|
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20210H6271999-07-29029 July 1999 Summary of 990622 Meeting with EOI Re NRC Briefing by RBS on Issues Associated with Root Cause Investigation Into Fuel Cladding Failures That Occurred During Recent Cycle 8 Operation.List of Attendees Provided ML20205D4831999-03-25025 March 1999 Summary of 990222 Public Hearing with Util Re Gathering Addl Info Related to Two Petitions Filed Pursuant to 10CFR2.206 by Ucs Re Operation of River Bend Station & Perry Nuclear Power Plant.List of Attendees & Transcript of Hearing Encl ML20198G5501998-12-18018 December 1998 Summary of 981201-02 Workshop with Entergy Operations,Inc in Taft,La Re Licensing Processes,Licensing Submittals & Other Topics That May Affect Licensing Processes & Submittals. Copy of Slides Presented During Workshop Encl ML20155H3931998-11-0202 November 1998 Summary of 981007 Meeting with Util Re Review Status of Standard Quality Assurance Manual for All Util Sites.List of Meeting Attendees Encl ML20154C4771998-10-0202 October 1998 Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling ML20151X0011998-09-10010 September 1998 Summary of 980827 Meeting W/Util to Discuss Status of Review of Std QA Manual.List of Attendees Encl ML20236M0501998-07-0808 July 1998 Summary of 980702 Meeting W/Entergy Operations,Inc to Discuss Review Status of Std QA Manual for All Entergy Sites.List of Attendees Encl ML20217K3461998-04-24024 April 1998 Summary of 980401 Meeting W/Entergy Operations,Inc Re Licensing Issues & Regulatory Performance Efficiencies.List of Attendees & Agenda for Meeting Encl ML20217K5141998-04-24024 April 1998 Summary of 980416 Meeting W/Entergy Corp Re Standardization of site-specific Security Plans.List of Meeting Attendees & Agenda for Meeting Encl ML20217F4811998-03-26026 March 1998 Summary of 980319 Meeting W/Licensee to Discuss Status of Development of Std QA Manual for All Entergy Sites.List of Attendees Encl ML20203B5741998-02-11011 February 1998 Summary of 980122 Meeting W/Entergy in Rockville,Maryland Re Licensing Issues & Standardization of Licensing Documents. List of Meeting Attendees & Meeting Agenda Encl ML20212G8521997-10-29029 October 1997 Summary of 971022 Meeting W/Entergy Svcs,Inc Re Development & Implementation of Common or Std QAP for All Sites.List of Meeting Attendees & Viewgraphs Encl ML20148F0391997-05-30030 May 1997 Summary of 970521 Meeting W/Entergy Operations,Inc Re Proposed Removal of MSL Lcs,Removal of Pvlc Sys & Increase of MSIV Leakage Requirements in TS ML20140C1681997-03-28028 March 1997 Summary of 970313 Meeting W/Entergy Operations,Inc to Discuss Proposed ECCS Suction Strainer Mod.List of Attendees & ECCS Suction Strainer Mod Encl ML20149M3611996-12-11011 December 1996 Summary of 96111 Meeting W/Licensee in Rockville,Md to Discuss Comments Developed in Response to NRC Advance Notice of Proposed Rulemaking on Financial Assurance Requirements for Decommissioning Nuclear Reactors.List of Attendees Encl ML20134M6611996-11-21021 November 1996 Summary of 961114 Meeting W/Listed Licensees in Rockville,Md to Discuss Results of Self Assessment of Accuracy of Info in FSARs for Four Nuclear Reactor Sites.List of Attendees & Licensee Handout Encl ML20056C5251993-06-18018 June 1993 Summary of 930513 Meeting W/Util Re Changes to Security & Response Plans.Meeting Agenda & List of Attendees Encl ML20059C7421993-03-0202 March 1993 Summary of 392nd ACRS Meeting on 921209-11 in Bethesda,Md Re SBO Rule,Ts Improvement Program,Advanced BWR Design,River Bend Nuclear Plant Reliability Monitoring Program & Generic Issue 120,online Testability of Protection Sys ML20055G8611990-07-18018 July 1990 Summary of 900712 Meeting W/Util Re Reload Design Methods. List of Attendees Encl