Category:REPORTABLE OCCURRENCE REPORT (SEE ALSO AO LER)
MONTHYEARML20236U5011998-07-23023 July 1998 Special Rept:On 980624,Unit 1 Site Damaged by Tornado & High Winds.Alert Declared by DBNPS Staff,Dbnps Emergency Response Facilities Activiated & Special Insp Team Deployed to Site by Nrc,As Result of Event ML20115J1121996-07-17017 July 1996 Voluntary Report:On 960430,two Unplanned Starts of Emergency Diesel Generator (EDG) 1-2 Occurred.Caused by Failure to Perform Procedural Step to Verify Power Supply to Electrical Busses D1 & D2.Personnel Counseled ML20071K6881994-07-27027 July 1994 Special Rept:On 940519,pilot Operated Relief Valve Opened for Approx 5 Seconds During Functional Testing of Replacement Reactor Trip Module in Reactor Protection Sys ML20118B9951992-10-0202 October 1992 Ro:On 920910,discovered That non-TS Hourly Fire Watch, Completed on 920908,improperly Performed,Per Suppl 1 to NRC Bulletin 92-001,resulting in Falsification of Fire Watch Log.Individual Disciplined & Addl Training Provided ML20096H0261992-05-19019 May 1992 Special Rept:On 911206,twelve Smoke Detectors in Fire Detection Zone Were Inoperable.Cause Unknown.Detectors Replaced W/Pyrotronics Model DI-6 ML20094L0651992-03-19019 March 1992 Special Rept:On 920204,local Fire Detector Alarm Panel for Fire Detection Zone Was in Trouble Indication Condition. Cause Not Determined.Hourly Fire Watch Patrol Established to Monitor Alarm ML20086K3891991-12-0606 December 1991 Supplement to 910925 Special Rept:On 910830,four Addl Alison Controls,Inc Detectors in Fire Detection Zone RCP-1,RCP-3, RZP-4 & Fdz A208 Failed.Caused by Dust Particles in Sensing Chamber.Subj Detectors Replaced W/Pyrotronics Model DI-6 ML20079F6301991-09-25025 September 1991 Special Rept:On 910818 & 0905,Fire Detection Zone A208 & Instruments Declared Inoperable When Subj Zone Panel Went Into Alarm W/No Indications of Fire.Detector Shipped to Vendor for Troubleshooting & Repair ML20073Q7671991-05-29029 May 1991 Special Rept:On 910415,ionization Type Fire Detector in Fire Detection Zone 235 (Boric Acid Evaporator Room 1-1) Inoperable.Ts 3/4.3.3.8 Entered & Hourly Fire Watch Patrol Established within 1 H ML20072U8091991-01-10010 January 1991 Special Rept:On 910304,electric Fire Pump Removed from Svc for Planned Outage for More than Seven Days.Pump Removed to Replace Existing Controller.Replacement of Controller Accomplished & Electric Fire Pump Returned to Svc ML20058M8561990-08-0606 August 1990 Ro:On 900609 & 11,station Experienced Series of Events Which Lead to Opening of Control Rod Drive Trip Breakers.Caused by Fuse Failure & Mispositioned Control Mode Selector Switch, Respectively.Test Procedure Being Modified ML20246K8931989-07-14014 July 1989 Ro:On 890314,discovered Error in Scheduling & Actual Performance of Surveillance Requirement 4.6.1.3 Re Testing for Personnel & Emergency Air Locks.Caused by Oversight. App J Exemption Request Submitted & Test Interval Changed ML20154C5271988-08-31031 August 1988 Special Rept:On 880722,Tech Spec 3.3.3.3 Violated.Caused by Accelerometers Being Inoperable for More than 30 Days.Mod 88-0060 to Replace Accelerometers Scheduled for Completion by 880915 ML20154M6751988-05-26026 May 1988 Special Rept:On 880419,diesel Fire Pump Removed from Svc for Maint & Declared Inoperable for Longer than Limit Required by Tech Spec Due to Unanticipated Temp Switch Failure.Switch Repaired & Diesel Fire Pump Declared Operable ML20236L4361987-11-0606 November 1987 Special Rept:On 870718,fire Detection Zone FDZ-A208 Declared Inoperable.Caused by Failure of Fire Detector.Hourly Fire Watch Established.Main Work Order Initiated to Repair Detector ML20236S8411987-06-12012 June 1987 Special Rept:On 870513,fire Protection Coordinator Discovered Damage to Fire Barrier Wall in Entrance to Radiation Access Control Area.Probably Caused by Personnel Negligence.Repairs to Wall Should Be Completed by 870731 ML20235B7741987-01-21021 January 1987 RO 07352:on 870121,reactor Tripped from 40% Power.Cause Not Yet Known & All Sys Functioned as Regulated for Reactor Trip ML20076J7391983-06-27027 June 1983 Ro:On 830616,hatches Associated W/Negative Pressure Boundary & Fire Barrier Removed.Notification Satisfies 30-day Requirement.Written Rept Will Be Submitted by 830713 ML20054E1931981-10-16016 October 1981 Telecopy RO Re Max String Error of Pressure/Temp Bistable of Reactor Protection Sys Exceeding Allowable Values of Tech Spec 2.2.1,Table 2.2-1.Event Reported on 811016.Facility Change Request Implemented 1998-07-23
