2020 Exemption Request from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel (EPID-L-2020-LLE-0119 (COVID-19)) ML19092A2622019-07-15015 July 2019 Exemption from 10 CFR 2.109 (B)(Epid L-L-2018-LLE-0018) ML19092A2582019-07-11011 July 2019 Letter, Exemption from the Requirements of 10 CFR Part 54, Section 54.17(A) ML19193A0152019-07-11011 July 2019 Exemption from the Requirements of 10 CFR 54.17(A) RS-18-137, Request for Exemption from 10 CFR 2.109(b)2018-11-0808 November 2018 Request for Exemption from 10 CFR 2.109(b) ML16257A4802017-01-23023 January 2017 Letter Exemption from the Requirements of 10 CFR Part 73, Sections 55(p)(1)(i) and (p)(1)(ii) Related to the Suspension of Security Measures in an Emergency or During Severe Weather (CAC Nos. MF8275 - MF8278) ML0614302462006-06-27027 June 2006 TMI and Zion - Exemption from the Requirements of 10 CFR 50.54(a)(3) Re Submittal of Changes to Quality Assurance Topical Report RS-04-086, Request for Exemption from 10 CFR 50 Appendix J in Support of Request for License Amendment Related to Application of Alternative Source Term2004-07-0101 July 2004 Request for Exemption from 10 CFR 50 Appendix J in Support of Request for License Amendment Related to Application of Alternative Source Term ML0233805002002-11-25025 November 2002 Exemption Request from the Requirements of 10 CFR 50.36(C)(1) 2024-01-18
[Table view] Category:Letter
MONTHYEARIR 05000461/20230042024-02-0202 February 2024 Integrated Inspection Report 05000461/2023004 ML23361A1572024-01-24024 January 2024 Audit Plan in Support of Review of License Amendment Request Regarding Revision of Technical Specifications Related to Reactor Water Cleanup Isolation ML24004A0792024-01-18018 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0041 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000461/20234022023-12-27027 December 2023 Security Baseline Inspection Report 05000461/2023402 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 IR 05000461/20235012023-12-0505 December 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000461/2023501 ML23284A2512023-11-22022 November 2023 Amendment No. 250 to Adopt TSTF-332 ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000461/20230032023-11-0808 November 2023 Integrated Inspection Report 05000461/2023003 ML22300A2212023-11-0202 November 2023 Preliminary Decommissioning Cost Estimate and Fuel Management Plan RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 RS-23-090, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2023-09-0707 September 2023 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs IR 05000461/20234202023-08-29029 August 2023 Security Baseline Inspection Report 05000461/2023420 RS-23-081, Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2023-08-21021 August 2023 Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation IR 05000461/20230022023-08-0404 August 2023 Integrated Inspection Report 05000461/2023002 RS-23-085, Supplemental Information Related to Request for Partial Site Release2023-08-0303 August 2023 Supplemental Information Related to Request for Partial Site Release ML23209A8102023-07-28028 July 2023 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23198A0152023-07-27027 July 2023 License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23202A0992023-07-24024 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000461/2023004 ML23200A2592023-07-24024 July 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting-Meeting Summary IR 05000461/20234012023-07-19019 July 2023 Cyber Security Inspection Report 05000461/2023401 ML23194A1662023-07-19019 July 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Partial Site Release ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-073, Request for Partial Site Release2023-06-0707 June 2023 Request for Partial Site Release IR 05000461/20230102023-05-26026 May 2023 Triennial Fire Protection Inspection Report 05000461/2023010 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23143A3182023-05-23023 May 2023 Information Meeting (Open House) with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Clinton Power Station, Unit 1 IR 05000461/20230012023-05-0404 May 2023 Integrated Inspection Report 05000461/2023001 ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000461/20220062023-03-0101 March 2023 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2022006) RS-23-039, Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air2023-03-0101 March 2023 Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air ML23031A2972023-03-0101 March 2023 Issuance of Amendment No. 248 Adoption of TSTF-269, Revision 2 RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23039A1852023-02-10010 February 2023 Integrated Inspection Report 05000461/2022004 07201046/2022001 RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000461/20220112023-01-27027 January 2023 Biennial Problem Identification and Resolution Inspection Report 05000461/2022011 RS-23-002, Application to Adopt TSTF-332, ECCS Response Time Testing2023-01-13013 January 2023 Application to Adopt TSTF-332, ECCS Response Time Testing ML23005A0682023-01-0505 January 2023 Notification of NRC Fire Protection Team Inspection Request for Information: Inspection Report 05000461/2023010 ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20224022022-12-0606 December 2022 Security Baseline Inspection Report 05000461/2022402 RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI 2024-02-02
[Table view] |
Text
COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements Submitted: Dec 03, 2020
- 1. Submitter Name/Title:
Patrick R. Simpson, Senior Manager Licensing
- 2. Email Address Please enter the email address for which you would like to receive communications regarding this request.
