ML20244D239
Text
_ _ - _ - _ _ _ _ _ _ - - _ _
'\\
Docket Nos:
50 443 DISTRIBUTION 50 444 FEB 2 21985 CENTRAL FILES RAB READING FILE MEMORANDUM FOR: Thomas M. Novak, Assistant Director AD:RP FILE for Licensing, DL FJCONGEL MLAMASTRA FROM:
Daniel R. Muller, Assistant Director OLYNCH for Radiation Protection, DSI
SUBJECT:
SEABROOK STATION - UNITS 1 AND 2 ALTERNATIVE PIPE BREAK DESIGN CONSIDERATIONS - REQUEST FOR AN EXEMPTION.T0 GDC-4 The Radiological Assessment Branch has reviewed the submittal of Seabrook Station Unit 1 and 2 with respect to their alternative pipe break design considerations. Our review considered the effects of the prcposed GDC-4 exemption on occupational exposure.
It is our conclusion, with'the respect to occupational exposure, that there is a significant benefit in notaddinh the additional protective structures, and RAB has no objections to granting Seabrook an exemption. Attached are our SER and SALP inputs."
l This review was performed by M.Lamastra, RPS/RAB.
C:.a1 sincd by W!NC.M_Y_le(j Daniel R. Muller, Assistant Director for Radiation Protection Division of Systems Integration
Attachment:
As stated cc:
R. Bernero G. Knighton V. Nerses l
r
/
IFC :DSI:RAB
- DSI:RA
- DSI:RAB Q SI:AD:RP AME :MLamas ra:cm:0
- FJCongel ' J :DR p r LATE :2/19/85
- 2/M /85
- 2/tt/85
- 2/ "/85 0FFICIAL RECORD COPY Y $d118%) M
^
urs