ML20055F0941990-07-10010 July 1990 Summary of 900620 Meeting W/Util Re Proposed License Amends, Including Removal of Snubber Requirements from Tech Specs for Relocation Into Inservice Insp Program & Util Responses to Generic Ltrs 88-01 & 87-09 ML20246B6901989-08-0101 August 1989 Summary of 890727 Meeting W/Util in Arlington,Tx Re Plant Security Enhancement Program & Personnel Changes ML20205A7431988-10-12012 October 1988 Summary of 880928 Meeting W/Util Re 880825 Reactor Trip & Followup Actions by Licensee.Viewgraphs Encl ML20153G6331988-08-30030 August 1988 Summary of Operating Reactor Events Meeting 88-35 on 880830, Including Summary of Reactor Scrams for Wk Ending 880828. Significant Event Identified for Input to NRC Performenance Indicator Program ML20151Z4211988-08-25025 August 1988 Summary of 880818 Meeting W/Util in Rockville,Md Re License Amend Application to Permit Performance of Leak Rate Tests of Containment Isolation Valves in Parallel W/Refueling Operations ML20151Z7921988-08-25025 August 1988 Summary of 880817 Meeting W/Util in Rockville,Md Re Util 5-yr Business Plan to Improve Safety & to Reduce Operating Costs at Plant.List of Attendees & Handouts Encl ML20151R5391988-08-0808 August 1988 Summary of 880623 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines. Resolution of Issues Listed ML20151R8701988-08-0505 August 1988 Summary of 880726 Meeting W/Util in Arlington,Tx Re 5-yr Business Plan.Handouts Encl ML20154J4061988-05-17017 May 1988 Summary of 880414 Meeting W/Representatives & Contractors of Licensee in Rockville,Md Re 870605 Amend Application for Util.Highlights of Discussion Listed.Nrc Indicated That Request for Addl Info Would Be Prepared If Needed ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20147C8041988-01-0606 January 1988 Summary of 871215 & 16 Meetings W/Util in St Francisville,La Re Questions & Comments Resulting from Review of Inservice Testing Program.Inel Trip Rept,List of Attendees & Questions & Comments Encl ML20147C8201987-12-28028 December 1987 Trip Rept of 871215-16 Site Visit to Discuss Pump & Valve Inservice Testing Program ML20236J2291987-10-30030 October 1987 Summary of 871007 Meeting W/Hydrogen Control Owners Group (Hcog) Re Hcog Submittals on Methods for Calculating Equipment Temp Based on Quarter Scale Test Data & Impact of Station Blackout Considerations on Hcog Programs.W/Encl ML20235M9151987-07-19019 July 1987 Summary of 870615 Meeting W/Util in Bethesda,Md Re Revs to Util Emergency Operating Procedures & to Satisfy Sser Requirement.Attendee List Encl ML20214A2151987-05-13013 May 1987 Summary of 870508 Meeting W/Util & GE Re Licensee Plans for Fuel Reload.List of Attendees & Meeting Viewgraphs Encl ML20215L3281987-05-0505 May 1987 Summary of Operating Reactors Events Meeting 87-11 on 870420.List of Attendees,Viewgraphs & Input to NRC Performance Indicator Program Encl ML20212Q9681987-04-21021 April 1987 Summary of 870217 Meeting W/Util to Discuss Issues Re Containment Vending,Reg Guide 1.97,TDI Diesels,Util Plans for First Refueling Outage,Engineering Expertise on Shift, UHS Monitor & OL Amends ML20211M9761987-02-24024 February 1987 Summary of 870203 Meeting W/Mark III Containment Hydrogen Control Owners Group Re CLASIX-3 Computer Code Validation & Emergency Procedure Guidelines.List of Attendees Encl ML20207B0141986-10-31031 October 1986 Summary of 861022 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines for Hydrogen Generation Event & Validation of Methods for Calculating Heat Transfer.Viewgraphs Encl ML20203G6921986-07-25025 July 1986 Summary of 860619 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Mods of Clasix-3 Computer Code & Secondary Burning in Quarter Scale Test.List of Meeting Attendees & Handouts Encl ML20207E2811986-07-16016 