Notice of Violation from Insp on 890528-0701.Violation Noted:On 890627,480 Volt Breaker for 11 Inverter Instrument Bus II Deenergized & Removed from Motor Control Ctr 1AC1, Instead of 480 Volt Breaker for 11 Battery Charger
ML20246N441
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 07/13/1989
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20246N439 List:
References
50-282-89-18, 50-306-89-18, NUDOCS 8907190372
Download: ML20246N441 (1)


Text

. _ _ _ _ _ _ _ - - - _ - _ _

t NOTICE 0F VIOLATION Northern States' Power Company Docket No. 50-282 Docket No. 50-306 As a result;of the inspection conducted on May 28 through July 1,1989, and

~in accordance with the " General Policy and Procedures for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1988), the following violation was identified:

'10 CFR 50, Appendix B, Criterion V,' Instructions, Procedures, and Drawings, reouires that activities affecting quality shall be prescribed by documented instructions and procedures of a type appropriate to'the circumstances and shall-be accomplished in accordance with these instructions and procedures.

Administrative Control Directive SACD3.2, Work Control, Rev.15, Step 6.14.3 requires' work procedures to be at the job site and that the requirements

- and/or precautions shall be followed and. completion of procedural steps documented.

Contrary to the above, on June 27, 1989, the 480 volt breaker for the 11 Inverter Instrument Bus II was deenergized and removed from Motor Control Center 1AC1, instead of the 480 volt breaker for the 11 Battery Charger. as specified by Work Request N4669.

This is a Severity Level IV violation.(Supplement 1).

Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or explanation in. reply,' including for each violation:

(1) the corrective actions that have been taken-and the results achieved;'(2) the corrective actions that will be taken to avoid further violations; and (3) the date when u

full compliance'will be achieved. Consideration may be given to extending your response time for good cause shown.

JUL 131989 lbt&

Dated LT. L. Axelson/:@rtsf Reactor Projects Branch 2 L

j I

1 8907190372 890713 DR ADOCK 0500 2

-