Patrick.Simpson@exeloncorp.com
- 3. Organization Exelon Generation Co., LLC
- 4. Plant Name Clinton
- 5. Plant Unit(s): 1
- 6. Need By Date 2020-12-17
- 7. Docket Number(s)
Example: 05000313 05000461
- 8. License Number(s)
Example: DPR-51 NPF-62
- 9. NRC Licensing Project Manager J. WIEBE
- 10. Statement that the licensee above can no longer meet the work hour controls of 10 CFR 26.205(d) for certain personnel or groups of personnel specified in 10 CFR 26.4(a) because of site specific issues as a result of the COVID-19 public health emergency (PHE).
As a result of the Coronavirus Disease 2019 (COVID-19) public health emergency (PHE), Exelon Generation Company, LLC (EGC) is requesting NRC approval to utilize the alternative work hour controls delineated in the NRCs March 28, 2020 letter (ML20087P237) and November 10, 2020 letter (ML20261H515) for Clinton Power Station (CPS) for the covered workers noted below.
The alternative controls will support maintaining staffing requirements as a result of the recent increase in personnel absence due to COVID-19 positive test results or contact tracing quarantines that cannot be accommodated by the current work hour control requirements of 10 CFR 26.205(d)(1) through (d)(7) to support plant operational safety and security. The increase in COVID-19 cases in the State of Illinois and communities surrounding CPS could impact the station's ability to meet the work hour controls of 10 CFR 26.205(d) in maintaining minimum staffing and ensuring adequate qualified individuals of personnel specified in 10 CFR 26.4(a)(1) through (a)(5) are available to complete necessary operations, tests, inspections, and maintenance in a manner that supports nuclear safety and security. Therefore, EGC has determined that implementing the alternative work hour controls would allow CPS to proactively take steps to ensure added flexibility is available to facilitate further worker and community protection and ensure safe operation during the period of the exemption.
Exemption from the 10 CFR 26.205(d)(1) through (d)(7) requirements is intended to prevent and limit the spread of COVID-19 and to mitigate its effect should CPS staffing be significantly impacted. CPS intends to use the alternative controls, where necessary, to efficiently perform operation, inspection, maintenance and testing activities that cannot be performed in accordance with the Centers for Disease Control and Prevention (CDC) recommendations related to social distancing, mask usage, worker screening, and limiting close proximity work. This practice will reduce the number of people involved in specific activities to limit the potential spread of COVID 19 and supports CPS's continuing efforts to maintain CDC recommendations. In addition, the alternative controls will be used to mitigate the staffing impacts should personnel absences challenge required staffing levels.
As the US Departments of Homeland Security and Energy have stated in their guidance, the electric grid and nuclear plant operation make up the nations critical infrastructure similar to the medical, food, communications, and other critical industries. CPS's
operation must be conducted such that the plant is available when needed, including during the critical peak winter loads.
