Category:CORRESPONDENCE-LETTERS
MONTHYEARML20072U2211991-04-12012 April 1991 Forwards Response to NRC 901221 Request for Addl Info Re Ssar for Design Certification (CESSAR-DC) LD-91-014, Forwards Response to NRC Request for Addl Info Re Design Certification,CESSAR-DC,per1991-03-26026 March 1991 Forwards Response to NRC Request for Addl Info Re Design Certification,CESSAR-DC,per ML20029C1001991-03-15015 March 1991 Forwards Response to NRC 890626 Request for Addl Info Re C-E Std SAR - Design Certification (CESSAR-DC),including Revs to CESSAR-DC ML20029C0141991-03-15015 March 1991 Forwards Response to NRC 890119 Request for Addl Info to Enable NRC to Continue Review of Cessar - Design Certification (CESSAR-DC) LD-91-010, Responds to NRC 881223 Request for Addl Info Re CESSAR-DC. Forwards Proposed Revisions to CESSAR-DC1991-03-0404 March 1991 Responds to NRC 881223 Request for Addl Info Re CESSAR-DC. Forwards Proposed Revisions to CESSAR-DC ML20029B6491991-03-0404 March 1991 Forwards Amend 1 to Cessar - Design Certification (CESSAR-DC). LD-91-006, Forwards Summary of Amend I to Std SAR for Design Certification,For Info & Planning Purposes1991-01-30030 January 1991 Forwards Summary of Amend I to Std SAR for Design Certification,For Info & Planning Purposes LD-90-097, Forwards Response to 901106 Request for Discussion of Differences Between Certain Provisions of EPRI Advanced LWR Util Requirements Document & Sys 80+ Std Design1990-12-21021 December 1990 Forwards Response to 901106 Request for Discussion of Differences Between Certain Provisions of EPRI Advanced LWR Util Requirements Document & Sys 80+ Std Design LD-90-075, Forwards Amend H to CESSAR - Design Certification1990-10-0303 October 1990 Forwards Amend H to CESSAR - Design Certification LD-90-060, Forwards Proposed Changes to Sys 80+ Licensing Review Basis Document,Per1990-08-28028 August 1990 Forwards Proposed Changes to Sys 80+ Licensing Review Basis Document,Per LD-90-046, Forwards Addl Copies of Amend G to CESSAR-DC1990-07-12012 July 1990 Forwards Addl Copies of Amend G to CESSAR-DC ML20044A5531990-06-18018 June 1990 Advises That Licensee Will Submit Application for Final Design Approval & Design Certification of Process Inherent Ultimate Safety Reactor in FY92 & That Safe Integral Reactor Anticipated in FY93,in Addition to Sys 80+ Under Review ML20042E9001990-04-30030 April 1990 Forwards Amend G to CESSAR-design Certification,Per Draft Licensing Review Basis Document ML20011E2041990-01-25025 January 1990 Forwards Response to 881216 Request for Addl Info Re CESSAR-DC,Chapters 3,4,5 & 6 Re Turbine Missiles,Control Element Drive Structural Matls,Cleaning & Contamination Protection Procedures & Reactor Internals Matls ML20006A7201990-01-0505 January 1990 Requests That Consolidated Financial Statements Submitted to NRC by 891121 Ltr Re Indirect Transfer of C-E Licenses Be Treated as Confidential,Per 10CFR2.790.Supporting Affidavit Encl ML20011D5151989-12-22022 December 1989 Forwards Amend F to C-E Std SAR - Design Certification (CESSAR-DC). ML19324B6811989-10-30030 October 1989 Forwards Response to Request for Addl Info Re C-E QA Program & CESSAR-DC,Chapter 17,proposed Rev to CESSAR-DC & Rev 5 to CENPD-210, QA Program:Description of Nuclear Power Businesses QA Program. LD-89-107, Forwards Addl Info Re CESSAR-DC Chapter 71989-09-28028 September 1989 Forwards Addl Info Re CESSAR-DC Chapter 7 LD-89-092, Forwards Slides from 890616 Meeting Re CESSAR-DC Baseline PRA for Sys 80+ Std Design Described in SAR on Design Certification1989-08-17017 August 1989 Forwards Slides from 890616 Meeting Re CESSAR-DC Baseline PRA for Sys 80+ Std Design Described in SAR on Design Certification LD-89-091, Forwards Responses to 881020 Request for Addl Info Re CESSAR-DC,Chapter 10, Emergency Feedwater Sys1989-08-16016 August 1989 Forwards Responses to 881020 Request for Addl Info Re CESSAR-DC,Chapter 10, Emergency Feedwater Sys ML20246A2261989-04-28028 April 1989 Forwards Sser Re Steam Generator Tube Vibration for CESSAR Sys 80 Design.Concurs W/Licensee That Adequate Steam Generator Tube Integrity Can Be Assured at Each Plant Through Appropriate Program of Preventive Tube Plugging LD-89-035, Forwards Vols 1-17,consisting of Chapters 1-18,to CESSAR Design Certification, for Approval,Per 10CFR521989-03-30030 March 1989 Forwards Vols 1-17,consisting of Chapters 1-18,to CESSAR Design Certification, for Approval,Per 10CFR52 LD-89-033, Forwards Design Certification Licensing Review Basis, for Review & Concurrence1989-03-30030 March 1989 Forwards Design Certification Licensing Review Basis, for Review & Concurrence LD-89-029, Forwards