MONTHYEARML20210H6271999-07-29029 July 1999 Summary of 990622 Meeting with EOI Re NRC Briefing by RBS on Issues Associated with Root Cause Investigation Into Fuel Cladding Failures That Occurred During Recent Cycle 8 Operation.List of Attendees Provided ML20205D4831999-03-25025 March 1999 Summary of 990222 Public Hearing with Util Re Gathering Addl Info Related to Two Petitions Filed Pursuant to 10CFR2.206 by Ucs Re Operation of River Bend Station & Perry Nuclear Power Plant.List of Attendees & Transcript of Hearing Encl ML20198G5501998-12-18018 December 1998 Summary of 981201-02 Workshop with Entergy Operations,Inc in Taft,La Re Licensing Processes,Licensing Submittals & Other Topics That May Affect Licensing Processes & Submittals. Copy of Slides Presented During Workshop Encl ML20155H3931998-11-0202 November 1998 Summary of 981007 Meeting with Util Re Review Status of Standard Quality Assurance Manual for All Util Sites.List of Meeting Attendees Encl ML20154C4771998-10-0202 October 1998 Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling ML20151X0011998-09-10010 September 1998 Summary of 980827 Meeting W/Util to Discuss Status of Review of Std QA Manual.List of Attendees Encl ML20236M0501998-07-0808 July 1998 Summary of 980702 Meeting W/Entergy Operations,Inc to Discuss Review Status of Std QA Manual for All Entergy Sites.List of Attendees Encl ML20217K3461998-04-24024 April 1998 Summary of 980401 Meeting W/Entergy Operations,Inc Re Licensing Issues & Regulatory Performance Efficiencies.List of Attendees & Agenda for Meeting Encl ML20217K5141998-04-24024 April 1998 Summary of 980416 Meeting W/Entergy Corp Re Standardization of site-specific Security Plans.List of Meeting Attendees & Agenda for Meeting Encl ML20217F4811998-03-26026 March 1998 Summary of 980319 Meeting W/Licensee to Discuss Status of Development of Std QA Manual for All Entergy Sites.List of Attendees Encl ML20203B5741998-02-11011 February 1998 Summary of 980122 Meeting W/Entergy in Rockville,Maryland Re Licensing Issues & Standardization of Licensing Documents. List of Meeting Attendees & Meeting Agenda Encl ML20212G8521997-10-29029 October 1997 Summary of 971022 Meeting W/Entergy Svcs,Inc Re Development & Implementation of Common or Std QAP for All Sites.List of Meeting Attendees & Viewgraphs Encl ML20148F0391997-05-30030 May 1997 Summary of 970521 Meeting W/Entergy Operations,Inc Re Proposed Removal of MSL Lcs,Removal of Pvlc Sys & Increase of MSIV Leakage Requirements in TS ML20140C1681997-03-28028 March 1997 Summary of 970313 Meeting W/Entergy Operations,Inc to Discuss Proposed ECCS Suction Strainer Mod.List of Attendees & ECCS Suction Strainer Mod Encl ML20149M3611996-12-11011 December 1996 Summary of 96111 Meeting W/Licensee in Rockville,Md to Discuss Comments Developed in Response to NRC Advance Notice of Proposed Rulemaking on Financial Assurance Requirements for Decommissioning Nuclear Reactors.List of Attendees Encl ML20134M6611996-11-21021 November 1996 Summary of 961114 Meeting W/Listed Licensees in Rockville,Md to Discuss Results of Self Assessment of Accuracy of Info in FSARs for Four Nuclear Reactor Sites.List of Attendees & Licensee Handout Encl ML20056C5251993-06-18018 June 1993 Summary of 930513 Meeting W/Util Re Changes to Security & Response Plans.Meeting Agenda & List of Attendees Encl ML20059C7421993-03-0202 March 1993 Summary of 392nd ACRS Meeting on 921209-11 in Bethesda,Md Re SBO Rule,Ts Improvement Program,Advanced BWR Design,River Bend Nuclear Plant Reliability Monitoring Program & Generic Issue 120,online Testability of Protection Sys ML20055G8611990-07-18018 July 1990 Summary of 900712 Meeting W/Util Re Reload Design Methods. List of Attendees Encl