July 1986 Summary of Operating Reactors Events Meeting 86-24 on 860714 Re Events Occurring Since 860707 Meeting ML20211G7781986-06-13013 June 1986 Summary of Operating Reactor Events Meeting 86-19 on 860609. List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20206G6571986-06-10010 June 1986 Summary of 860529 Meeting W/Util Re Licensing Priorities & Matters Associated W/Forthcoming Transition of Util from Startup Test to Commercial Operation.Attendees List & Viewgraphs Encl ML20211G9361986-06-0606 June 1986 Summary of Operating Reactor Events Meeting 86-18 on 860602 Re Events Occurring Since 860519 Meeting.Attendee List, Events,Significant Elements of Events & Completion Dates for Assignments Encl ML20210R8471986-05-13013 May 1986 Summary of Operating Reactors Events Meeting 86-16 on 860512 Re Events Occurring Since Last Meeting.List of Attendees & Related Info Encl ML20197F1691986-05-0808 May 1986 Summary of Operating Reactors Events 860428 Meeting W/Listed Divs Re Chernobyl Nuclear Accident & Events at Us Reactors ML20197F7721986-05-0808 May 1986 Summary of Operating Reactors Events Meeting 86-15 on 860505.List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20203M9431986-04-25025 April 1986 Summary of Operating Reactors Events Meeting 86-13 on 860421 Re Events Occurring Since 860414 Meeting.Attendance List, Viewgraphs & Supporting Documentation Encl ML20141G2901986-04-0707 April 1986 Summary of 860313 Meeting W/Mark III Containment Hydrogen Control Owners Group in Bethesda,Md Re Heat Loss Analysis. List of Attendees,Handout & Viewgraphs Encl ML20210J0261986-03-24024 March 1986 Summary of Operating Reactor Events Meeting 86-08 on 860317 to Discuss Events Occurring Since Last Meeting on 860310 ML20154P0071986-03-12012 March 1986 Summary of Operating Reactor Events 860303 Meeting 86-06 W/Ornl Re Events Occurring Since 860224 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl 1999-07-29
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20210H6271999-07-29029 July 1999 Summary of 990622 Meeting with EOI Re NRC Briefing by RBS on Issues Associated with Root Cause Investigation Into Fuel Cladding Failures That Occurred During Recent Cycle 8 Operation.List of Attendees Provided ML20205D4831999-03-25025 March 1999 Summary of 990222 Public Hearing with Util Re Gathering Addl Info Related to Two Petitions Filed Pursuant to 10CFR2.206 by Ucs Re Operation of River Bend Station & Perry Nuclear Power Plant.List of Attendees & Transcript of Hearing Encl ML20198G5501998-12-18018 December 1998 Summary of 981201-02 Workshop with Entergy Operations,Inc in Taft,La Re Licensing Processes,Licensing Submittals & Other Topics That May Affect Licensing Processes & Submittals. Copy of Slides Presented During Workshop Encl ML20155H3931998-11-0202 November 1998 Summary of 981007 Meeting with Util Re Review Status of Standard Quality Assurance Manual for All Util Sites.List of Meeting Attendees Encl ML20154C4771998-10-0202 October 1998 Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling ML20151X0011998-09-10010 September 1998 Summary of 980827 Meeting W/Util to Discuss Status of Review of Std QA Manual.List of Attendees Encl ML20236M0501998-07-0808 July 1998 Summary of 980702 Meeting W/Entergy Operations,Inc to Discuss Review Status of Std QA Manual for All Entergy Sites.List of Attendees Encl ML20217K3461998-04-24024 April 1998 Summary of 980401 Meeting W/Entergy Operations,Inc Re Licensing Issues & Regulatory Performance Efficiencies.List of Attendees & Agenda for Meeting Encl ML20217K5141998-04-24024 April 1998 Summary of 980416 Meeting W/Entergy Corp Re Standardization of site-specific Security Plans.List of Meeting Attendees & Agenda for Meeting Encl ML20217F4811998-03-26026 March 1998 Summary of 