' NOTICE OF' VIOLA 110N
+
4 3
f'
-Northern States Power Company Docket Nos. 50-282, 50-306 l
u
' s ' a'resul t sof-the inspection conducted on February 28 -through April 7,1990 A
t and in_accordance with the " General Policy and' Procedures for NRC Enforcement.
Actions," 10 CFR Part 2, Appendix _ C (1988), the following violation was
- 1dentifiedi
+
Technical Specification 3.6.E.2 states, in part, that openings in the
-i
' Auxiliary Building Special Ventilation Zone (ABSVZ) are permitted provided j
m L
- they are-under direct'administra*.ive control and can be reduced to less.than_
i ten square feet.within six minutes following an acciden.
The administrative control specified by Operations Procedure D54,LControl of-Openings'in'the ABSVZ-Boundary, Revision 4, requires that a log shall'be'kept-j in the control' room which specifies the size and location of all openings in x
the ABSVZ, including the time and date that openings are made and when they are closed.-
Contrary to the above between the dates of January 17, 1990, and February 15, l
1990, the installation and removal of the eddy current cable connection 1 flange created an. opening in the. ABSVZ which was not administrative 1y controlled in 1
-that_-theLopening was not logged to indicate the size, location, time and date lthat thecopening was made_or closed.
[
'LT This-is a Severity Level IV Violation (Supplement 1).
3 Pursuant to the provisions-of10 CFR 2.201,-you are required to submit to this ~
y Loffice within thirty days of the date of this Notice a written statement.of-explanation _in reply, including.for this. violation:
(1). corrective action taken and the results achieved;. (2) corrective' action to be taken to avoid further violations;:and (3) the date when full compliance will-be~ achieved.
Consideration may be given to extending your response time for_ good cause
'shown.
w APR 2 01%0 A
Rb s
Dated
% Brent Clayton # fsf '
M 0 Reactor Projects Branch 2 y
F i
f'
\\