In accordance with the NRC Letter from H. Nieh to NEI, U.S. Nuclear Regulatory Commission Planned Actions Related to the Requirements for Work Hour Controls During the Coronavirus Disease 2019 Public Health Emergency, dated March 28, 2020 (ML20087P237) and NRC Letter from H. Nieh to NEI, "U.S. Nuclear Regulatory Commission Updated Planned Actions Related to Certain Requirements for Operating and Decommissioning Reactor Licensees During the Coronavirus Disease 2019 Public Health Emergency," dated November 10, 2020 (ML20261H515), the following work groups would begin phasing in on December 17 , 2020 the site-specific alternative controls, as necessary, to minimize transition issues:
10 CFR 26.4(a)(1) Operators 10 CFR 26.4(a)(2) Health Physics and Chemistry 10 CFR 26.4(a)(3) Fire Brigade 10 CFR 26.4(a)(4) Maintenance 10 CFR 26.4(a)(5) Security
- 11. List of personnel or groups of personnel specified in 10 CFR 26.4(a) for which the licensee will maintain current work hour controls under 10 CFR 26.205(d)(1)-(d)(7).
N/A
- 12. List and description of alternative controls for the management of fatigue to address site specific issues as a result of the COVID-19 PHE.
CPS's site-specific COVID-19 PHE fatigue-management controls are consistent with the constraints outlined in the referenced NRC letters and their attachments and enclosures.
CPS will continue to follow the fatigue management controls, behavioral observation requirements, and self-declaration allowances currently delineated within the EGC work hour control program and procedures (LS-AA-119, SY-AA-102, SY-AA-103-500).
The requirements of 10 CFR 26.33, Behavioral observation; 10 CFR 26.209, Self-declarations; and 10 CFR 26.211, Fatigue assessments remain in effect during the period of the exemption. These requirements provide reasonable assurance that should personnel become impaired due to fatigue, requirements and processes are in place to identify the impairment through observation by plant staff or by worker self-declaration, and to assess and address instances of impairment through fatigue assessments.
- 13. Date when the licensee will begin implementing its site-specific COVID-19 PHE fatigue-management controls for personnel specified in 10 CFR 26.4(a) 2020-12-17
- 14. The time when the licensee will begin implementing its alternative controls for the management of fatigue for personnel (or group of personnel) specified in 10 CFR 26.4(a).
00:00
- 15. Statement that the licensees site specific alternative controls for the management of fatigue are consistent with the minimum alternative controls listed below.
CPS's site-specific COVID-19 PHE fatigue-management controls are consistent with the constraints outlined in the referenced NRC letters, dated March 28, 2020 and November 10, 2020.
- 16. Does Licensee continue to meet the requirements of 10 CFR 26.33, Behavioral observation; 10 CFR 26.209, Self declarations; and 26.211, Fatigue assessments.
Yes
- 17. The alternative controls include the following, as a minimum:
- 1. Individuals will not work more than 16 work-hours in any 24-hour period and not more than 86 work-hours in any 7-day period, excluding shift turnover;
- 2. A minimum 10-hour break is provided between successive work periods;
- 3. 12-hour shifts are limited to not more than 14 consecutive days;
- 4. A minimum of 6-days off are provided in any 30-day period; and
- 5. Changes in actions to meet requirements for behavioral observation for both acute and cumulative fatigue and self declaration during the period of the exemption as appropriate due to potential for increased worker fatigue.
Yes
- 18. Additional Information:
Use the area below to provide any additional information related to your exemption request.
Upon NRC approval, CPS would implement the alternative controls described in the referenced NRC letters for the management of fatigue on December 17, 2020 for an initial period of 60 days. Near the end of the 60-day period, if COVID-19 pandemic conditions persist at the site affecting staffing requirements and the efforts to maintain CDC, state and local recommendations related to social distancing, worker screening, and limiting close-proximity work, as well as of particular concern is the COVID-19 challenge in the immediate community of CPS, an additional email supplement request may be submitted to extend the 60-day exemption period implementation.