980319 Meeting W/Licensee to Discuss Status of Development of Std QA Manual for All Entergy Sites.List of Attendees Encl ML20203B5741998-02-11011 February 1998 Summary of 980122 Meeting W/Entergy in Rockville,Maryland Re Licensing Issues & Standardization of Licensing Documents. List of Meeting Attendees & Meeting Agenda Encl ML20212G8521997-10-29029 October 1997 Summary of 971022 Meeting W/Entergy Svcs,Inc Re Development & Implementation of Common or Std QAP for All Sites.List of Meeting Attendees & Viewgraphs Encl ML20148F0391997-05-30030 May 1997 Summary of 970521 Meeting W/Entergy Operations,Inc Re Proposed Removal of MSL Lcs,Removal of Pvlc Sys & Increase of MSIV Leakage Requirements in TS ML20140C1681997-03-28028 March 1997 Summary of 970313 Meeting W/Entergy Operations,Inc to Discuss Proposed ECCS Suction Strainer Mod.List of Attendees & ECCS Suction Strainer Mod Encl ML20149M3611996-12-11011 December 1996 Summary of 96111 Meeting W/Licensee in Rockville,Md to Discuss Comments Developed in Response to NRC Advance Notice of Proposed Rulemaking on Financial Assurance Requirements for Decommissioning Nuclear Reactors.List of Attendees Encl ML20134M6611996-11-21021 November 1996 Summary of 961114 Meeting W/Listed Licensees in Rockville,Md to Discuss Results of Self Assessment of Accuracy of Info in FSARs for Four Nuclear Reactor Sites.List of Attendees & Licensee Handout Encl ML20056C5251993-06-18018 June 1993 Summary of 930513 Meeting W/Util Re Changes to Security & Response Plans.Meeting Agenda & List of Attendees Encl ML20059C7421993-03-0202 March 1993 Summary of 392nd ACRS Meeting on 921209-11 in Bethesda,Md Re SBO Rule,Ts Improvement Program,Advanced BWR Design,River Bend Nuclear Plant Reliability Monitoring Program & Generic Issue 120,online Testability of Protection Sys ML20055G8611990-07-18018 July 1990 Summary of 900712 Meeting W/Util Re Reload Design Methods. List of Attendees Encl ML20055F0941990-07-10010 July 1990 Summary of 900620 Meeting W/Util Re Proposed License Amends, Including Removal of Snubber Requirements from Tech Specs for Relocation Into Inservice Insp Program & Util Responses to Generic Ltrs 88-01 & 87-09 ML20246B6901989-08-0101 August 1989 Summary of 890727 Meeting W/Util in Arlington,Tx Re Plant Security Enhancement Program & Personnel Changes ML20205A7431988-10-12012 October 1988 Summary of 880928 Meeting W/Util Re 880825 Reactor Trip & Followup Actions by Licensee.Viewgraphs Encl ML20153G6331988-08-30030 August 1988 Summary of Operating Reactor Events Meeting 88-35 on 880830, Including Summary of Reactor Scrams for Wk Ending 880828. Significant Event Identified for Input to NRC Performenance Indicator Program ML20151Z7921988-08-25025 August 1988 Summary of 880817 Meeting W/Util in Rockville,Md Re Util 5-yr Business Plan to Improve Safety & to Reduce Operating Costs at Plant.List of Attendees & Handouts Encl ML20151Z4211988-08-25025 August 1988 Summary of 880818 Meeting W/Util in Rockville,Md Re License Amend Application to Permit Performance of Leak Rate Tests of Containment Isolation Valves in Parallel W/Refueling Operations ML20151R5391988-08-0808 August 1988 Summary of 880623 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines. Resolution of Issues Listed ML20151R8701988-08-0505 August 1988 Summary of 880726 Meeting W/Util in Arlington,Tx Re 5-yr Business Plan.Handouts Encl ML20154J4061988-05-17017 May 1988 Summary of 880414 Meeting W/Representatives & Contractors of Licensee in Rockville,Md Re 870605 Amend Application for Util.Highlights of Discussion Listed.Nrc Indicated That Request for Addl Info Would Be Prepared If Needed ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20147C8041988-01-0606 January 1988 Summary of 871215 & 16 Meetings W/Util in St