Vol Viii to DOE/ID-10216, Mods for Development of MAAP-DOE Code:Vol Viii:Resolution of Outstanding Nuclear Fission Product Aerosol Transport & Deposition Issues Wbs 3.4.2, Per 881011 Request1989-03-17017 March 1989 Forwards Vol Viii to DOE/ID-10216, Mods for Development of MAAP-DOE Code:Vol Viii:Resolution of Outstanding Nuclear Fission Product Aerosol Transport & Deposition Issues Wbs 3.4.2, Per 881011 Request LD-89-028, Forwards Amend E to C-E Std SAR Group E2 Re Design Certification.Summary of Revs Also Encl1989-03-15015 March 1989 Forwards Amend E to C-E Std SAR Group E2 Re Design Certification.Summary of Revs Also Encl LD-88-132, Forwards Advanced Reactor Severe Accident Program Topic Paper Set 6, Development of Severe Accident Mgt Program, for Review1988-11-11011 November 1988 Forwards Advanced Reactor Severe Accident Program Topic Paper Set 6, Development of Severe Accident Mgt Program, for Review LD-88-128, Forwards QA Program in Response to NRC Request for Addl Info Re Chapter 17,CESSAR-DC QA1988-11-0404 November 1988 Forwards QA Program in Response to NRC Request for Addl Info Re Chapter 17,CESSAR-DC QA ML20195D2251988-11-0101 November 1988 Forwards Request for Addl Info Re Amend C of Chapters 5,6 & 10 of CESSAR-DC,Sys 80+.Info Requested within 90 Days of Ltr Receipt ML20205N4851988-10-28028 October 1988 Forwards Request for Addl Info Re Chapter 5,Amend C to CESSAR-DC,Sys 80+ on Steam Generators.Info Needed by 881230 ML20195B9011988-10-26026 October 1988 Forwards Request for Addl Info Re 880930 Submittal of Amend D to Chapters 4,5,6 & 10 of CESSAR-DC,Sys 80+.Info Requested within 90 Days from Receipt of Ltr LD-88-119, Responds to NRC Request for Addl Info on Chapter 17 of CESSAR-DC.NRC Question 260.2 Incorporated in CENPD-210,Rev 5 as Part of Sections III.1,III.3 & Table III-11988-10-21021 October 1988 Responds to NRC Request for Addl Info on Chapter 17 of CESSAR-DC.NRC Question 260.2 Incorporated in CENPD-210,Rev 5 as Part of Sections III.1,III.3 & Table III-1 LD-88-106, Forwards Amend D to CESSAR Fsar,Including Revs to Chapters 2-7 & 18.Technical Review Should Be Allowed to Proceed Unencumbered Pending Settlement of Dispute Re Fees1988-09-30030 September 1988 Forwards Amend D to CESSAR Fsar,Including Revs to Chapters 2-7 & 18.Technical Review Should Be Allowed to Proceed Unencumbered Pending Settlement of Dispute Re Fees LD-88-099, Responds to NRC Request for Addl Info Re Chapters 5 & 9 of CESSAR-DC Re Steam Generator Secondary Water Chemistry, Reactor Coolant Water Chemistry,Fire Protection Sys,Letdown Purification Line & Hydrogen Ignition1988-09-20020 September 1988 Responds to NRC Request for Addl Info Re Chapters 5 & 9 of CESSAR-DC Re Steam Generator Secondary Water Chemistry, Reactor Coolant Water Chemistry,Fire Protection Sys,Letdown Purification Line & Hydrogen Ignition LD-88-091, Forwards Summary of Sabotage Protection Considerations & Draft Requirements for Sabotage Design from EPRI Advanced LWR Requirements Document,Per NRC .Basis for Program Listed1988-09-14014 September 1988 Forwards Summary of Sabotage Protection Considerations & Draft Requirements for Sabotage Design from EPRI Advanced LWR Requirements Document,Per NRC .Basis for Program Listed ML20154K0031988-09-12012 September 1988 Responds to Comments & Questions Re Regulatory Trends in Us & Republic of Korea.C-E Will Pursue Design Certification & Will Revise Sys 80 Std Design to Meet Requirements of NRC Severe Accident & Standardization Policy Statements ML20154K0211988-09-12012 September 1988 Submits Questions from South Korean Engineers Re Value of Design Certification Program for C-E Sys 80 & Sys 80 Plus Designs LD-88-089, Forwards Addl Info Re CESSAR-DC,Chapter 4,in Response to NRC 880628 Request1988-09-0909 September 1988 Forwards Addl Info Re CESSAR-DC,Chapter 4,in Response to NRC 880628 Request LD-88-088, Provides Proposed Resolution for Single Issue of Advanced Reactor Severe Accident Program Topic Paper Set 4, Essential Equipment Performance1988-09-0909 September 1988 Provides Proposed Resolution for Single Issue of Advanced Reactor Severe Accident Program Topic Paper Set 4, Essential Equipment Performance ML20151N3441988-08-0303 August 1988 Forwards Request for Addl Info Re Chapter 9, Auxiliary Sys, & Chapter 5, RCS, CESSAR-DC,Sys 80+ in Order to Continue Review of Amend B ML20151R0281988-08-0202 August 1988 Discusses QA for CESSAR-DC,Sys 80+ & Significant Points Made Listed ML20151Q8581988-08-0202 August 1988 Informs That Vendor Finalizing Review & Anticipates That Rev 5 to CENPD-210 Will Be Transmitted by Sept 1988.Road Map Will Also Be Submitted