ML20055F0941990-07-10010 July 1990 Summary of 900620 Meeting W/Util Re Proposed License Amends, Including Removal of Snubber Requirements from Tech Specs for Relocation Into Inservice Insp Program & Util Responses to Generic Ltrs 88-01 & 87-09 ML20246B6901989-08-0101 August 1989 Summary of 890727 Meeting W/Util in Arlington,Tx Re Plant Security Enhancement Program & Personnel Changes ML20205A7431988-10-12012 October 1988 Summary of 880928 Meeting W/Util Re 880825 Reactor Trip & Followup Actions by Licensee.Viewgraphs Encl ML20153G6331988-08-30030 August 1988 Summary of Operating Reactor Events Meeting 88-35 on 880830, Including Summary of Reactor Scrams for Wk Ending 880828. Significant Event Identified for Input to NRC Performenance Indicator Program ML20151Z7921988-08-25025 August 1988 Summary of 880817 Meeting W/Util in Rockville,Md Re Util 5-yr Business Plan to Improve Safety & to Reduce Operating Costs at Plant.List of Attendees & Handouts Encl ML20151Z4211988-08-25025 August 1988 Summary of 880818 Meeting W/Util in Rockville,Md Re License Amend Application to Permit Performance of Leak Rate Tests of Containment Isolation Valves in Parallel W/Refueling Operations ML20151R5391988-08-0808 August 1988 Summary of 880623 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines. Resolution of Issues Listed ML20151R8701988-08-0505 August 1988 Summary of 880726 Meeting W/Util in Arlington,Tx Re 5-yr Business Plan.Handouts Encl ML20154J4061988-05-17017 May 1988 Summary of 880414 Meeting W/Representatives & Contractors of Licensee in Rockville,Md Re 870605 Amend Application for Util.Highlights of Discussion Listed.Nrc Indicated That Request for Addl Info Would Be Prepared If Needed ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20147C8041988-01-0606 January 1988 Summary of 871215 & 16 Meetings W/Util in St Francisville,La Re Questions & Comments Resulting from Review of Inservice Testing Program.Inel Trip Rept,List of Attendees & Questions & Comments Encl ML20147C8201987-12-28028 December 1987 Trip Rept of 871215-16 Site Visit to Discuss Pump & Valve Inservice Testing Program ML20236J2291987-10-30030 October 1987 Summary of 871007 Meeting W/Hydrogen Control Owners Group (Hcog) Re Hcog Submittals on Methods for Calculating Equipment Temp Based on Quarter Scale Test Data & Impact of Station Blackout Considerations on Hcog Programs.W/Encl ML20235M9151987-07-19019 July 1987 Summary of 870615 Meeting W/Util in Bethesda,Md Re Revs to Util Emergency Operating Procedures & to Satisfy Sser Requirement.Attendee List Encl ML20214A2151987-05-13013 May 1987 Summary of 870508 Meeting W/Util & GE Re Licensee Plans for Fuel Reload.List of Attendees & Meeting Viewgraphs Encl ML20215L3281987-05-0505 May 1987 Summary of Operating Reactors Events Meeting 87-11 on 870420.List of Attendees,Viewgraphs & Input to NRC Performance Indicator Program Encl ML20212Q9681987-04-21021 April 1987 Summary of 870217 Meeting W/Util to Discuss Issues Re Containment Vending,Reg Guide 1.97,TDI Diesels,Util Plans for First Refueling Outage,Engineering Expertise on Shift, UHS Monitor & OL Amends ML20211M9761987-02-24024 February 1987 Summary of 870203 Meeting W/Mark III Containment Hydrogen Control Owners Group Re CLASIX-3 Computer Code Validation & Emergency Procedure Guidelines.List of Attendees Encl ML20207B0141986-10-31031 October 1986 Summary of 861022 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines for Hydrogen Generation Event & Validation of Methods for Calculating Heat Transfer.Viewgraphs Encl ML20203G6921986-07-25025 July 1986 Summary of 860619 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Mods of Clasix-3 Computer Code & Secondary Burning in Quarter Scale Test.List of Meeting