Francisville,La Re Questions & Comments Resulting from Review of Inservice Testing Program.Inel Trip Rept,List of Attendees & Questions & Comments Encl ML20236J2291987-10-30030 October 1987 Summary of 871007 Meeting W/Hydrogen Control Owners Group (Hcog) Re Hcog Submittals on Methods for Calculating Equipment Temp Based on Quarter Scale Test Data & Impact of Station Blackout Considerations on Hcog Programs.W/Encl ML20235M9151987-07-19019 July 1987 Summary of 870615 Meeting W/Util in Bethesda,Md Re Revs to Util Emergency Operating Procedures & to Satisfy Sser Requirement.Attendee List Encl ML20214A2151987-05-13013 May 1987 Summary of 870508 Meeting W/Util & GE Re Licensee Plans for Fuel Reload.List of Attendees & Meeting Viewgraphs Encl ML20215L3281987-05-0505 May 1987 Summary of Operating Reactors Events Meeting 87-11 on 870420.List of Attendees,Viewgraphs & Input to NRC Performance Indicator Program Encl ML20212Q9681987-04-21021 April 1987 Summary of 870217 Meeting W/Util to Discuss Issues Re Containment Vending,Reg Guide 1.97,TDI Diesels,Util Plans for First Refueling Outage,Engineering Expertise on Shift, UHS Monitor & OL Amends ML20211M9761987-02-24024 February 1987 Summary of 870203 Meeting W/Mark III Containment Hydrogen Control Owners Group Re CLASIX-3 Computer Code Validation & Emergency Procedure Guidelines.List of Attendees Encl ML20207B0141986-10-31031 October 1986 Summary of 861022 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines for Hydrogen Generation Event & Validation of Methods for Calculating Heat Transfer.Viewgraphs Encl ML20203G6921986-07-25025 July 1986 Summary of 860619 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Mods of Clasix-3 Computer Code & Secondary Burning in Quarter Scale Test.List of Meeting Attendees & Handouts Encl ML20207E2811986-07-16016 July 1986 Summary of Operating Reactors Events Meeting 86-24 on 860714 Re Events Occurring Since 860707 Meeting ML20211G7781986-06-13013 June 1986 Summary of Operating Reactor Events Meeting 86-19 on 860609. List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20206G6571986-06-10010 June 1986 Summary of 860529 Meeting W/Util Re Licensing Priorities & Matters Associated W/Forthcoming Transition of Util from Startup Test to Commercial Operation.Attendees List & Viewgraphs Encl ML20211G9361986-06-0606 June 1986 Summary of Operating Reactor Events Meeting 86-18 on 860602 Re Events Occurring Since 860519 Meeting.Attendee List, Events,Significant Elements of Events & Completion Dates for Assignments Encl ML20210R8471986-05-13013 May 1986 Summary of Operating Reactors Events Meeting 86-16 on 860512 Re Events Occurring Since Last Meeting.List of Attendees & Related Info Encl ML20197F1691986-05-0808 May 1986 Summary of Operating Reactors Events 860428 Meeting W/Listed Divs Re Chernobyl Nuclear Accident & Events at Us Reactors ML20197F7721986-05-0808 May 1986 Summary of Operating Reactors Events Meeting 86-15 on 860505.List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20203M9431986-04-25025 April 1986 Summary of Operating Reactors Events Meeting 86-13 on 860421 Re Events Occurring Since 860414 Meeting.Attendance List, Viewgraphs & Supporting Documentation Encl ML20141G2901986-04-0707 April 1986 Summary of 860313 Meeting W/Mark III Containment Hydrogen Control Owners Group in Bethesda,Md Re Heat Loss Analysis. List of Attendees,Handout & Viewgraphs Encl ML20210J0261986-03-24024 March 1986 Summary of Operating Reactor Events Meeting 86-08 on 860317 to Discuss Events Occurring Since Last Meeting on 860310 ML20154P0071986-03-12012 March 1986 Summary of Operating Reactor Events 860303 Meeting 86-06 W/Ornl Re Events Occurring Since 860224 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl 1999-07-29
[Table view] |
Text
.
