Forwards Updated Response to Findings of Regulatory Effectiveness Review,Consisting of Changes to Original Conceptual Design & Final Design Concept.Response Withheld
ML20210D144
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 05/04/1987
From: Mcdonald R
ALABAMA POWER CO.
To: Rubenstein L
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
TAC-65285, TAC-65286, NUDOCS 8705060441
Download: ML20210D144 (1)


Text

--

y m._.;g ANm: Power Compann SAFEGUARDS INFORMATION 600 North 18th Street

- Post Offica Box 2641 Birmingham. Alabama 35291-0400 Telephone 205 250-1835 h k Sn"ioMce%,;eent Alabama Power the southem electre system Docket Nos; 50-348 50-364 May 4, 1987 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Attention

  • Mr. Lester S. Rubenstein ,

RE: Joseph M. Farley Nuclear Power Plant - Units 1 and 2 Regulatory Effectiveness Review

Dear Mr. Rubenstein:

The enclosure to this letter is Alabama Power Company's updated response to the findings of the Regulatory Effectiveness Review.. ' There have been some changes to the original conceptual design and the final design concept is presented in this revised response. Action is being taken now to implement these measures.

If you have any questions, please advise.

Respectfully submitted,-

ALABAMA 4ER C0t',PANY .

ul

. R. P. Mcdonald RPM /JGS:mab Enclosures - Copies 1, 2, 3, and 4 EMCLOSURE CONTAINS -

xc: Mr. L. B. Lon9 SAFEGUARDS INFORMATION.

Dr. J. N. Grace - Copies 5 and 6 dp0H SEPARATION Tills / .

Mr. E. A. Reeves pact is DECONTROLLEq.0 Mr. W. H. Bradford  :-

a G70506044,1 870524 W- ., . _n Putt P

suuun uo00034e PDR m 3L gU k

[ _

SAFEGUARDS2 iNi ORMAT10N

,