4 Docket No.:
50-443 MEMORANDUM FOR:
Victor Nerses, Project Manager PWR Project Directorate #5 Division of PWR Licensing-A FROM:
Charles E. Rossi, Assistant Director Division of PWR Licensing-A
SUBJECT:
SEABROOK STATION SSER INPUT ON INSERVICE TESTING OF PUMPS AND VALVES Plant Name: Seabrook, Unit 1 Docket No.: 50-443 Licensing Stage: OL Responsible Branch: PWR Project Directorate #5 Responsible Project Manager:
V. Nerses Review Status: Complete, prepared by Norman Romney of the Engineering Branch, is the Seabrook Station Supplemental Safety Evaluation Report Input on Inservice Testing of Pumps and Valves. is the technical evaluation report " Pump and Valve Inservice Testing Program Seabrook Station 1" prepared by the Idaho National Engineering Laboratory. Enclosure 2 is included as an appendix to the SSER.
]
The SSER concludes that the applicant's Inservice Testing Program is acceptable and meets the requirements of 10 CFR 50.55a(g).
It should be noted that Seabrook Station is the first plant to have an IST program fully approved by the staff prior to licensing.
The SALP input was provided with a prior issue of this SER.
_Orician :Oud by, Charles E. Rossi, Assistant Director Division of PWR Licensing-A
Enclosure:
As stated cc:
V. Noonan Distribution:
i R. Ballard Docket Files L. Magleby, INEL PAEB Reading Files G. Bagchi PAEB Plant Files D. Jeng N. Romney See Previous Concurrence Sheet *
Contact:
N. Romney C
X-247
{i m
8 BOD O M'/ / A gr7
~-
UTC'""~:PAEB *
- PAEB *
- PAEB *
- PAEB *
- AD:DP A NAME :NRomney:vt ' :GBagchi
- DJeng
- RLBallard
- ERo
_.................:............:g.____....:...._.....:.........__:._____......:...........
I
\\
cket No.:
50-443 MEMO NDUM FOR: Victor Nerses, Project Manager PWR Project Directorate #5 Division of PWR Licensing-A FROM:
Charles E. Rossi, Assistant Director Division of PWR Licensing-A
SUBJECT:
EABR00K STATION SSER INPUT ON INSERVICE TESTING l
PUMPS AND VALVES j
l Plant Name:
Seabrook, Unit 1 I
Docket No.:
50-443 I
Licensing Stage: OL Responsible Branch:
PWR P ject Directorate #5 Responsible Project Manager:
V. Nerses Review Status: Complete, prepared by Norman ney of the Engineering Branch, is the Seabrook Station Supplemental Safe Evaluation Report Input on Inservice Testing of Pumps and Valves.
Enclos e 2 is the technical evaluation I
report " Pump and Valve Inservice Testi Program Seabrook Station 1" prepared by the Idaho National Engineer g Laboratory. Enclosure 2 is included as an appendix to the SSER.
I The SER concludes that the applicant's Inser 'ce Testing) Program is acceptable and meets the requirements of 10 C 50.55a(g.
It should be noted that Seabrook Station is the first plant have an IST program fully approved by the staff prior to licensing.
The SALP input was provided with a prior issue of th SER.
Charles E. Rossi, Assista Director Division of PWR Licensing-A
Enclosure:
As stated cc:
V. Noonan Distribution:
R. Ballard Docket Files L. Magleby, INEL PAEB Reading Files G. Bagchi PAEB Plant Files D. Jeng N. Romney
Contact:
N, Romney X-24709 h
r b A pWP ? j' :AD:DPLA
')FC :PAE y, / :PA 5
- PAE
- - : - - - /--- - - : -- - -
---.------- a---:------------:------------:-----------
m---
TAME :NRomney:vt
. Bagchi
- DJeng
- RLBallard
- CERossi 0----
- -- - -- - : q-g- --,-- : ---- -- - - - -- - : g, g
3.9.6 Inservice Testing of Pumps and Valves j
l The applicant for Seabrook Station submitted an inservice testing (IST) l program by letter dated December 31, 1985.
This submittal was reviewed by i
the staff and was the subject of a working meeting with the applicant on May 13 and 14,1986. Based on staff comments during the working meeting the applicant submitted Revision 1 to their IST program by letter dated June 4, 1986. Revision 1 was amended by letter from J. DeVincentis to V. S. Noonan dated June 18, 1986 and letters from G. S. Thomas to V.S.
Noonan dated June 23, 1986 and June 25, 1986. Revision I dated June 4, 1986 as amended by letters dated June 18, 23 and 25,1986 constitute the Seabrook IST program that has been reviewed by the staff.
The applicant's IST program is required by 10 CFR 50.55a(g) to comply with the ASME Boiler and Pressure Vessel Code,Section XI,1983 Edition through Summer 1983 Addenda. Pursuant to 10 CFR 50.55a (g)(5) the applicant for
}
Seabrook has requested relief from the ASME Code Testing requirements for specific pumps and valves where the Code requirements are impractical within the limits of design, geometry, and accessibility.
Each of the applicant's request for relief included an explanation and justification for the relief and a proposal for alternative t'est procedures.
The staff, with technical assistance from the Idaho National Laboratory (INEL), has reviewed the applicant's IST program and relief requests. A technical Evaluation Report (TER) prepared by INEL is included as an Appendix to this SER Supplement.
Based on this review the staff concludes that the applicant's IST program meets the requirements of 10 CFR 50.55a(g) and is therefore acceptable.
In addition, for each relief request the applicant's alternative IST procedure, basis for requesting relief, the staff evaluction of the request and staff conclusion are fully discussed in the Aprendix to this SER supplement. Based on review of the i
1 7
applicants request for relief, the staff concludes that the requirements of 10 CFR 50.55a(6)(1) are met and are therefore acceptable. Granting the relief requested by the applicant will not endanger life or property or the j
comon defense and is'otherwise in the public interest giving due 4
consideration to the burden on the applicant if the request were not granted.
1 l
i i
.