O.
, \ DLN
- pm nuouq'o UNITED STATES
- ~g
!" n NUCLEAR REGULATORY COMMISSION
{ ,E WASHING TON. D. C. 20555 q g July 9,1987 ]
Docket No. 50-458 MEMORANDUM FOR: Jose A. Calvo, Director Project Director IV Division of Reactor Project-III, IV, V, and Special Projects FROM: Walter A. Paulson, Project Manager Project Directorate IV Division of Reactor Projects - III, IV, V, and Special Projects
SUBJECT:
MEETING
SUMMARY
FOR MEETING HELD JUNE 15, 1987 IN BETHESDA, MARYLAND CONCERNING REVISIONS TO THE RIVER BEND E0Ps A meeting was held in Bethesda, Maryland on June 15, 1987 to discuss Gulf States Utilities' (GSU) plans to revise the emergency operating procedures (EOPs) for their River Bend Station. A list of attendees and their affiliation is provided as Enclosure I. Enclosure II contains a meeting agenda that was handed out at the meeting. Staff from G5U and their contractor, General Physics Corp., presented their proposal for going to a flow chart format for their E0Ps. Supplement No. 3 to the River Bend SER states that the staff should review GSU's method for developing, verifying / validating, and implement-ing flow chart E0Ps before their implementation. It was intended that the meeting satisfy the SSER requirement.
The significant points discussed at the meeting are summarized below.
)
- 1. GSU is considering revising their present E0Ps to a flow chart format.
It is expected that this would make them more user-friendly. That is, if proper consideration is given to human factors considerations, the flow charts will make it easier to implement the E0Ps.
- 2. GSU indicated that they tried to develop a " single path" approach because earlier, INPO and the NRC had identified problems with RBS operators performing steps concurrently which were in their narrative format E0Ps.
- 3. River Bend Station flow chart E0Ps are based on REV. 4 of the GE Owner's Group Emergency Procedures Guidelines (NOTE: This revision has not been approved by the NRC. Schedule for review and approval is being established by the staff.)
- 4. GSU has proposed four flow charts which will cover all of River Bend Station's E0Ps. E0P-1 is the main flow chart that is entered on any scram and covers a ATVS and non-ATWS events, and which may lead to other ,
I flow chart (s), on Containment Pressure, Suppression Pool Level, and/or Secondary Containment.
i l
8707170374 070719 PDR ADOCK 050G34LO i P PDR j I
_ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ____________j
.o l ~2-
' a
- 5. The licensee indicated that the charts will be laminated with a non glare material and that ample space is available in the control room to allow ease of use. Size of the final flow charts will vary.
- 6. There was a discussion of how GSU was providing essential notes and cautions in the E0Ps. The licensee indicated that the writer's guide portion of the PGP has been modified to incorporate changes reflecting flowchart procedure format (e.g., conventions used re: color coding, symbology,etc.).
- 7. The staff commented that they would like GSU to consider providing a grid coordinate system or overlay to index various parts of a particular E0P flow chart.
- 8. There was a general discussion of the role of the Shift Foreman in directing the E0Ps.
- 9. There was a general discussion of the scope and overall concept of GSU's verification and validation effort for the E0Ps. GSU indicated that flow charts are currently undergoing V/V with cperators who have not been exposed to flow chart-type procedures before and that a minimum control room staffing is being used during V/V. Multiple failure scenarios are being used in the simulator exercising of the E0Ps, according to the licensee.
- 10. GSU stated that it was their intention to complete training on the new flow chart E0Ps this fall during the refueling outage and to begin use of the flow charts at startup for the next cycle.
- 11. The staff recommended that GSU incorporate the results of the V&V program and do a thorough documentation of all phases of the E0P effort in their 50.59 reviews.
- 12. GSU indicated that they would provide the staff with a copy of their revised .0GP and copies of the final version of their flow chart E0Ps.