Attendees & Handouts Encl ML20207E2811986-07-16016 July 1986 Summary of Operating Reactors Events Meeting 86-24 on 860714 Re Events Occurring Since 860707 Meeting ML20211G7781986-06-13013 June 1986 Summary of Operating Reactor Events Meeting 86-19 on 860609. List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20206G6571986-06-10010 June 1986 Summary of 860529 Meeting W/Util Re Licensing Priorities & Matters Associated W/Forthcoming Transition of Util from Startup Test to Commercial Operation.Attendees List & Viewgraphs Encl ML20211G9361986-06-0606 June 1986 Summary of Operating Reactor Events Meeting 86-18 on 860602 Re Events Occurring Since 860519 Meeting.Attendee List, Events,Significant Elements of Events & Completion Dates for Assignments Encl ML20210R8471986-05-13013 May 1986 Summary of Operating Reactors Events Meeting 86-16 on 860512 Re Events Occurring Since Last Meeting.List of Attendees & Related Info Encl ML20197F1691986-05-0808 May 1986 Summary of Operating Reactors Events 860428 Meeting W/Listed Divs Re Chernobyl Nuclear Accident & Events at Us Reactors ML20197F7721986-05-0808 May 1986 Summary of Operating Reactors Events Meeting 86-15 on 860505.List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20203M9431986-04-25025 April 1986 Summary of Operating Reactors Events Meeting 86-13 on 860421 Re Events Occurring Since 860414 Meeting.Attendance List, Viewgraphs & Supporting Documentation Encl ML20141G2901986-04-0707 April 1986 Summary of 860313 Meeting W/Mark III Containment Hydrogen Control Owners Group in Bethesda,Md Re Heat Loss Analysis. List of Attendees,Handout & Viewgraphs Encl ML20210J0261986-03-24024 March 1986 Summary of Operating Reactor Events Meeting 86-08 on 860317 to Discuss Events Occurring Since Last Meeting on 860310 ML20154P0071986-03-12012 March 1986 Summary of Operating Reactor Events 860303 Meeting 86-06 W/Ornl Re Events Occurring Since 860224 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl 1999-07-29
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20210H6271999-07-29029 July 1999 Summary of 990622 Meeting with EOI Re NRC Briefing by RBS on Issues Associated with Root Cause Investigation Into Fuel Cladding Failures That Occurred During Recent Cycle 8 Operation.List of Attendees Provided ML20205D4831999-03-25025 March 1999 Summary of 990222 Public Hearing with Util Re Gathering Addl Info Related to Two Petitions Filed Pursuant to 10CFR2.206 by Ucs Re Operation of River Bend Station & Perry Nuclear Power Plant.List of Attendees & Transcript of Hearing Encl ML20198G5501998-12-18018 December 1998 Summary of 981201-02 Workshop with Entergy Operations,Inc in Taft,La Re Licensing Processes,Licensing Submittals & Other Topics That May Affect Licensing Processes & Submittals. Copy of Slides Presented During Workshop Encl ML20155H3931998-11-0202 November 1998 Summary of 981007 Meeting with Util Re Review Status of Standard Quality Assurance Manual for All Util Sites.List of Meeting Attendees Encl ML20154C4771998-10-0202 October 1998 Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling ML20151X0011998-09-10010 September 1998 Summary of 980827 Meeting W/Util to Discuss Status of Review of Std QA Manual.List of Attendees Encl ML20236M0501998-07-0808 July 1998 Summary of 980702 Meeting W/Entergy Operations,Inc to Discuss Review Status of Std QA Manual for All Entergy Sites.List of Attendees Encl ML20217K3461998-04-24024 April 1998 Summary of 980401 Meeting W/Entergy Operations,Inc Re Licensing Issues & Regulatory Performance Efficiencies.List of Attendees & Agenda for Meeting Encl ML20217K5141998-04-24024 April 1998 Summary of 980416 Meeting W/Entergy Corp Re Standardization of site-specific Security Plans.List of Meeting Attendees & Agenda for Meeting Encl ML20217F4811998-03-26026 March 1998 Summary of 980319 Meeting W/Licensee to Discuss Status of Development of Std QA Manual for All Entergy Sites.List of Attendees Encl ML20203B5741998-02-11011 February 1998 Summary of 980122 Meeting W/Entergy in Rockville,Maryland Re Licensing Issues & Standardization of Licensing Documents. List of Meeting Attendees & Meeting Agenda Encl ML20212G8521997-10-29029 October 1997 Summary of 971022 Meeting W/Entergy Svcs,Inc Re Development & Implementation of Common or Std QAP for All Sites.List of Meeting Attendees & Viewgraphs Encl ML20148F0391997-05-30030 May 1997 Summary of 970521 Meeting W/Entergy Operations,Inc Re Proposed Removal of MSL Lcs,Removal of Pvlc Sys & Increase of MSIV Leakage Requirements in TS ML20140C1681997-03-28028 March 1997 Summary of 970313 Meeting W/Entergy Operations,Inc to Discuss Proposed ECCS Suction Strainer Mod.List of Attendees & ECCS Suction Strainer Mod Encl ML20149M3611996-12-11011 December 1996 Summary of 96111 Meeting W/Licensee in Rockville,Md to Discuss Comments Developed in Response to NRC Advance Notice of Proposed Rulemaking on Financial Assurance Requirements for Decommissioning Nuclear Reactors.List of Attendees Encl ML20134M6611996-11-21021 November 1996 Summary of 961114 Meeting W/Listed Licensees in Rockville,Md to Discuss Results of Self Assessment of Accuracy of Info in FSARs for Four Nuclear Reactor Sites.List of Attendees & Licensee Handout Encl ML20056C5251993-06-18018 June 1993 Summary of 930513 Meeting W/Util Re Changes to Security & Response Plans.Meeting Agenda & List of Attendees Encl ML20059C7421993-03-0202 March 1993 Summary of 392nd ACRS Meeting on 921209-11 in Bethesda,Md Re SBO Rule,Ts Improvement Program,Advanced BWR Design,River Bend Nuclear Plant Reliability Monitoring Program & Generic Issue 120,online Testability of Protection Sys ML20055G8611990-07-18018 July 1990 Summary of 900712 Meeting W/Util Re Reload Design Methods. List of Attendees Encl ML20055F0941990-07-10010 July 1990 Summary of 900620 Meeting W/Util Re Proposed License Amends, Including Removal of Snubber Requirements from Tech Specs for Relocation Into Inservice Insp Program & Util Responses to Generic Ltrs 88-01 & 87-09 ML20246B6901989-08-0101 August 1989 Summary of 890727 Meeting W/Util in Arlington,Tx Re Plant Security Enhancement Program & Personnel Changes ML20205A7431988-10-12012 October 1988 Summary of 880928 Meeting W/Util Re 880825 Reactor Trip & Followup Actions by Licensee.Viewgraphs Encl ML20153G6331988-08-30030 August 1988 Summary of Operating Reactor Events Meeting 88-35 on 880830, Including Summary of Reactor Scrams for Wk Ending 880828. Significant Event Identified for Input to NRC Performenance Indicator Program ML20151Z7921988-08-25025 August 1988 Summary of 880817 Meeting W/Util in Rockville,Md Re Util 5-yr Business Plan to Improve Safety & to Reduce Operating Costs at Plant.List of Attendees & Handouts Encl ML20151Z4211988-08-25025 August 1988 Summary of 880818 Meeting W/Util in Rockville,Md Re License Amend Application to Permit Performance of Leak Rate Tests of Containment Isolation Valves in Parallel W/Refueling Operations ML20151R5391988-08-0808 August 1988 Summary of 880623 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines. Resolution of Issues Listed ML20151R8701988-08-0505 August 1988 Summary of 880726 Meeting W/Util in Arlington,Tx Re 5-yr Business Plan.Handouts Encl ML20154J4061988-05-17017 May 1988 Summary of 880414 Meeting W/Representatives & Contractors of Licensee in Rockville,Md Re 870605 Amend Application for Util.Highlights of Discussion Listed.Nrc Indicated That Request for Addl Info Would Be Prepared If Needed ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20147C8041988-01-0606 January 1988 Summary of 871215 & 16 Meetings W/Util in St Francisville,La Re Questions & Comments Resulting from Review of Inservice Testing Program.Inel Trip Rept,List of Attendees & Questions & Comments Encl ML20236J2291987-10-30030 October 1987 Summary of 871007 Meeting W/Hydrogen Control Owners Group (Hcog) Re Hcog Submittals on Methods for Calculating Equipment Temp Based on Quarter Scale Test Data & Impact of Station Blackout Considerations on Hcog Programs.W/Encl ML20235M9151987-07-19019 July 1987 Summary of 870615 Meeting W/Util in Bethesda,Md Re Revs to Util Emergency Operating Procedures & to Satisfy Sser Requirement.Attendee List Encl ML20214A2151987-05-13013 May 1987 Summary of 870508 Meeting W/Util & GE Re Licensee Plans for Fuel Reload.List of Attendees & Meeting Viewgraphs Encl ML20215L3281987-05-0505 May 1987 Summary of Operating Reactors Events Meeting 87-11 on 870420.List of Attendees,Viewgraphs & Input to NRC Performance Indicator Program Encl ML20212Q9681987-04-21021 April 1987 Summary of 870217 Meeting W/Util to Discuss Issues Re Containment Vending,Reg Guide 1.97,TDI Diesels,Util Plans for First Refueling Outage,Engineering Expertise on Shift, UHS Monitor & OL Amends ML20211M9761987-02-24024 February 1987 Summary of 870203 Meeting W/Mark III Containment Hydrogen Control Owners Group Re CLASIX-3 Computer Code Validation & Emergency Procedure Guidelines.List of Attendees Encl ML20207B0141986-10-31031 October 1986 Summary of 861022 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines for Hydrogen Generation Event & Validation of Methods for Calculating Heat Transfer.Viewgraphs Encl ML20203G6921986-07-25025 July 1986 Summary of 860619 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Mods of Clasix-3 Computer Code & Secondary Burning in Quarter Scale Test.List of Meeting Attendees & Handouts Encl ML20207E2811986-07-16016 July 1986 Summary of Operating Reactors Events Meeting 86-24 on 860714 Re Events Occurring Since 860707 Meeting ML20211G7781986-06-13013 June 1986 Summary of Operating Reactor Events Meeting 86-19 on 860609. List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20206G6571986-06-10010 June 1986 Summary of 860529 Meeting W/Util Re Licensing Priorities & Matters Associated W/Forthcoming Transition of Util from Startup Test to Commercial Operation.Attendees List & Viewgraphs Encl ML20211G9361986-06-0606 June 1986 Summary of Operating Reactor Events Meeting 86-18 on 860602 Re Events Occurring Since 860519 Meeting.Attendee List, Events,Significant Elements of Events & Completion Dates for Assignments Encl ML20210R8471986-05-13013 May 1986 Summary of Operating Reactors Events Meeting 86-16 on 860512 Re Events Occurring Since Last Meeting.List of Attendees & Related Info Encl ML20197F7721986-05-0808 May 1986 Summary of Operating Reactors Events Meeting 86-15 on 860505.List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20197F1691986-05-0808 May 1986 Summary of Operating Reactors Events 860428 Meeting W/Listed Divs Re Chernobyl Nuclear Accident & Events at Us Reactors ML20203M9431986-04-25025 April 1986 Summary of Operating Reactors Events Meeting 86-13 on 860421 Re Events Occurring Since 860414 Meeting.Attendance List, Viewgraphs & Supporting Documentation Encl ML20141G2901986-04-0707 April 1986 Summary of 860313 Meeting W/Mark III Containment Hydrogen Control Owners Group in Bethesda,Md Re Heat Loss Analysis. List of Attendees,Handout & Viewgraphs Encl ML20210J0261986-03-24024 March 1986 Summary of Operating Reactor Events Meeting 86-08 on 860317 to Discuss Events Occurring Since Last Meeting on 860310 ML20154P0071986-03-12012 March 1986 Summary of Operating Reactor Events 860303 Meeting 86-06 W/Ornl Re Events Occurring Since 860224 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl 1999-07-29
