MONTHYEARML20217N4611999-10-22022 October 1999 Forwards Revised Pages 11,14 & 71 of Rept & Order Dtd 990608.Revs Are Textual Changes to Clarify & Confirm Action Taken by Nuclear Decommissioning Financing Committee ML20216F5061999-09-16016 September 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petitions as of 990831.During August,Director'S Decision (DD-99-10) on Seabrook Issued & Petition Closed.Six Petitions Open,Five in NRR & One in Nmss.Attachment 2 Withheld ML20210K4141999-08-0404 August 1999 Forwards Signed Originals of DD Issued Under 10CFR2.206. Without Encl ML20210C1631999-07-19019 July 1999 Forwards Monthly Rept Which Gives Status of 10CFR2.206 Petitions as of 990630.Six Open NRR,1 OE & 2 NMSS Petitions Available.Attachment 2 Withheld ML20206U9631999-05-18018 May 1999 Notification of Significant Licensee Meeting 99-27 with Util on 990602 to Discuss Predecisional Enforcement Conference - NRC Investigation ML20206R1691999-05-0707 May 1999 Rev 1 to Notification of 990602 Significant Licensee Meeting with Listed Attendees in King of Prussia,Pa Re Predecisional Enforcement Conference Concerning NRC Investigation.Rev Sighted Date Change ML20207G5681999-03-0808 March 1999 Informs That Commission Memorandum & Order (CLI-99-06), Issued on 990305,appointed TS Moore as Presiding Officer for Seabrook License Transfer Proceeding.With Certificate of Svc.Served on 990309 ML20197H1211998-12-0808 December 1998 Forwards Exam Rept with as Given Written Exam for Test Administered at Facility on 981019-23 ML20195C7641998-11-13013 November 1998 Forwards Pages That Were Faxed to J Peschel on 981113 in Preparation for Telcon That Will Be Scheduled Wk of 981116. Info in Attached Pages Based on Info Obtained from Licensee & Includes Specific Subjects to Be Discussed with Licensee ML20153E4211998-09-24024 September 1998 Informs That Ofc of Secretary Experienced Problems with Listed e-mail Address.Alternate Mailbox Has Been Created in Effort to Maintain Electronic Mailbox for Parties Filing by e-mail.With Certificate of Svc.Served on 980924 ML20153G0231998-09-24024 September 1998 Informs That Office of Secretary Experienced Problems with Dedicated e-mail Address.In Effort to Maintain Electronic Mailbox for Parties Filing by e-mail,alternate Mailbox Created.With Certificate of Svc.Served on 980924 ML20239A3361998-09-0404 September 1998 Forwards Request for Hearing & Submitted by RA Backus on Behalf of Seacoast Anti-Pollution League & New England Coalition on Nuclear Pollution Re Proposed License Amend for Seabrook Unit 1 ML20249A6691998-06-15015 June 1998 Forwards Request for Hearing, & Submitted by RA Backus on Behalf of Seacoast Anti-Pollution League. Petition Was Filed in Response to Notice of Proposed Determination by Staff ML20217M7161998-04-0303 April 1998 Notification of 980219 Meeting W/North Atlantic Energy Svc Corp in Rockville,Md to Discuss Great Power Corp Response to RAI Re Decommissioning Funding Assurance ML20216G5891998-03-0606 March 1998 Notification of Significant Licensee Meeting 98-25 W/Util on 980324 Predecisional Enforcement Conference to Discuss Apparent Violation in Insp Rept 50-443/97-08 (EA-98-073) ML20198S4161998-02-26026 February 1998 Submits Impact of New Decommissioning Funding Rule on Great Bay.Staff Intends to Propose Some Addl Mechanisms That Appear to Offer Assurance Equivalent to What Existing Mechanisms Provide ML20203B9021998-02-0909 February 1998 Notification of 980219 Meeting W/North Atlantic Energy Service Corp in North Bethesda,Md to Discuss Proposed License Amends to Support Current Operating Cycle & Plans for Conversion to Improved Standard TSs ML20199E8881998-01-23023 January 1998 Notification of 980204 Mgt Meeting W/North Atlantic Energy Svc Corp in Rockville,Maryland to Discuss SALP for Period Covering 960505-971206 as Documented in SALP Rept 50-443/97-99 ML20198N0191998-01-0909 January 1998 Forwards Draft Rept, ,to Docket for Seabrook Station,Unit 1.Draft Rept Provides Licensee Preliminary Root Cause Analysis for Leaks in Piping of B Train of RHR System.Leakage Reported by Licensee on 971205 ML20203D2971997-12-0909 December 1997 Notification of 971216 Meeting W/Utils in Rockville,Md to Discuss Decommissioning Funding Assurance ML20211E7301997-09-23023 September 1997 Notification of 971028 Meeting W/North Atlantic Energy Service Corp in Rockville,Md to Discuss Approach for Extending Surveillances to 24-month Intervals ML20217B0471997-09-11011 September 1997 Notification of 970924 Meeting W/Eastern Utility Associates & North Atlantic Energy Service Corp in Rockville,Md to Discuss Proposed Electric Generating Asset Divestiture Plan ML20141D8191997-06-26026 June 1997 Forward 970624 Memo from P Milano to C Hehl Re Response to TIA Concerning Vantage 5H ZIRLO Fuel Problems at Plant,To Be Placed on Docket 50-443 & Made Publicly Available ML20141C9921997-06-24024 June 1997 Responds to 970605 TIA Re VANTAGE-5H ZIRLO Fuel Problems at Seabrook.Staff Has Not Identified Any Restart Concerns Re Reloading of VANTAGE-5H ZIRLO Fuel Used During Cycle 5 & W/Fresh VANTAGE-5H ZIRLO Fuel for Cycle 6 at Plant ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20134H7931996-11-0606 November 1996 Partially Deleted Memo Re 950502 Meeting W/Northeast Utilities Re Listed Topics ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20129C0271996-10-11011 October 1996 Notification of 961030 Public Meeting of Nuclear Decommissioning Committee ML20129E2011996-09-25025 September 1996 Notification of 960930 Meeting W/Util in Rockville,Md to Discuss Status of Great Bay Power Corp as Electric Util ML20147J3281996-07-10010 July 1996 Discusses Staff Response to SRM M960612, Briefing on Part 100 Final Rule on Reactor Site Criteria. Staff Believes That Draft Final Rule Language May Be Misinterpreted as Implicity Overruling in Conflict W/Seabrook Decision ML20129D1831996-07-10010 July 1996 Informs of 960716 Visit W/B Patricelli,Cm Cleveland & Gw Davis of Northeast Utilities,Inc Re Introductions & Discussions of Millstone Point & Haddam Neck Issues ML20134B6681995-10-13013 October 1995 Forwards Briefing Package on Status of Listed Plant Units,As Background for Visit by Northeast Utils on 951018-19 ML20087B8531995-07-25025 July 1995 Forwards State of Nh Nuclear Decommissioning Finance Committee Third Supplemental Order Approving Revised Funding Schedule by North Atlantic Energy Svc Corp ML20134B5861995-06-0101 June 1995 Forwards Briefing Package on Status of Plants as Background for Util Visit on 950608 ML20134B5721995-04-26026 April 1995 Forwards Briefing Package on Status of Listed Plants,As Background for Visit by Util on 950502.Supporting Documentation Encl ML20078S9391994-12-23023 December 1994 Forwards State of Nh Nuclear Decommissioning Finance Committee (Ndfc) Ndfc 93-1, Brief of Nh Public Utilities Commission Staff NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20134B4931994-02-16016 February 1994 Forwards Updated Briefing Package for Visit by Util Officials W/Nrc Chairman,Commission,Edo,Director OI & Director Oe.Requests Replacement of Encls 1 & 2 in 940215 Package,Retaining Supporting Attachment 1 Documentation ML20059J8371994-01-0606 January 1994 Notification of Significant Licensee Meeting 94-05 W/Util Emergency Preparedness Mgt Working Group on 940210 ML20058L9281993-12-15015 December 1993 Notification of 931221 Meeting W/North Atlantic Energy Svc Corp,Yaec & Intl Tech Svcs,Inc in Rockville,Md to Discuss Application of YAEC-1856P Methodology to Plant ML20058C9681993-11-19019 November 1993 Notification of Significant Licensee Meeting 93-147 W/Util on 931208 Re SALP Mgt Meeting for Period of 920301-930828 ML20059J2321993-11-0505 November 1993 Forwards Safety Evaluation Accepting LAR 92-14,submitted Via for TS Changes to Allow Independent Fixed Incore Detector Sys at Facility to Be Used for Periodic in-core Power Distribution TS SRs ML20128K8601993-02-0202 February 1993 Notification of Significant Licensee Meeting 93-13 W/Util on 930210 to Discuss General Engineering Programs ML20126K1461993-01-0505 January 1993 Notification of 930106 Meeting W/Util in Rockville,Md to Discuss Transfer of Control of Interest of Eua Power in Plant ML20126J6211992-12-24024 December 1992 Forwards LER 88-009-01 Issued on 921113,discussing Increased Thrust Bearing Loading for RHR Pumps When Pumps Run at Reduced Flows.Concern Raised That Inservice Testing May Not Detect Problem Soon Enough to Avoid Failure ML20125B4461992-11-30030 November 1992 Notification of 921203 Licensee Meeting in King of Prussia, PA to Discuss Auxiliary Operator re-licensing Plans ML20128C2131992-11-16016 November 1992 Notification of Postponement of 921124 Meeting W/Util in King of Prussia,Pa to Discuss Process for Reissuing Reactor Operator Licenses Terminated After Auxiliary Operator Performance Review ML20128C0271992-11-13013 November 1992 Notification of Significant Licensee Meeting 92-168 W/Util on 921124 to Discuss Process for Reissuing RO Licenses That Have Been Terminated After an AO Performance Review ML20097B5821992-05-27027 May 1992 Recommends That Methodology Specified in Order 20,475 Be Revised to Require Util to Include in Base Rates,Amounts Required by Nuclear Decommission Financing Committee 17th Supplemental Order 1999-09-16
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217N4611999-10-22022 October 1999 Forwards Revised Pages 11,14 & 71 of Rept & Order Dtd 990608.Revs Are Textual Changes to Clarify & Confirm Action Taken by Nuclear Decommissioning Financing Committee ML20217J8951999-10-21021 October 1999 Staff Requirements Memo Re Affirmation Session on 991021, Rockville,Md (Open to Public Attendance) ML20216F5061999-09-16016 September 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petitions as of 990831.During August,Director'S Decision (DD-99-10) on Seabrook Issued & Petition Closed.Six Petitions Open,Five in NRR & One in Nmss.Attachment 2 Withheld ML20210K4141999-08-0404 August 1999 Forwards Signed Originals of DD Issued Under 10CFR2.206. Without Encl ML20210C1631999-07-19019 July 1999 Forwards Monthly Rept Which Gives Status of 10CFR2.206 Petitions as of 990630.Six Open NRR,1 OE & 2 NMSS Petitions Available.Attachment 2 Withheld ML20206U9631999-05-18018 May 1999 Notification of Significant Licensee Meeting 99-27 with Util on 990602 to Discuss Predecisional Enforcement Conference - NRC Investigation ML20206R1691999-05-0707 May 1999 Rev 1 to Notification of 990602 Significant Licensee Meeting with Listed Attendees in King of Prussia,Pa Re Predecisional Enforcement Conference Concerning NRC Investigation.Rev Sighted Date Change ML20207G5681999-03-0808 March 1999 Informs That Commission Memorandum & Order (CLI-99-06), Issued on 990305,appointed TS Moore as Presiding Officer for Seabrook License Transfer Proceeding.With Certificate of Svc.Served on 990309 ML20207F5021999-03-0505 March 1999 Staff Requirements Memo Re 990305 Affirmation Session, Rockville,Md (Open to Public Attendance).Commission Approved Memo & Order Which Granted Util Intervention Petition & Request for Hearing ML20197H1211998-12-0808 December 1998 Forwards Exam Rept with as Given Written Exam for Test Administered at Facility on 981019-23 ML20195C7641998-11-13013 November 1998 Forwards Pages That Were Faxed to J Peschel on 981113 in Preparation for Telcon That Will Be Scheduled Wk of 981116. Info in Attached Pages Based on Info Obtained from Licensee & Includes Specific Subjects to Be Discussed with Licensee ML20153G0231998-09-24024 September 1998 Informs That Office of Secretary Experienced Problems with Dedicated e-mail Address.In Effort to Maintain Electronic Mailbox for Parties Filing by e-mail,alternate Mailbox Created.With Certificate of Svc.Served on 980924 ML20153E4211998-09-24024 September 1998 Informs That Ofc of Secretary Experienced Problems with Listed e-mail Address.Alternate Mailbox Has Been Created in Effort to Maintain Electronic Mailbox for Parties Filing by e-mail.With Certificate of Svc.Served on 980924 ML20239A3361998-09-0404 September 1998 Forwards Request for Hearing & Submitted by RA Backus on Behalf of Seacoast Anti-Pollution League & New England Coalition on Nuclear Pollution Re Proposed License Amend for Seabrook Unit 1 ML20249A6691998-06-15015 June 1998 Forwards Request for Hearing, & Submitted by RA Backus on Behalf of Seacoast Anti-Pollution League. Petition Was Filed in Response to Notice of Proposed Determination by Staff ML20217M7161998-04-0303 April 1998 Notification of 980219 Meeting W/North Atlantic Energy Svc Corp in Rockville,Md to Discuss Great Power Corp Response to RAI Re Decommissioning Funding Assurance ML20216G5891998-03-0606 March 1998 Notification of Significant Licensee Meeting 98-25 W/Util on 980324 Predecisional Enforcement Conference to Discuss Apparent Violation in Insp Rept 50-443/97-08 (EA-98-073) ML20198S4161998-02-26026 February 1998 Submits Impact of New Decommissioning Funding Rule on Great Bay.Staff Intends to Propose Some Addl Mechanisms That Appear to Offer Assurance Equivalent to What Existing Mechanisms Provide ML20203B9021998-02-0909 February 1998 Notification of 980219 Meeting W/North Atlantic Energy Service Corp in North Bethesda,Md to Discuss Proposed License Amends to Support Current Operating Cycle & Plans for Conversion to Improved Standard TSs ML20199E8881998-01-23023 January 1998 Notification of 980204 Mgt Meeting W/North Atlantic Energy Svc Corp in Rockville,Maryland to Discuss SALP for Period Covering 960505-971206 as Documented in SALP Rept 50-443/97-99 ML20198N0191998-01-0909 January 1998 Forwards Draft Rept, ,to Docket for Seabrook Station,Unit 1.Draft Rept Provides Licensee Preliminary Root Cause Analysis for Leaks in Piping of B Train of RHR System.Leakage Reported by Licensee on 971205 ML20203D2971997-12-0909 December 1997 Notification of 971216 Meeting W/Utils in Rockville,Md to Discuss Decommissioning Funding Assurance ML20211E7301997-09-23023 September 1997 Notification of 971028 Meeting W/North Atlantic Energy Service Corp in Rockville,Md to Discuss Approach for Extending Surveillances to 24-month Intervals ML20217B0471997-09-11011 September 1997 Notification of 970924 Meeting W/Eastern Utility Associates & North Atlantic Energy Service Corp in Rockville,Md to Discuss Proposed Electric Generating Asset Divestiture Plan ML20141D8191997-06-26026 June 1997 Forward 970624 Memo from P Milano to C Hehl Re Response to TIA Concerning Vantage 5H ZIRLO Fuel Problems at Plant,To Be Placed on Docket 50-443 & Made Publicly Available ML20141C9921997-06-24024 June 1997 Responds to 970605 TIA Re VANTAGE-5H ZIRLO Fuel Problems at Seabrook.Staff Has Not Identified Any Restart Concerns Re Reloading of VANTAGE-5H ZIRLO Fuel Used During Cycle 5 & W/Fresh VANTAGE-5H ZIRLO Fuel for Cycle 6 at Plant ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20134H7931996-11-0606 November 1996 Partially Deleted Memo Re 950502 Meeting W/Northeast Utilities Re Listed Topics ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20129C0271996-10-11011 October 1996 Notification of 961030 Public Meeting of Nuclear Decommissioning Committee ML20129E2011996-09-25025 September 1996 Notification of 960930 Meeting W/Util in Rockville,Md to Discuss Status of Great Bay Power Corp as Electric Util ML20147J3281996-07-10010 July 1996 Discusses Staff Response to SRM M960612, Briefing on Part 100 Final Rule on Reactor Site Criteria. Staff Believes That Draft Final Rule Language May Be Misinterpreted as Implicity Overruling in Conflict W/Seabrook Decision ML20129D1831996-07-10010 July 1996 Informs of 960716 Visit W/B Patricelli,Cm Cleveland & Gw Davis of Northeast Utilities,Inc Re Introductions & Discussions of Millstone Point & Haddam Neck Issues ML20134B6681995-10-13013 October 1995 Forwards Briefing Package on Status of Listed Plant Units,As Background for Visit by Northeast Utils on 951018-19 ML20087B8531995-07-25025 July 1995 Forwards State of Nh Nuclear Decommissioning Finance Committee Third Supplemental Order Approving Revised Funding Schedule by North Atlantic Energy Svc Corp ML20134B5861995-06-0101 June 1995 Forwards Briefing Package on Status of Plants as Background for Util Visit on 950608 ML20134B5721995-04-26026 April 1995 Forwards Briefing Package on Status of Listed Plants,As Background for Visit by Util on 950502.Supporting Documentation Encl ML20078S9391994-12-23023 December 1994 Forwards State of Nh Nuclear Decommissioning Finance Committee (Ndfc) Ndfc 93-1, Brief of Nh Public Utilities Commission Staff NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20134B4931994-02-16016 February 1994 Forwards Updated Briefing Package for Visit by Util Officials W/Nrc Chairman,Commission,Edo,Director OI & Director Oe.Requests Replacement of Encls 1 & 2 in 940215 Package,Retaining Supporting Attachment 1 Documentation ML20059J8371994-01-0606 January 1994 Notification of Significant Licensee Meeting 94-05 W/Util Emergency Preparedness Mgt Working Group on 940210 ML20058L9281993-12-15015 December 1993 Notification of 931221 Meeting W/North Atlantic Energy Svc Corp,Yaec & Intl Tech Svcs,Inc in Rockville,Md to Discuss Application of YAEC-1856P Methodology to Plant ML20058C9681993-11-19019 November 1993 Notification of Significant Licensee Meeting 93-147 W/Util on 931208 Re SALP Mgt Meeting for Period of 920301-930828 ML20059J2321993-11-0505 November 1993 Forwards Safety Evaluation Accepting LAR 92-14,submitted Via for TS Changes to Allow Independent Fixed Incore Detector Sys at Facility to Be Used for Periodic in-core Power Distribution TS SRs ML20128K8601993-02-0202 February 1993 Notification of Significant Licensee Meeting 93-13 W/Util on 930210 to Discuss General Engineering Programs ML20126K1461993-01-0505 January 1993 Notification of 930106 Meeting W/Util in Rockville,Md to Discuss Transfer of Control of Interest of Eua Power in Plant ML20126J6211992-12-24024 December 1992 Forwards LER 88-009-01 Issued on 921113,discussing Increased Thrust Bearing Loading for RHR Pumps When Pumps Run at Reduced Flows.Concern Raised That Inservice Testing May Not Detect Problem Soon Enough to Avoid Failure ML20125B4461992-11-30030 November 1992 Notification of 921203 Licensee Meeting in King of Prussia, PA to Discuss Auxiliary Operator re-licensing Plans ML20128C2131992-11-16016 November 1992 Notification of Postponement of 921124 Meeting W/Util in King of Prussia,Pa to Discuss Process for Reissuing Reactor Operator Licenses Terminated After Auxiliary Operator Performance Review 1999-09-16
[Table view] |
Text
. - _ _ _ _ _ _ _ - _ _
11 JUL 586 MEMORANDUM FOR: Richard E. Cunningham, Director Division of Fuel Cycle and Material Safety, NMSS j FROM: Thomas M. Novak, Acting Director !
Division of PWR Licensing-A g-Q
SUBJECT:
SEABROOK STATION UNIT 1 OPERATING LICENSE STATUS l
A copy of the proposed license for Seabrook Station, Unit I without attachments is provided in Enclosure 1. The proposed license has been l l:
modified to reflect all coments received from the staff to date. A draft of Attachment I to the license has been requested from Region I.
All proposed license conditions, and revisions to this license (with supporting SSER inputs) along with your concurrence are needed prior to lj issuance of the license expected on about July 10, 1986. Please provide this information no later than July 8( 1986.
)
Original signed by7 Thocas M. Novak -
^
Thomas M. Novak, Acting Director Division of PWR Licensing-A
Enclosures:
As stated j Distribution:
Docket Files PD#5 Reading File EDoolittle ;
MRushbrook '
l l
P DIR:PD#5 A E tle VSNoonan TMNovak
}/pB6es / /86 / /86 l 1
'% .l Y6(nu o230 g
1 g
f*=ogjo l g UNITED STATES (
j' , ' p, NUCLEAR REGULATORY COMMISSION
{
- E W ASHINGT ON, D. C. 20655 c
,,,,./ 11 MR, %
MEMORANDUM FOR: Richard E. Cunningham, Director Division of 1 Fuel Cycle and Material Safety, NMSS l FROM: Thomas M. Novak, Acting Director i Division of PWR Licensing-A l
SUBJECT:
SEABROOK STATION UNIT 1 OPERATING LICENSE STATUS ;
l 1 A copy of the proposed license for Seabrook Station, Unit I without i attachments is provided in Enclosure 1. The proposed license has been modified to reflect all coments received from the staff to date. A draft of -
Attachment I to the license has been requested from Region I. 4 l All proposed license conditions, and revisions to this license (with supporting SSER inputs) along with your concurrence are needed prior to issuance of the license expected on about July 10, 1986. Please provide this !
information no later than July 8, 1986.
]
i 2% ;
Thomas M. Novak, Acting Director i Division of PWR Licensing-A l
Enclosures:
As stated l l
l i
f W
ENCLOSURE I
/ap usgjog UNITED STATES
! % ,., g NUCLEAR REGULATORY COMMISSION g :; W ASHINGTON, D. C. 20656 A.....' DRAFT PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE, ET At.*
DOCKET NO. 50-443 SEABROOK STATION, UNIT NO. 1 FACILITY OPERATING LICENSE l.icense No. NPF-56
(
- 1. The Nuclear Regulatory Comission (the Commission) has found that: .
A. The application for license filed by Public Service Company of New Hampshire, as agent and representative of 12 utilities listed below and hereafter referred to as licensees, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I, and all required notifications to o_ther agencies or bodies have been duly made;
- 8. Construction of the Seabrook Station, Unit No.1 (the facilityl has been substantially completed in conformity with Construction Permit No. CPPR-135 and the application, as amended, the provisions of the Act, and the regulations of the Commission; E
C. The facility will operate in confomity with the application, as amended, the provisions of the Act, and the regulations of the Commission, (except as exempted from compliance in Section 2.D below);
D. There is reasonable assurance: (i) that the activities authorized by this operating license can be conducted without endangering the health and safety of the public, and (iil that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I, (except as exempted from compliance in Section 2D below):
- Public Service Company of New Fampshire is authorized to act as agent for the: Canal Electric Company, Central Maine Power Company, Central Vermont Public Service Corporation, Connecticut I.ight and Power Company, Fitchburg Gas & l.ight Company, Bangor Fydro-Electric Company, Hudson I.ight & Power Company, Maine Public Service Corporation, Massachusetts Municipal Wholesale riectrJc.Lompany,JontaupJ4Mdc. Company,.SewhM fP werhpaDy..!W d-**" famps.. . , s . m wvm Ptve r4ne:Mubl R Mice %...; J L byAire, #-
Taunton Municipal L.ighting Plant, the United Illuminating Company, and Vermont Electric Generation and Transm!ssion Cooperative, Inc., and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.
DRAFT :
E. Public Service Company of New Hampshire is technically qualified to engage in the activities authorized by this license in accordance with 4 the Comission's regulations set forth in 10 CFR Chapter I; F. The licensees have satisfied the applicable provisions of 10 CFR Part 140 " Financial Protection Requirements and Indemnity Agreements" of the Commission's regulations; G. The issuance of this license will not be inimical to the coninon de-fense and security or to the health and safety of the public; F. After weighing the environmental, economic, technical and other bene-fits of the facility against environmental and other costs and '
considering available alternatives, the issuance of Facility Operating I.icense No. NPF-56, subject to the conditions for protection of the environment set forth in the Environmental Protection Plan attached as Appendix B, is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicabic requirements have been satisfied; and I. The receipt, possession, and use of source, byproduct and special l nuclear material as authorized by this license will be in accordance I with the Comission's regulations in 10 CFR Parts 30, 40 and 70.
- 2. Based on the foregoing findings regarding this facility, Facility Operating l t.icense No. NPF-56 is hereby issued to Public Service Company of New :
Fampshire et al. (the licensees) to read as follows: j A. This license applies to the Seabrook Station, Unit 1, a pressurized water nuclear reactor and associated equipment (the facility), owned by the licensees. The facility is located in Seabrook Township, Rockingham County, New Fampshire on the southeastern coast of the State of New Fampshire and is described in the licensees' " Final Safety Analysis Report", as supplemented and amended, and in the licensees' Environmental Report, as supplemented and amended.
B. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses; (1) Public Service Company of New Fampshire (PSNH) pursuant to Section 103 of the Act and 10 CFR Part 50, to possess, use and operate the facility at the designated location in Rockingham County, New Fampshire in accordance with the procedures and limitations set forth in this license; (2) The licensees, to possess the facility at the designated wo4an in Rocki.nghe= r~=+y. Mempshite irLaccordance.with--
=
s eW4 /. ras CiZEdeesed limitetten*Tet' forttMn' thts-iteentTT*'
(3) PSNF, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended;
MMT l
(4) PSNH, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to re-ceive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) PSNH, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to re-ceive, possess, and use in" amounts as reovired any byproduct, source or special nuclear material without restriction to chemical or physical fortn, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and .
(6) PSNP, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to pos-sess, but not separate, such byproduct and special nuclear materials as may be produced by the operations of the facility.
C.. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations, set forth in 10 CFR Chapter I
~
and is subject to all applicable provisions of the Act and to the rules, i regulations, and orders of the Commission now or hereafter in effect; and I is subject to the additional conditions specified or incorporated below:
(11 Maximum Power level Public Service Company of tew Hampshire is authorized to operate the facility at reactor core power levels not in excess of 3411 megawatts thermal (100% rated power) in accordance with the conditions specified herein. Pending Comission approval, this ;
license is restricted to power levels not to exceed 5 percent of rated power (170 megawatts thermal). The items identified in Attachment 1 to this license shall be completed as specified.
Attachment 1 is hereby incorporated into this license.
(2) Technical Specification and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix 8, both of which are attached hereto, are hereby incorporated into this license. Public Service Company of New Hampshire shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
.. J a s . ... a .. .,a -e < .. .. d.i
DRAFT (3) Inservice Inspection Program (Section 5.2.4, 6.6.1, SER, 55ER 3, 55ER 4 55ER 5)*
PSNH shall submit the inservice inspection program which conforms to the ASME code in effect 12 months prior to the date of this license, in accordance with 50.55a(g)(4), for NRC staff review and approval within six months from the date of this license.
(4) Fire Protection (Section 9.5.1, SER, SSER 4 and SSER 5)
PSNH shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report, the Fire Protection Program report, and the Fire Protection of Safe Shutdown Capability report for the facility, as supplemented and amended, and as approved in the Safety Evaluation Report, dated March 1983 and Supplement 4, dated May 1986 and Supplement 5 dated June 1986, subject to the following provision:
PSNH may make changes to the approved fire protection program without prior approval of the Comission, only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
(5) Operating Staff Experience Requirements _(Section 13.1.2.2, SSER 11 Seabrook shall have a licensed senior operator on each shift who has had at'least 6 months of hot operating experience on a same type plant, including at least 6 weeks at power levels greater than 20 percent of full power, and who has had start-up and shutdown experience.
(6) Emergency preparedness (Section 13.3, SER, SSER 4)
In the event that the NRC finds that the lack of progress in completion of the procedures in the Federal Emergency Agency's final rule, 44 CFR Part 350, is an indication that a major substantive problem exists in achieving or maintaining an adequate state of emer CFR Section 50.54 (s)(gency preparedness, the provisions of 10
- 2) will apply.
(7) Initial Test Program (Section 14, SER) l Any changes to the Initial Test Program described in Section 14 of the FSAR made in accordance with the provisions of 10 CFR cn (04heU B ze r i^d '
E FM A 4 1nonth-ef $6th" change. #r MMdace* " ~ * 'wi.th
"
' * ~ * ' *
- The parenthetical notation following the title of many license conditions de-notes the section of the Safety Evaluation Report and/Or its supplements wherein the license condition is discussed.
MAFT 1
(8) Salem ATWSEvent, Generic l.etter 83-28 (Section 15.8, SEp.
55ER 5 PSNH shall submit response to and implement the requirements of f I
Generic letter 83-28 on a schedule which is consistent with I that given it its letter dated .
(9) Safety Parameter Display System (Section 18, SER, SSER 4, SSER 5)
Prior to restart following the first refueling outage, PSNP shall have operational a Safety parameter Display System (SPDS) as described in PSNP's submittals dated January 6,1986 and April 2,1986, that shall include the following modifications:
- 1. Crantinuous display of the top level critical safety function summary at the assigned SPDS control room location.
- 2. Addition of, or satisfactory justification for, not adding i RPR flow and hydrogen concentration parameters to l appropriate SPDS screens,
- 3. Addition of a containment isolation status screen on SPDS, or improvement to the current containment isolation display to be satisfactorily recognizable froe the assigned SPDS location in the control room.
4
- 4. Addition of a radiation monitoring screen to display at l least steam generator (or steam line) and stack radiation,
- 5. Improvement of the Heat Sink screen for consistency in labelino, and the Subcriticality screen for mode dependency so as not to mislead operators, and
- 6. Addition of approved isolation devices between the Reactor Vessel level Instrumentation System (N.IS) and SPOS.
1' PSNP is exempted from the Section III.D.2(b)(ii) containment airlock D.
testing requirements of Appendix J to 10 CFR Part 50, due to the )
special circumstance described in Section 6.2.6 of SER Supplement 5 authorized by 10 CFR 50.12(a)(2)(iii). This exemption is authorized by law, will not present an undue risk to the public health and safety and is consistent with the common defense and security. The l exemption is hereby granted pursuant to 10 CFR 50.12. With the granting of this exemption, the facility will operate, to the extent v.w a ,a u . <.
(
M EM e ., ~. r-t >y_,g,tggy ;7 2 yn, u ,penggg, ,
u
- E ~ Mhe provisionsWe*Actl and~the rblet"and N1)tT1ations of thii' "'"_ ~
Commission.
a 4
DRAR :
In addition; an exemption was previously granted pursuant to 10 CFR 50.12. A. partial exemptien from those portions of General Design Criteria 4 of Appendix A to 10 CFR Part LO which require protection i of structures, systems and components important to safety against dynamic effects associated with postulated reactor coolant system pipe breaks was granted on November 22, 1985, for a period ending with the completion of the second refueling outage for Seabrook Station, Ur.it 1 or the adoption of the proposed rulemaking for modification of GDC-4 whichever occurs first. Effective May 12, 1986, GDC-4 has been modified to exclude from the design basis the protection of structures, systems and components against dynamic effects associated with postulated pipe ruptures of primary coolant loop piping in PWRs when analyses demonstrate the probability of .
rupture of such piping to be extremely low under design basis conditions (51 FR 12502 April 11,1986).
E. Public Service Company of New Fampshire shall fully implement and maintain in effect all provisions of the physical security, guard trsining and qualifica :on, and safeguards contingency plans, previously approved '- the Comission and,,all amendments and revisions r.ade put a. to the authority of 10 CFR 50.90 and 10 CFR The plans, which .ain Safeguards Information protected under 10 CFR 73.21, are er.. .tled: "Seabrook Station Physical Security Plan",
with revisions submitted through March 21,1986, "Seabrook Station Security Training and Qualification Plans", with revisions submitted through August 31, 1982, and "Seabrook Station Safeguards Contingency Plan", with revisions submitted through November 30, 1981.
F. Except as otherwise provided in the Technical Specification or Environ-mental Protection Plan, Public Service Company of New Hampshire shall report any violations of the requirements contained in Section 2.C of this license in the following manner: initial notification shall be made within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the NRC Operations Center via the Emergency Notification System with written followup within thirty days in accordance with the procedures described in 10 CFR 50.73(b), (c) .
and (e).
G. The licensees shall have and maintain financial protection of such type l and in such arrounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
- 2 .
- , - c. . m a ~~"~~~~7.*T .- : 5. ~,.. .
~
.r M : . .O -~.
+,
a
y ENCLOSURE 2 DRAFI l
- 1. Radiation Data Management System - Qualified non-fuse dependent isolation devices be installed and operational (SSER5-7.5.2.21.
~
- 2. Fire Protection - Applicant must provide an analysis which justifies the lack of any fire suppression system for the charcoal adsorbers (SSER 5
-9. 5.1. 4 ) ,
i 3. Solid Waste Management System - Applicant shall submit an acceptable description of the spill control methods of the cement solidification system (SSEE 5- 11.4.... -
- 4. TMI Action Flan Item II.F.1, Accident Monitoring Instrumentation -
Demonstrate that the iodine / particulate sampling system is operable and will perfors its intended function (SSER 5-11.5.2).
- 5. le'akage Reduction Measurement Program - The applicant shall submit the
, result of leak note measurements sufficient to show that its leakage reduction program has been successfully implemented (SSER 5 - 15.9.15).
l e- -w- e = - --
. A . , ., . . . .. s . 4 .. .
l l
J