.The staff has not conducted a detailed human factors review of the sample of E0Ps or any changes made to the PGP, nor have they reviewed the engineering adequacy of the E0Ps. The staff has not reviewed and approved Revision 4 of the GE Owner's Group Emergency Procedures Guidelines, the revision against which flow chart E0Ps are written. Based on the verbal presentation made by GSU describing the method for developing, verifying / validating and implementing their flowchart format E0Ps and a preview of a sample of draft flow charted E0Ps by the staff, the methodology should result in E0Ps that can be used to effectively mitigate transient and accident conditions.
The staff concludes that the SSER #3 requirement for staff review prior to implementing flow chart E0Ps has been satisfied and that this meeting summary should serve as documentation that the staff has been given an opportunity to review the proposed E0Ps and provide their comments.
hed p
()Q(puws#y Walter A. Paulson, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects
Enclosure:
- 1. List of Attendees
- 2. Meeting Agenda cc w/ enclosures:
See next page DISTRIBUTION Docket File NRC PDR Local PDR PD4 Reading J. Partlow D. Crutchfield F. Schroeder J. A. Calvo W. Paulson P. Noonan 0GC-Beth E. Jordan ACRS (10)
NRC Participants PD4/ M PD4/ PD4/D lb PNoonan WPaul r JCalvo 7/7/87 7/[ / - 7/t /87
p.- .
'Mr. James C. Deddens Gulf States Utilities Company River Bend Nuclear Plant cc:
Troy B. Conner, Jr. , Esci. Mr. J. E. Booker Conner and Wetterhahn Manager-River Bend Oversight 1747 Pennsylvania Avenue, NW P. O. Box 2951 Washington, D.C. 20006 Beaumont, TX 77704 Mr. Eddie Grant - Mr. William H. Spell, Administrator Director - Nuclear Licensing Nuclear Energy Division Gulf States Utilities Company Office of Environmental Affairs P. O. Box 220 P.'O. Box 14690-St. Francisville, LA 70775 Baton Rouge, Louisiana 70898 Richard M. Troy, Jr. , Esq.-
Assistant Attorney General in Charge Mr. J. David McNeill, III State of Louisiana Department of Justice William G. Davis, Esq.
234 Loyola Avenue Department of Justice-New Orleans, Louisiana 70112 Attorney General's Office .
7434 Perkins Road Resident Inspector Baton Rouge, Louisiana 70808 P. 0. Box 1051 St. Francisville, Louisiana 70775 H. Anne Plettinger 3456 Villa Rose Drive Gretchen R. Rothschild Baton Rouge, Louisiana 70806 Louisianians for Safe Energy, Inc.
1659 Glenmore Avenue Baton Rouge, Louisiana 70775 President of West Feliciana Police Jury Regional Administrator, Region IV P. O. Box 1921 U.S. Nuclear Regulatory Commission St. Francisville, Louisiana 70775 Office of Executive Director for Operations Mr. Frank J. Uddo 611 Ryan Plaza Drive, Suite 1000 Uddo & Forter Arlington, Texas 76011 6305 Elysian Fields Avenue Suite 400 Philip G. Harris New Orleans, Louisiana 70122 Cajun Electric Power Coop. Inc.
10719 Airline Highway P. O. Box 15540 Baton Rouge, LA 70895
)t.
.g Enclosure 1 1
L <
LIST OF ATTENDEES'AT MEETING HELD ON' JUNE 15, 1987 q
.IN BETHESDA, MARYLAND TO DISCUSS PROPOSED CHANGES T0 RIVER BEND E0Ps-L:
l l
NRC.
J. Wilson W.- Jonde.
J..Bongarra W. Kennedy C. Goodman GSU.
D. WiTTiamson-
,R. King-
. General Physics-J.-Peters M. Martin M. D. Venters R. Liddle-NUS(Observer)
M. Martin
Enclosure 2 RIVER BEND STATION FLOW CHARTED E0PS
-JUNE 15, 1987 MEETING-
-HUMAN FACTORS 1
-TASK ANALYSIS
-V&V
-FLOW CHARTS DISCUSSION
.. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ . _ _ _ _ _ _ _ .