Submits Rept on SG Tube Plugging & Repairs IAW Requirements of TS 4.4.6.5.a.Tube Plugging & Sleeving Were Completed on 981203.No New NRC Commitments Are Contained in Ltr
ML20198B943
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/11/1998
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
98-01-00, 98-1, NUDOCS 9812210240
Download: ML20198B943 (1)


Text

in Dave M: rey -

Southern Nuctuar e

w Vice President Optratilg Company

' farley Project.

P,0. Box 1295 B.rmingham. Alabsma 35201 i

Tel205.992.5131 -

l l

l SOUTHERN h t

NN December 11,'1998 l

Energy ro Serve YourWorld" Docket No.: 50-348-U. S. Nuclear Regulatory Commission ATTN. Document Control Desk Washington, DC 20555 -

Joseph M. Farley Nuclear Plant - Unit 1 SpecialReport Number 98-01-00 Technical Specification 4.4.6.5.a Pingged Or Renaired Steam Generator Tubes Ladies and Gentlemen:

In accordance with the requirements of Technical Specification 4.4.6.5.a, Farley Nuclear Plant is required to report steam generator (SG) tube plugging and repairs for the Unit 1 15* Refueling Outage within 15 days of the completion of the plugging and repair effort.

Tube plugging and sleeving were completed on December 3,1998, and are reported as follows:

ACTION SG A SG B SG C Tubes Removed from Service by Plugging 62 76 122 Tubes with Sleeves Installed and Left In Service 99 90 109 I

There are no new NRC commitments associated with this special report.

If you have any questions, please advise.

Respectfully submitted, j

i (777 b2Wt l

'd l

Dave Morey i

l i

DRC/ cit:sg-sp-rp. doc cc: Mr. L. A. Reyes, Region II Administrator o\\

Mr. J. I. Zimmerman, NRR Project Manager

[

Mr. T. P. Johnson, Plant Senior Resident Inspector l

9812210 N 981211 R PDR ADOCK 05000348 i

P PD43

.