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K1231999-10-14014 October 1999 Revised Positions for DBNPS & Pnpp QA Program ML20217D5441999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Davis-Besse Nuclear Power Station.With ML20211R0811999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20211B0271999-08-13013 August 1999 SER Accepting Second 10-year Interval Inservice Insp Requests for Relief RR-A16,RR-A17 & RR-B9 for Plant, Unit 1 ML20210Q8541999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20209E6231999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20195K2871999-06-16016 June 1999 Safety Evaluation Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20195F4871999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20207E8011999-05-19019 May 1999 Non-proprietary Rev 2 to HI-981933, Design & Licensing Rept DBNPS Unit 1 Cask Pit Rack Installation Project ML20207F4351999-05-0404 May 1999 Rev 1 to DBNPS Emergency Preparedness Evaluated Exercise Manual 990504 ML20206M6341999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Davis-Besse Nuclear Station,Unit 1.With ML20205M2931999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Davis-Besse Nuclear Power Station.With ML20207J1461999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20199H5931999-01-20020 January 1999 Safety Evaluation Accepting Thermo-Lag Re Ampacity Derating Issues for Plant ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199E2501998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20206B0101998-12-31031 December 1998 1998 Annual Rept for Firstenergy Corp, for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station.Form 10-K Annual Rept to Us Securities & Exchange Commission for Fiscal Yr Ending 981231,encl ML20205K5781998-12-31031 December 1998 Waterhammer Phenomena in Containment Air Cooler Swss ML20197J3441998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20195D0001998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20155B6781998-10-28028 October 1998 Safety Evaluation Accepting Proposed Reduction in Commitment Changes in QA Program Matl Receipt Insp Process ML20154H5801998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20151W1611998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Dbnps.With ML20237E3171998-08-21021 August 1998 ISI Summary Rept of Eleventh Refueling Outage Activities for Davis-Besse Nuclear Power Station ML20237B1681998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20236U5011998-07-23023 July 1998 Special Rept:On 980624,Unit 1 Site Damaged by Tornado & High Winds.Alert Declared by DBNPS Staff,Dbnps Emergency Response Facilities Activiated & Special Insp Team Deployed to Site by Nrc,As Result of Event ML20236R1441998-07-15015 July 1998 SER Related to Quality Assurance Program Description Changes for Davis-Besse Nuclear Power Station,Unit 1 ML20236N7451998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20236K3981998-06-30030 June 1998 SER Accepting in Part & Denying in Part Relief Requests from Some of ASME Section XI Requirements as Endorsed by 10CFR50.55a for Containment Insp for Davis-Besse Nuclear Power Station,Unit 1 ML20236K5131998-06-29029 June 1998 Safety Evaluation Accepting Proposed Alternate Emergency Operations Facility Location for Davis-Besse Nuclear Power Station,Unit 1 ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML20249A4121998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20196B5221998-05-23023 May 1998 10CFR50.59 Summary Rept of Facility Changes,Tests & Experiments Dbnps,Unit 1 for 960602-980523 ML20236E7581998-05-19019 May 1998 Rev 0 to Davis-Besse Unit 1 Cycle 12 Colr ML20236N7501998-04-30030 April 1998 Rev 2 to Monthly Operating Rept for Apr 1998 for Davis-Besse Nuclear Power Station,Unit ML20247F6721998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Davis-Bess Nuclear Power Station,Unit 1 ML20249A4141998-04-30030 April 1998 Revised Monthly Operating Rept for Apr 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20217P8041998-04-0707 April 1998 11RFO OTSG ECT Insp Scope ML20216B4041998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20216C5131998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20202D3721998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20199G6321998-01-26026 January 1998 Rev 1 to Davis-Besse Unit 1,Cycle 11,COLR ML20198R4771998-01-13013 January 1998 SER Approving Second 10-year Interval Inservice Inspection Program Plan Requests for Relief for Davis-Besse Nuclear Power Station,Unit 1 ML20198K7931997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Davis-Besse Nuclear Power Station,Unit 1 ML20217K6401997-12-31031 December 1997 1997 Annual Rept First Energy ML20203A3931997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Davis-Besse Nuclear Power Plant,Unit 1 ML20198S5371997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Davis-Besse Nuclear Power Station ML20217H7701997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Davis-Besse Nuclear Power Station,Unit 1 ML20216H3261997-08-31031 August 1997 Monthly Operating Rept for August 1997 for DBNPS ML20217K0241997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Davis Besse Nuclear Power Station,Unit 1 1999-09-30
[Table view] |
Text
{{#Wiki_filter:-
n
^
xH yE J*-
9 ,
N ~
r 3.:. .
.a
- "+
l j-'dj i '
m i ,
l
'l
)'
t y
>v .
l 9
, e ,1 TOLEDO' - . .
Docket-No. 50-346: EDISON l '
t
' License:No. NPF-3: LogNo;KA87-0249j
- NP-40-87-01 'l Serial No. 1 766 1
. November.6, 1987' ,
d U. S.'NucleaE Regul't'ory a Commission.
y Document' Control Desk '
Vashington', D. C. 20555 I
Gentlemen j
Subject:
Special Report of: an Inoperable Fire Detection Zone Resulting from a Failed Detector in that Zone-1 On July'18, 1987 at 0700 hours, fire detection zone'FDZ-A208 was declared- )
inoperable. The required. fire watch hourly patrol:of-the zone ~ panel was immediately. established:in:accordance with Technical Specification'3.3.3.'8, action: statement "a". This fire' detection zone' monitors the 590 foot' elevation in the Shield Building annulus. . When:the FDZ-A208 alarm was' received,lthe:areaf j was surveyed, and no source of-fire or smoke'vas.found. JIt,vas determined that. ,1 one of the ten fire detectors (Allison, A1200 series ionization. detector) that lj
. make up FDZ-A208 had failed. With this detettor' inoperable'the zone; alarm ;
i remains in alarm. Once the zone alarm is actuated, alarms from additional- ;
detectors in that zone are received at the. local' zone panel but do not ;
re-actuate the zone alarm into the control room.- >
Maintenance'Vork Order (MVO) 1-87-2273-00. vas initiated on July'24,.1987fto. -
repair the failed detector. Due to the' detector's location in a high radiation i area, the HWO vill;be worked during an outage of sufficient duration-to permit-scaffolding erection without excessive worker exposure'(planned.for the 5th refueling outage, approximately February 1988). .The detector will be examined' at that time to investigate the cause of its failure. '
1 The hourly fire watch will continue until this detector / zone is returned to an operable status.
On Oc ober 7, 1987, the Fire Protection Group noted that-the' fire protection.
zone panel C-2720 had been in alarm since July 18, 1987 and the required'Special-Report had not'been submitted. Technical Specification 3.3.3.8 action! statement-
'"b" requires a Special Report within 30 days after the fire detection zone had been inoperable for 14 days, h
s K- 00 6
,x:f%w- /: .
THE TOLEDO EDISON COMPANY ' EDISON PLAZA 000 MADISON AVENUE ., TOLEDO, OHIO 43652) fj y 4
..____..m__ m.--.
~
4 JDocksti No. 50-346.
;f License No. NPF-3 '
-Serial No.._1-766 November 6, 1987. )
-Page 2 This Special Report was not' submitted within the required; time limit due to-
. failure to follov. procedure. Personnel did not initiate a Potential' Condition 1
)
Adverse to Quality Report (PCA0R) at the time FDZ-A208 was declared inoperable. i The Station's PCAQR system tracks the relevant action. statements'and informs'the appropriate group of the potential Special Report.
_I
'The Shift Supervisor ~ made his Unit Log entry indicating the zone was inoperable 1 and noted that the' hourly fire'vatch patrol'was established.- However,-he did I not-initiate a PCAQR. The Nuclear Group Procedure NG-0A-702 requires the -{
initiation of a PCA0R for an event potentially " reportable to anfoutside agency".
As corrective action for the late Special Report, all Shift Supervisors vill be !
required to review this incident to-improve their understanding of the proper ,
mechanism for ensuring such incidents are reviewed and reported appropriately. "
These review vill be completed by November 20, 1987.
This report is submitted in'accordance with Technical Specification 3.3.3.8 and-6.9.2.
l Yours truly,.
1 ?fn -
) Louis F. S z j l Plant Manager .
j Davis-Besse Nuclear Power Station j
LFS/ed.
cc: Mr. A. Bert Davis Regional Administrator i USNRC Region III I Mr.~ Paul Byron' DB-1 NRC Resident Inspector 1