[Table view] |
Text
-
4 futg jo,, UNITED STATES 8 n NUCLEAR REGULATORY COMMISSION
. g y E WASHINGTO N, D. C. 20555 M 19 B8b k....+o/
MEMORANDUM T0: File FROM: Stephen Stern, Project Manager Project Directorate No. 4 Division of BWR Licensing
SUBJECT:
RECORD OF CONVERSATION: GULF STATES UTILITIES AND NRC STAFF, MAY 29, 1986, 9:30 AM The River Bend Station's Licensee, Gulf States Utilities, and the staff met to discuss licensing priorities and other matters associated with the forthcoming transition of River Bend Station (RBS) from startup test to commercial operation.
The staff reviewed the history of Licensee Event Reports (LERs) and scrams at River Bend Station since low power licensing (Attachment 1) and provided the following observations:
(1) Gulf State Utilities (GSU) has made good progress in reducing the frequency of LERs since January 1986. Furthermore, the number of LERs associated with personnel error and procedures have been significantly cut back.
(2) Based solely on the number of LERs per month since low power licensing, RBS's history of LERs is comparable to that at Limerick rather than that at Grand Gulf.
(3) The staff is concerned with the continued high frequency of scrams (about 2 per month).
The Licensee's representative stated that RBS has had fifteen scrams during startup testing compared to an average of seve waterreactors(BWRs)duringstartuptesting.geenscramsforotherboiling Furthermore, the Licensee stated GSU's corporate goal during commercial operation is one scram per quarter.
The staff requested the licensee to evaluate the scrams during their startup test, identify causative factors, and inform the staff, in about a month, what program GSU plans to put in place to limit scram frequency during commercial operation. The staff and licensee briefly discussed the recent l
symposium on reducing scram frequency held in Japan.
In addition, the following items were discussed:
The Licensee's draft submittal of the schedule for completing multi-plant and other generic actions (Attachment 2).
l 1/ Licensee stated seventeen scram average based on scrams during startup at
- single unit BWRs and at the first units at multi-unit sites.
8606250399 860610 PDR ADOCK 05000458 P PDR
Staff recommended that the Licensee reexamine their Technical Specifications in light of their operating experience and submit license amendments, where appropriate. to revise those Technical Specifications which could result in improved safety.
- As a result of a metal sliver found in a control rod drive-hydraulic control unit (CRD-HCU) check valve on May 7, 1986, the staff suggested, but did not require, that the Licensee consider flushing their CRD-HCUs at a convenient point in their power ascension cycle. Additionally, the Licensee may wish to consider chemical analysis of the sliver to determine its origin.
- While the staff does not ordinarily become involved in utility rate issues, the staff requested the Licensee to inform NRC immediately if rate or other financial pressures impact or delay expenditures on safety related improvements to RBS. The Licensee stated that rates / financial pressures would not impact safety improvements.
The staff indicated that the issue of the appropriate pressure for venting containment during an emergency is under reexamination.
The Licensee emphasized that their initial position had been to vent at containment design pressure. The staff indicated there was merit in that position and that the staff's earlier insistence at venting at higher than design pressure is being reexamined.
The Licensee and staff agreed that monthly meetings would be held to re-evaluate. priorities and other issues.
en M. rn, Project Manager Project Directorate No. 4 Division of BWR Licensing
Enclosures:
As stated cc: w/ enclosures See next page 1
l 1
Staff recommended that the Licensee reexamine their Technical Specifications in light of'their operating experience and submit license amendments, where appropriate, to revise those Technical Specifications which could result in improved safety.
As a result of a metal sliver found in a control rod drive-hydraulic control unit (CRD-HCU) check valve on May 7,1986, the staff suggested, but did not require, that the Licensee consider flushing their CRD-HCUs at a convenient point in their power ascension cycle. Additionally, the Licensee may wish to consider chemical analysis of the sliver to determine its origin.
While the staff does not ordinarily become involved in utility rate issues, the staff requested the Licensee to inform NRC immediately if rate or other financial pressures impact or delay expenditures on safety related improvements to RBS. The Licensee stated that rates / financial pressures would not impact safety improvements.
The staff indicated that the issue of the appropriate pressure for venting containment during an emergency is under reexamination.
The Licensee emphasized that their initial position had been to vent at containment design pressure. The staff indicated there was merit in that position and that the staff's earlier insistence at venting at higher than design pressure is being reexamined.
The Licensee and staff agreed that monthly meetings would be held to re-evaluate priorities and other issues.
j Onginal signed by Stephen M. Stern, Project Manager Project Directorate No. 4 Division of BWR Licensing.
Enclosures:
As stated DISTRIBUTION
{Docketfilej HDenton cc: w/ enclosures NRC^PDR WHouston See next page LPDR MVirgilio PD#4 Rdg. GHolahan RBernero EWeiss (IE)
Dewey, OELD JJaudon(RIV)
EJordan p BGrimes g JPartlow q NThompson P M PD#4/D SStern i tern ml WButler M0'Brien i 06/9/86 06/ 0/86 ACRS (10)
Mr. William J. Cahill, Jr.
Gulf States Utilities Company River Bend Nuclear Plant cc:
Troy B. Conner, Jr., Esq. Ms. Linda B. Watkins/Mr. Steven Irving Conner and Wetterhahn Attorney at Law 1747 Pennsylvania Avenue, NW 355 Napoleon Street Washington, D.C. 20006 Baton Rouge, Louisiana 70802 Mr. William J. Reed, Jr. Mr. David Zaloudek Director - Nuclear Licensing Nuclear Energy Division Gulf States Utilities Company Louisiana Department of P. O. Box 2951 Environmental Quality
- Beaumont, Texas 77704 P. O. Box 14690 Baton Rouge, Louisiana 70898 Richard M. Troy, Jr., Esq.
Assistant Attorney General in Charge Mr. J. David McNeill, III State of Louisiana Department of Justice William G. Davis, Esq.
234 Loyola Avenue Department of Justice New Orleans, Louisiana 70112 Attorney General's Office 7434 Perkins Road Resident Inspector Baton Rouge, Louisiana 70808 P. O. Box 1051 St. Francisville, Louisiana 70775 H. Anne Plettinger 3456 Villa Rose Drive Gretchen R. Rothschild Baton Rouge, Louisiana 70806 Louisianians for Safe Energy, Inc.
1659 Glenmore Avenue Baton Rouge, Louisiana 70775 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 v - - n - -,---,-- a w ,.
\
.o MEETING - GSU AND NRR MAY 29, 1986 9:30 am Name Organization Telephone No.
Stephen M. Ster, NRR/ DBL /PD4 492-9748 Jim Booker Gulf States Utilities 409-839-2181 Walt Butler NRR/ DBL /PDR 492-7538
_... _ _ _ __ , _ . . _ _ _ _ _ _ _ _ _ _ ~ _ _ . , .
LERs data from NUS-LIS, Comparison of LERs provided by Gulf States Tabulation by Month Full Power Authorization 50 -- (af ter low power lic):
River Bend - 3 mo 40 --
/
/;ii Limerick - 9 mo Grand Gulf - 26 mo 30 - ./\.',,,i/ t ,f5s LERS 20 --
.f ; r
\ ,,, \,
)
10 -
I
!lol \\ '~ /^+,
,~**' /,,s ,,, ...... . ./, ./,, ,
- O
- : :::::::.:::::::::::::::::::::::::::
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 m
a Month af ter Low Power License -
gi 4
- River Bend - Limerick ~~ Grand Gulf i
Stephen M. Stern, River Bend Project Manager, NRR/ DBL
Evaluation of LERs l Tabulation by Month LER data provided by Gulf States Utilities l
18 -- r.m 16 - -
14 - -
- 12 --
10 --
LERs
- 8-- .
i i i i i i i i Sep, Oct, Nov, Dec, Jan, Feb, f1ar, Apr, 1985 1985 1985 1985 1986 1986 1986 1966
- ED Indeterm. E Hardware O Procedural E Personnel Stephen M. Stern; River Bend Project Meneger, NRR/ DBL L_ --_ . _ _ _ _ _ . - _ _ _ _ _ _ _ _
Scrams (fp/sried Tabulation by Month Scroms with 4
mactorcnitico/
3 f
Scrams 2 11J10 1 l9l p: # a May 1986 "
1 i #'
0 : : : : :
l d to Nov, Dec, Jan, Feb, Mar, Apr, May, 5/2\/g6 1985 1985 1986 1986 1986 1986 1986 Stephen N. Stern; River Bend Project Manager, NRR/ DBL l
Enclosure 2 DRAFT FACILITY IMPLEMENTATION RIVER BEND STATION PROJECT MANAGER - STEPHEN STERN LIC ACT COMPLETION COMPLETION TAC NO..MPA # TITLE DATE COMPLETE STATUS P'rojected 11/30/87 16E Bulletin 85-03 Eypassed & Ineperabic 8/-/85 ?rojected
- Engr. Expertise on 8/-/85 Projected M60003 Shift
// / /
M59717 Fire Protection Tech Specs.
- TDI Diesel Engines 8/-/85 Projected M59724 Eucphreys Cencerns 8/-/85 Projected (Mark III issues)
- Hydregen Contrel- 11/-/85 Proj ected M59714 Degraded Core A-01 Inservice Inspection- 8/-/85 Projected 09/01/86 Progra .
A-14 Inservice Test 8/-/85 Projected 08/29/87 Program
- A-20 Inple=entation of // Projected ATWS Rule 3 48 Adequacy of Station 8/29/85 Projected 06/-/86 Elect. Distrib Volt M61029 3-76 ATWS 1.1-Post Trip 8/-/85 .Co:pleted 07/09/85 Review M61031 B-77 ATUS 2.1-Equipment 8/-/85 Completed 08/-/85 Classif & Vendor IT M61031 3-78 ATWS 3.1.1 & 3.1.2 8/-/85 Co=pleted 03/20/85 Post Maint Testing M61032 3-86 ATWS 2.2-5-R 8/-/85 Completed 05/-/86 Oc=ponents M61064 3-87 ATWS 3.2.163.2.2 8/-/85 Co=pleted 03/20/85 S-R Cc=ponents M61034 B-89 ATWS 3.2.3-Tech 8/-/S5 Co:pleted 03/20/85 Spec-5-R Co:ponents M61065 B-92 ATWS 4.5.1 Reactor 8/-/85 Co: plated 03/-/86 Trip Sys Reliability .
M61035 3-93 ATVS 4.5.254.5.3 8/-/85 Completed 05/20/85 Test Alternatives F-8 Control Roe 8/-/85 Proj ected
- Design Review M59715 F-Ba DCRD (EEDs) 8/-/85 Proj ected * .
/
M59725 F-9 Safety Parameter 8/-/85 Projected 08/-/86 l
l j
i t
L