ML20332A138

From kanterella
Jump to navigation Jump to search

Comment (140) of James Lynch on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2
ML20332A138
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 11/23/2020
From: Jeffery Lynch
- No Known Affiliation
To:
Office of Administration
References
85FR69665 00140, NRC-2020-0234
Download: ML20332A138 (1)


Text

Page 1 of 1 SUNI Review Complete Template=ADM-013 E-RIDS=ADM-03 ADD: Tam Tran, Robert Elliott, Joseph McManus, Antoinette Smith-Walker, As of: 11/27/20 11:39 AM Mary Neely Received: November 23, 2020 Comment (140)

Status: Pending_Post PUBLIC SUBMISSION Publication Date: 11/3/2020 CITATION 85 FR 69665 Tracking No. 1k4-9k9d-iotm Comments Due: November 23, 2020 Submission Type: API Docket: NRC-2020-0234 Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Comment On: NRC-2020-0234-0001 Notice of Intent To Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Document: NRC-2020-0234-DRAFT-0140 Comment on FR Doc # 2020-23463 Submitter Information Name: James Lynch Address:

8263 Oakwood Dr.

KING GEORGE, VA, 22485 Email: jplynch@crosslink.net Organization: N/A General Comment Dear Sirs; I am concerned as follows:

1. Approving a outdated generic Environmental Impact Statement is dangerous. North Anna became the first operating nuclear station in the U.S. to shut down because of a temblor in 2011 and the first to experience an event that exceeded its design basis. Both reactors sit on top of a known fault line.
2. The NRC should do a full and thorough Environmental Impact Statement which evaluates among other items:

- The long-term storage of nuclear waste.

- The condition of the reactor foundation, liners, electrical cables, etc.

- Whether or not these aging reactors can withstand another earthquake.

Thank you for considering requiring a full EIS.