to Identify Remaining QA Questions LD-88-069, Informs of Finalizing Review of QA Program Description of Rev 5 to CESSAR Topical Rept CENPD-210 & Anticipates Transmitting Review to NRC by Third Quarter 1988.Submittal Will Address Remaining QA Questions in Road Map1988-08-0202 August 1988 Informs of Finalizing Review of QA Program Description of Rev 5 to CESSAR Topical Rept CENPD-210 & Anticipates Transmitting Review to NRC by Third Quarter 1988.Submittal Will Address Remaining QA Questions in Road Map LD-88-068, Forwards Response to Request for Addl Info Re CESSAR-DC Chapters 1 & 5 Re Sabotage Protection,Per1988-08-0101 August 1988 Forwards Response to Request for Addl Info Re CESSAR-DC Chapters 1 & 5 Re Sabotage Protection,Per LD-88-066, Forwards DOE Advanced Reactor Severe Accident Program Proposed Resolutions for Severe Accident Issues,Topic Set 3. Resolutions to Listed Items Will Be Adopted in Development of Sys 80+ Std Design1988-07-29029 July 1988 Forwards DOE Advanced Reactor Severe Accident Program Proposed Resolutions for Severe Accident Issues,Topic Set 3. Resolutions to Listed Items Will Be Adopted in Development of Sys 80+ Std Design LD-88-055, Forwards Revised Design Certification Licensing Review Bases1988-07-15015 July 1988 Forwards Revised Design Certification Licensing Review Bases ML20150E7261988-07-0101 July 1988 Forwards Flow Distribution & Tube Vibration:Evaluation of Sys 80 Steam Generator Tube Lane/Economizer Corner Region, in Support of C-E 870918 Request That Steam Generator Tube Vibration Issue Be Closed LD-88-047, Forwards Amend C to CESSAR-DC (Design Certification), Chapters 5,6 & 10.Summary of Significance of Revs Also Encl1988-06-30030 June 1988 Forwards Amend C to CESSAR-DC (Design Certification), Chapters 5,6 & 10.Summary of Significance of Revs Also Encl LD-88-046, Forwards Response to NRC 880315 Request for Addl Info Re CESSAR-DC,Chapter 10, Plant Sys Branch1988-06-30030 June 1988 Forwards Response to NRC 880315 Request for Addl Info Re CESSAR-DC,Chapter 10, Plant Sys Branch ML20153B1411988-06-28028 June 1988 Requests Addl Info Re Amend B of Chapters 5 & 9 of CESSAR-DC,Sys 80+ for Review Completion ML20153B1281988-06-28028 June 1988 Forwards Request for Addl Info Re Amend B of Chapters 4 & 5 of CESSAR-DC,Sys 80+,transmitted by .Receipt of Info within 90 Days of Ltr Date Requested 1991-04-12
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20072U2211991-04-12012 April 1991 Forwards Response to NRC 901221 Request for Addl Info Re Ssar for Design Certification (CESSAR-DC) LD-91-014, Forwards Response to NRC Request for Addl Info Re Design Certification,CESSAR-DC,per1991-03-26026 March 1991 Forwards Response to NRC Request for Addl Info Re Design Certification,CESSAR-DC,per ML20029C1001991-03-15015 March 1991 Forwards Response to NRC 890626 Request for Addl Info Re C-E Std SAR - Design Certification (CESSAR-DC),including Revs to CESSAR-DC ML20029C0141991-03-15015 March 1991 Forwards Response to NRC 890119 Request for Addl Info to Enable NRC to Continue Review of Cessar - Design Certification (CESSAR-DC) LD-91-010, Responds to NRC 881223 Request for Addl Info Re CESSAR-DC. Forwards Proposed Revisions to CESSAR-DC1991-03-0404 March 1991 Responds to NRC 881223 Request for Addl Info Re CESSAR-DC. Forwards Proposed Revisions to CESSAR-DC ML20029B6491991-03-0404 March 1991 Forwards Amend 1 to Cessar - Design Certification (CESSAR-DC). LD-91-006, Forwards Summary of Amend I to Std SAR for Design Certification,For Info & Planning Purposes1991-01-30030 January 1991 Forwards Summary of Amend I to Std SAR for Design Certification,For Info & Planning Purposes LD-90-097, Forwards Response to 901106 Request for Discussion of Differences Between Certain Provisions of EPRI Advanced LWR Util Requirements Document & Sys 80+ Std Design1990-12-21021 December 1990 Forwards Response to 901106 Request for Discussion of Differences Between Certain Provisions of EPRI Advanced LWR Util Requirements Document & Sys 80+ Std Design LD-90-075, Forwards Amend H to CESSAR - Design Certification1990-10-0303 October 1990 Forwards Amend H to CESSAR - Design Certification LD-90-060, Forwards Proposed Changes to Sys 80+ Licensing Review Basis Document,Per1990-08-28028 August 1990 Forwards Proposed Changes to Sys 80+ Licensing Review Basis Document,Per LD-90-046, Forwards Addl Copies of Amend G to CESSAR-DC1990-07-12012 July 1990 Forwards Addl Copies of Amend G to CESSAR-DC ML20044A5531990-06-18018 June 1990 Advises That Licensee Will Submit Application for Final Design Approval & Design Certification of Process Inherent Ultimate Safety Reactor in FY92 & That Safe Integral Reactor Anticipated in FY93,in Addition to Sys 80+ Under Review ML20042E9001990-04-30030 April 1990 Forwards Amend G to CESSAR-design Certification,Per Draft Licensing Review Basis Document ML20011E2041990-01-25025 January 1990 Forwards Response to 881216 Request for Addl Info Re CESSAR-DC,Chapters 3,4,5 & 6 Re Turbine Missiles,Control Element Drive Structural Matls,Cleaning & Contamination Protection Procedures & Reactor Internals Matls ML20006A7201990-01-0505 January 1990 Requests That Consolidated Financial Statements Submitted to NRC by 891121 Ltr Re Indirect Transfer of C-E Licenses Be Treated as Confidential,Per 10CFR2.790.Supporting Affidavit Encl ML20011D5151989-12-22022 December 1989 Forwards Amend F to C-E Std SAR - Design Certification (CESSAR-DC). ML19324B6811989-10-30030 October 1989 Forwards Response to Request for Addl Info Re C-E QA Program & CESSAR-DC,Chapter 17,proposed Rev to CESSAR-DC & Rev 5 to CENPD-210, QA Program:Description of Nuclear Power Businesses QA Program. LD-89-107, Forwards Addl Info Re CESSAR-DC Chapter 71989-09-28028 September 1989 Forwards Addl Info Re CESSAR-DC Chapter 7 LD-89-092, Forwards Slides from 890616 Meeting Re CESSAR-DC Baseline PRA for Sys 80+ Std Design Described in SAR on Design Certification1989-08-17017 August 1989 Forwards Slides from 890616 Meeting Re CESSAR-DC Baseline PRA for Sys 80+ Std Design Described in SAR on Design Certification LD-89-091, Forwards Responses to 881020 Request for Addl Info Re CESSAR-DC,Chapter 10, Emergency Feedwater Sys1989-08-16016 August 1989 Forwards Responses to 881020 Request for Addl Info Re CESSAR-DC,Chapter 10, Emergency Feedwater Sys LD-89-033, Forwards Design Certification Licensing Review Basis, for Review & Concurrence1989-03-30030 March 1989 Forwards Design Certification Licensing Review Basis, for Review & Concurrence LD-89-035, Forwards Vols 1-17,consisting of Chapters 1-18,to CESSAR Design Certification, for Approval,Per 10CFR521989-03-30030 March 1989 Forwards Vols 1-17,consisting of Chapters 1-18,to CESSAR Design Certification, for Approval,Per 10CFR52 LD-89-029, Forwards Vol Viii to DOE/ID-10216, Mods for Development of MAAP-DOE Code:Vol Viii:Resolution of Outstanding Nuclear Fission Product Aerosol Transport & Deposition Issues Wbs 3.4.2, Per 881011 Request1989-03-17017 March 1989 Forwards Vol Viii to DOE/ID-10216, Mods for Development of MAAP-DOE Code:Vol Viii:Resolution of Outstanding Nuclear Fission Product Aerosol Transport & Deposition Issues Wbs 3.4.2, Per 881011 Request LD-89-028, Forwards Amend E to C-E Std SAR Group E2 Re Design Certification.Summary of Revs Also Encl1989-03-15015 March 1989 Forwards Amend E to C-E Std SAR Group E2 Re Design Certification.Summary of Revs Also Encl LD-88-132, Forwards Advanced Reactor Severe Accident Program Topic Paper Set 6, Development of Severe Accident Mgt Program, for Review1988-11-11011 November 1988 Forwards Advanced Reactor Severe Accident Program Topic Paper Set 6, Development of Severe Accident Mgt Program, for Review LD-88-128, Forwards QA Program in Response to NRC Request for Addl Info Re Chapter 17,CESSAR-DC QA1988-11-0404 November 1988 Forwards QA Program in Response to NRC Request for Addl Info Re Chapter 17,CESSAR-DC QA LD-88-119, Responds to NRC Request for Addl Info on Chapter 17 of CESSAR-DC.NRC Question 260.2 Incorporated in CENPD-210,Rev 5 as Part of Sections III.1,III.3 & Table III-11988-10-21021 October 1988 Responds to NRC Request for Addl Info on Chapter 17 of CESSAR-DC.NRC Question 260.2 Incorporated in CENPD-210,Rev 5 as Part of Sections III.1,III.3 & Table III-1 LD-88-106, Forwards Amend D to CESSAR Fsar,Including Revs to Chapters 2-7 & 18.Technical Review Should Be Allowed to Proceed Unencumbered Pending Settlement of Dispute Re Fees1988-09-30030 September 1988 Forwards Amend D to CESSAR Fsar,Including Revs to Chapters 2-7 & 18.Technical Review Should Be Allowed to Proceed Unencumbered Pending Settlement of Dispute Re Fees LD-88-099, Responds to NRC Request for Addl Info Re Chapters 5 & 9 of CESSAR-DC Re Steam Generator Secondary Water Chemistry, Reactor Coolant Water Chemistry,Fire Protection Sys,Letdown Purification Line & Hydrogen Ignition1988-09-20020 September 1988 Responds to NRC Request for Addl Info Re Chapters 5 & 9 of CESSAR-DC Re Steam Generator Secondary Water Chemistry, Reactor Coolant Water Chemistry,Fire Protection Sys,Letdown Purification Line & Hydrogen Ignition LD-88-091, Forwards Summary of Sabotage Protection Considerations & Draft Requirements for Sabotage Design from EPRI Advanced LWR Requirements Document,Per NRC .Basis for Program Listed1988-09-14014 September 1988 Forwards Summary of Sabotage Protection Considerations & Draft Requirements for Sabotage Design from EPRI Advanced LWR Requirements Document,Per NRC .Basis for Program Listed ML20154K0211988-09-12012 September 1988 Submits Questions from South Korean Engineers Re Value of Design Certification Program for C-E Sys 80 & Sys 80 Plus Designs LD-88-089, Forwards Addl Info Re CESSAR-DC,Chapter 4,in Response to NRC 880628 Request1988-09-0909 September 1988 Forwards Addl Info Re CESSAR-DC,Chapter 4,in Response to NRC 880628 Request LD-88-088, Provides Proposed Resolution for Single Issue of Advanced Reactor Severe Accident Program Topic Paper Set 4, Essential Equipment Performance1988-09-0909 September 1988 Provides Proposed Resolution for Single Issue of Advanced Reactor Severe Accident Program Topic Paper Set 4, Essential Equipment Performance ML20151Q8581988-08-0202 August 1988 Informs That Vendor Finalizing Review & Anticipates That Rev 5 to CENPD-210 Will Be Transmitted by Sept 1988.Road Map Will Also Be Submitted to Identify Remaining QA Questions LD-88-069, Informs of Finalizing Review of QA Program Description of Rev 5 to CESSAR Topical Rept CENPD-210 & Anticipates Transmitting Review to NRC by Third Quarter 1988.Submittal Will Address Remaining QA Questions in Road Map1988-08-0202 August 1988 Informs of Finalizing Review of QA Program Description of Rev 5 to CESSAR Topical Rept CENPD-210 & Anticipates Transmitting Review to NRC by Third Quarter 1988.Submittal Will Address Remaining QA Questions in Road Map LD-88-068, Forwards Response to Request for Addl Info Re CESSAR-DC Chapters 1 & 5 Re Sabotage Protection,Per1988-08-0101 August 1988 Forwards Response to Request for Addl Info Re CESSAR-DC Chapters 1 & 5 Re Sabotage Protection,Per LD-88-066, Forwards DOE Advanced Reactor Severe Accident Program Proposed Resolutions for Severe Accident Issues,Topic Set 3. Resolutions to Listed Items Will Be Adopted in Development of Sys 80+ Std Design1988-07-29029 July 1988 Forwards DOE Advanced Reactor Severe Accident Program Proposed Resolutions for Severe Accident Issues,Topic Set 3. Resolutions to Listed Items Will Be Adopted in Development of Sys 80+ Std Design LD-88-055, Forwards Revised Design Certification Licensing Review Bases1988-07-15015 July 1988 Forwards Revised Design Certification Licensing Review Bases ML20150E7261988-07-0101 July 1988 Forwards Flow Distribution & Tube Vibration:Evaluation of Sys 80 Steam Generator Tube Lane/Economizer Corner Region, in Support of C-E 870918 Request That Steam Generator Tube Vibration Issue Be Closed LD-88-047, Forwards Amend C to CESSAR-DC (Design Certification), Chapters 5,6 & 10.Summary of Significance of Revs Also Encl1988-06-30030 June 1988 Forwards Amend C to CESSAR-DC (Design Certification), Chapters 5,6 & 10.Summary of Significance of Revs Also Encl LD-88-046, Forwards Response to NRC 880315 Request for Addl Info Re CESSAR-DC,Chapter 10, Plant Sys Branch1988-06-30030 June 1988 Forwards Response to NRC 880315 Request for Addl Info Re CESSAR-DC,Chapter 10, Plant Sys Branch LD-88-042, Provides Proposed Resolutions to Remaining Two Issues Committed to in Re Direct Containment Heating (Idcor Issue 8) & Debris Coolability (Idcor Issue 10).C-E Plans to Adopt 14 Resolutions Previously Submitted1988-06-17017 June 1988 Provides Proposed Resolutions to Remaining Two Issues Committed to in Re Direct Containment Heating (Idcor Issue 8) & Debris Coolability (Idcor Issue 10).C-E Plans to Adopt 14 Resolutions Previously Submitted LD-88-039, Forwards Addl Info Re Chapters 1 & 10 to CESSAR-DC,per NRC 880311 Request1988-06-0606 June 1988 Forwards Addl Info Re Chapters 1 & 10 to CESSAR-DC,per NRC 880311 Request LD-88-038, Provides Proposed Resolutions for Four of Six Issues Which Make Up Topic Paper Set 2,including in-vessel Hydrogen Generation,Core Melt Progression & Vessel Failure & Hydrogen Ignition & Burning.Remaining Issues Submitted in 30 Days1988-06-0606 June 1988 Provides Proposed Resolutions for Four of Six Issues Which Make Up Topic Paper Set 2,including in-vessel Hydrogen Generation,Core Melt Progression & Vessel Failure & Hydrogen Ignition & Burning.Remaining Issues Submitted in 30 Days LD-88-034, Provides Addl Info on CESSAR-DC Chapter 10 Re Secondary Water Chemistry,Per NRC 880225 request.CESSAR-DC Section 10.3.5.1 Revised to Make Clear That C-E Secondary Water Chemistry Program Includes Immediate Shutdown Limits1988-05-25025 May 1988 Provides Addl Info on CESSAR-DC Chapter 10 Re Secondary Water Chemistry,Per NRC 880225 request.CESSAR-DC Section 10.3.5.1 Revised to Make Clear That C-E Secondary Water Chemistry Program Includes Immediate Shutdown Limits LD-88-033, Forwards Response to NRC 880226 Request for Addl Info on Chapter 17 to Rev 4 to Topical Rept CENPD-210A, QA Program, Including Revs to C-E 871130 & 880411 Responses1988-05-25025 May 1988 Forwards Response to NRC 880226 Request for Addl Info on Chapter 17 to Rev 4 to Topical Rept CENPD-210A, QA Program, Including Revs to C-E 871130 & 880411 Responses LD-88-026, Forwards Draft Revs to C-E Chapters 1,4,5 & 9 to C-E Std Sar.Meeting to Resolve Issues Re Schedule & Composition of Submittals as Part of Draft Licensing Review Bases & Related Issues,Requested1988-04-11011 April 1988 Forwards Draft Revs to C-E Chapters 1,4,5 & 9 to C-E Std Sar.Meeting to Resolve Issues Re Schedule & Composition of Submittals as Part of Draft Licensing Review Bases & Related Issues,Requested LD-88-021, Forwards Response to NRC 871208 Request for Addl Info Re Reg Guides That Appear in CESSAR-DC,QA.Suggest That Meeting W/Nrc Staff Be Scheduled to Allow Overview Program Changes1988-03-22022 March 1988 Forwards Response to NRC 871208 Request for Addl Info Re Reg Guides That Appear in CESSAR-DC,QA.Suggest That Meeting W/Nrc Staff Be Scheduled to Allow Overview Program Changes LD-88-019, Forwards Addl Info Re Chemical & Vol Control Sys for Sys 80+TM Std Design,Per 871217 Request.Proposed Rev to C-E Std SAR, Design Certification Also Encl1988-03-18018 March 1988 Forwards Addl Info Re Chemical & Vol Control Sys for Sys 80+TM Std Design,Per 871217 Request.Proposed Rev to C-E Std SAR, Design Certification Also Encl LD-88-020, Responds to NRC Request for Addl Info Re Chapter 1 Concerning Safeguards.Proposed Revision to C-E Engineering Std SAR & Responses to Specific Questions Also Encl1988-03-18018 March 1988 Responds to NRC Request for Addl Info Re Chapter 1 Concerning Safeguards.Proposed Revision to C-E Engineering Std SAR & Responses to Specific Questions Also Encl 1991-04-12
[Table view] Category:VENDOR/MANUFACTURER TO NRC
MONTHYEARLD-90-075, Forwards Amend H to CESSAR - Design Certification1990-10-0303 October 1990 Forwards Amend H to CESSAR - Design Certification LD-90-060, Forwards Proposed Changes to Sys 80+ Licensing Review Basis Document,Per1990-08-28028 August 1990 Forwards Proposed Changes to Sys 80+ Licensing Review Basis Document,Per LD-90-046, Forwards Addl Copies of Amend G to CESSAR-DC1990-07-12012 July 1990 Forwards Addl Copies of Amend G to CESSAR-DC ML20044A5531990-06-18018 June 1990 Advises That Licensee Will Submit Application for Final Design Approval & Design Certification of Process Inherent Ultimate Safety Reactor in FY92 & That Safe Integral Reactor Anticipated in FY93,in Addition to Sys 80+ Under Review ML20042E9001990-04-30030 April 1990 Forwards Amend G to CESSAR-design Certification,Per Draft Licensing Review Basis Document ML20006A7201990-01-0505 January 1990 Requests That Consolidated Financial Statements Submitted to NRC by 891121 Ltr Re Indirect Transfer of C-E Licenses Be Treated as Confidential,Per 10CFR2.790.Supporting Affidavit Encl ML20011D5151989-12-22022 December 1989 Forwards Amend F to C-E Std SAR - Design Certification (CESSAR-DC). ML19324B6811989-10-30030 October 1989 Forwards Response to Request for Addl Info Re C-E QA Program & CESSAR-DC,Chapter 17,proposed Rev to CESSAR-DC & Rev 5 to CENPD-210, QA Program:Description of Nuclear Power Businesses QA Program. LD-89-107, Forwards Addl Info Re CESSAR-DC Chapter 71989-09-28028 September 1989 Forwards Addl Info Re CESSAR-DC Chapter 7 LD-89-092, Forwards Slides from 890616 Meeting Re CESSAR-DC Baseline PRA for Sys 80+ Std Design Described in SAR on Design Certification1989-08-17017 August 1989 Forwards Slides from 890616 Meeting Re CESSAR-DC Baseline PRA for Sys 80+ Std Design Described in SAR on Design Certification LD-89-091, Forwards Responses to 881020 Request for Addl Info Re CESSAR-DC,Chapter 10, Emergency Feedwater Sys1989-08-16016 August 1989 Forwards Responses to 881020 Request for Addl Info Re CESSAR-DC,Chapter 10, Emergency Feedwater Sys LD-89-035, Forwards Vols 1-17,consisting of Chapters 1-18,to CESSAR Design Certification, for Approval,Per 10CFR521989-03-30030 March 1989 Forwards Vols 1-17,consisting of Chapters 1-18,to CESSAR Design Certification, for Approval,Per 10CFR52 LD-89-033, Forwards Design Certification Licensing Review Basis, for Review & Concurrence1989-03-30030 March 1989 Forwards Design Certification Licensing Review Basis, for Review & Concurrence LD-89-029, Forwards Vol Viii to DOE/ID-10216, Mods for Development of MAAP-DOE Code:Vol Viii:Resolution of Outstanding Nuclear Fission Product Aerosol Transport & Deposition Issues Wbs 3.4.2, Per 881011 Request1989-03-17017 March 1989 Forwards Vol Viii to DOE/ID-10216, Mods for Development of MAAP-DOE Code:Vol Viii:Resolution of Outstanding Nuclear Fission Product Aerosol Transport & Deposition Issues Wbs 3.4.2, Per 881011 Request LD-89-028, Forwards Amend E to C-E Std SAR Group E2 Re Design Certification.Summary of Revs Also Encl1989-03-15015 March 1989 Forwards Amend E to C-E Std SAR Group E2 Re Design Certification.Summary of Revs Also Encl LD-88-132, Forwards Advanced Reactor Severe Accident Program Topic Paper Set 6, Development of Severe Accident Mgt Program, for Review1988-11-11011 November 1988 Forwards Advanced Reactor Severe Accident Program Topic Paper Set 6, Development of Severe Accident Mgt Program, for Review LD-88-128, Forwards QA Program in Response to NRC Request for Addl Info Re Chapter 17,CESSAR-DC QA1988-11-0404 November 1988 Forwards QA Program in Response to NRC Request for Addl Info Re Chapter 17,CESSAR-DC QA LD-88-119, Responds to NRC Request for Addl Info on Chapter 17 of CESSAR-DC.NRC Question 260.2 Incorporated in CENPD-210,Rev 5 as Part of Sections III.1,III.3 & Table III-11988-10-21021 October 1988 Responds to NRC Request for Addl Info on Chapter 17 of CESSAR-DC.NRC Question 260.2 Incorporated in CENPD-210,Rev 5 as Part of Sections III.1,III.3 & Table III-1 LD-88-106, Forwards Amend D to CESSAR Fsar,Including Revs to Chapters 2-7 & 18.Technical Review Should Be Allowed to Proceed Unencumbered Pending Settlement of Dispute Re Fees1988-09-30030 September 1988 Forwards Amend D to CESSAR Fsar,Including Revs to Chapters 2-7 & 18.Technical Review Should Be Allowed to Proceed Unencumbered Pending Settlement of Dispute Re Fees LD-88-099, Responds to NRC Request for Addl Info Re Chapters 5 & 9 of CESSAR-DC Re Steam Generator Secondary Water Chemistry, Reactor Coolant Water Chemistry,Fire Protection Sys,Letdown Purification Line & Hydrogen Ignition1988-09-20020 September 1988 Responds to NRC Request for Addl Info Re Chapters 5 & 9 of CESSAR-DC Re Steam Generator Secondary Water Chemistry, Reactor Coolant Water Chemistry,Fire Protection Sys,Letdown Purification Line & Hydrogen Ignition LD-88-091, Forwards Summary of Sabotage Protection Considerations & Draft Requirements for Sabotage Design from EPRI Advanced LWR Requirements Document,Per NRC .Basis for Program Listed1988-09-14014 September 1988 Forwards Summary of Sabotage Protection Considerations & Draft Requirements for Sabotage Design from EPRI Advanced LWR Requirements Document,Per NRC .Basis for Program Listed LD-88-089, Forwards Addl Info Re CESSAR-DC,Chapter 4,in Response to NRC 880628 Request1988-09-0909 September 1988 Forwards Addl Info Re CESSAR-DC,Chapter 4,in Response to NRC 880628 Request LD-88-088, Provides Proposed Resolution for Single Issue of Advanced Reactor Severe Accident Program Topic Paper Set 4, Essential Equipment Performance1988-09-0909 September 1988 Provides Proposed Resolution for Single Issue of Advanced Reactor Severe Accident Program Topic Paper Set 4, Essential Equipment Performance ML20151Q8581988-08-0202 August 1988 Informs That Vendor Finalizing Review & Anticipates That Rev 5 to CENPD-210 Will Be Transmitted by Sept 1988.Road Map Will Also Be Submitted to Identify Remaining QA Questions LD-88-069, Informs of Finalizing Review of QA Program Description of Rev 5 to CESSAR Topical Rept CENPD-210 & Anticipates Transmitting Review to NRC by Third Quarter 1988.Submittal Will Address Remaining QA Questions in Road Map1988-08-0202 August 1988 Informs of Finalizing Review of QA Program Description of Rev 5 to CESSAR Topical Rept CENPD-210 & Anticipates Transmitting Review to NRC by Third Quarter 1988.Submittal Will Address Remaining QA Questions in Road Map LD-88-068, Forwards Response to Request for Addl Info Re CESSAR-DC Chapters 1 & 5 Re Sabotage Protection,Per1988-08-0101 August 1988 Forwards Response to Request for Addl Info Re CESSAR-DC Chapters 1 & 5 Re Sabotage Protection,Per LD-88-066, Forwards DOE Advanced Reactor Severe Accident Program Proposed Resolutions for Severe Accident Issues,Topic Set 3. Resolutions to Listed Items Will Be Adopted in Development of Sys 80+ Std Design1988-07-29029 July 1988 Forwards DOE Advanced Reactor Severe Accident Program Proposed Resolutions for Severe Accident Issues,Topic Set 3. Resolutions to Listed Items Will Be Adopted in Development of Sys 80+ Std Design ML20150E7261988-07-0101 July 1988 Forwards Flow Distribution & Tube Vibration:Evaluation of Sys 80 Steam Generator Tube Lane/Economizer Corner Region, in Support of C-E 870918 Request That Steam Generator Tube Vibration Issue Be Closed LD-88-047, Forwards Amend C to CESSAR-DC (Design Certification), Chapters 5,6 & 10.Summary of Significance of Revs Also Encl1988-06-30030 June 1988 Forwards Amend C to CESSAR-DC (Design Certification), Chapters 5,6 & 10.Summary of Significance of Revs Also Encl LD-88-046, Forwards Response to NRC 880315 Request for Addl Info Re CESSAR-DC,Chapter 10, Plant Sys Branch1988-06-30030 June 1988 Forwards Response to NRC 880315 Request for Addl Info Re CESSAR-DC,Chapter 10, Plant Sys Branch LD-88-042, Provides Proposed Resolutions to Remaining Two Issues Committed to in Re Direct Containment Heating (Idcor Issue 8) & Debris Coolability (Idcor Issue 10).C-E Plans to Adopt 14 Resolutions Previously Submitted1988-06-17017 June 1988 Provides Proposed Resolutions to Remaining Two Issues Committed to in Re Direct Containment Heating (Idcor Issue 8) & Debris Coolability (Idcor Issue 10).C-E Plans to Adopt 14 Resolutions Previously Submitted LD-88-039, Forwards Addl Info Re Chapters 1 & 10 to CESSAR-DC,per NRC 880311 Request1988-06-0606 June 1988 Forwards Addl Info Re Chapters 1 & 10 to CESSAR-DC,per NRC 880311 Request LD-88-038, Provides Proposed Resolutions for Four of Six Issues Which Make Up Topic Paper Set 2,including in-vessel Hydrogen Generation,Core Melt Progression & Vessel Failure & Hydrogen Ignition & Burning.Remaining Issues Submitted in 30 Days1988-06-0606 June 1988 Provides Proposed Resolutions for Four of Six Issues Which Make Up Topic Paper Set 2,including in-vessel Hydrogen Generation,Core Melt Progression & Vessel Failure & Hydrogen Ignition & Burning.Remaining Issues Submitted in 30 Days LD-88-034, Provides Addl Info on CESSAR-DC Chapter 10 Re Secondary Water Chemistry,Per NRC 880225 request.CESSAR-DC Section 10.3.5.1 Revised to Make Clear That C-E Secondary Water Chemistry Program Includes Immediate Shutdown Limits1988-05-25025 May 1988 Provides Addl Info on CESSAR-DC Chapter 10 Re Secondary Water Chemistry,Per NRC 880225 request.CESSAR-DC Section 10.3.5.1 Revised to Make Clear That C-E Secondary Water Chemistry Program Includes Immediate Shutdown Limits LD-88-033, Forwards Response to NRC 880226 Request for Addl Info on Chapter 17 to Rev 4 to Topical Rept CENPD-210A, QA Program, Including Revs to C-E 871130 & 880411 Responses1988-05-25025 May 1988 Forwards Response to NRC 880226 Request for Addl Info on Chapter 17 to Rev 4 to Topical Rept CENPD-210A, QA Program, Including Revs to C-E 871130 & 880411 Responses LD-88-026, Forwards Draft Revs to C-E Chapters 1,4,5 & 9 to C-E Std Sar.Meeting to Resolve Issues Re Schedule & Composition of Submittals as Part of Draft Licensing Review Bases & Related Issues,Requested1988-04-11011 April 1988 Forwards Draft Revs to C-E Chapters 1,4,5 & 9 to C-E Std Sar.Meeting to Resolve Issues Re Schedule & Composition of Submittals as Part of Draft Licensing Review Bases & Related Issues,Requested LD-88-021, Forwards Response to NRC 871208 Request for Addl Info Re Reg Guides That Appear in CESSAR-DC,QA.Suggest That Meeting W/Nrc Staff Be Scheduled to Allow Overview Program Changes1988-03-22022 March 1988 Forwards Response to NRC 871208 Request for Addl Info Re Reg Guides That Appear in CESSAR-DC,QA.Suggest That Meeting W/Nrc Staff Be Scheduled to Allow Overview Program Changes LD-88-019, Forwards Addl Info Re Chemical & Vol Control Sys for Sys 80+TM Std Design,Per 871217 Request.Proposed Rev to C-E Std SAR, Design Certification Also Encl1988-03-18018 March 1988 Forwards Addl Info Re Chemical & Vol Control Sys for Sys 80+TM Std Design,Per 871217 Request.Proposed Rev to C-E Std SAR, Design Certification Also Encl LD-88-020, Responds to NRC Request for Addl Info Re Chapter 1 Concerning Safeguards.Proposed Revision to C-E Engineering Std SAR & Responses to Specific Questions Also Encl1988-03-18018 March 1988 Responds to NRC Request for Addl Info Re Chapter 1 Concerning Safeguards.Proposed Revision to C-E Engineering Std SAR & Responses to Specific Questions Also Encl ML20149M6171988-02-16016 February 1988 Forwards Proprietary & Nonproprietary Base Line Level 1 PRA for Sys 80R NSSS Design, Per NRC Request.Proprietary Rept Withheld (Ref 10CFR2.790) LD-88-008, Forwards Proprietary Base Line Level 1 PRA for Sys 80r NSSS Design. Rept Presents Methodology & Results of Sys 80 PRA to Be Used for Evaluation of Design trade-offs for Sys 80+ Std Design1988-01-22022 January 1988 Forwards Proprietary Base Line Level 1 PRA for Sys 80r NSSS Design. Rept Presents Methodology & Results of Sys 80 PRA to Be Used for Evaluation of Design trade-offs for Sys 80+ Std Design ML20148D3241988-01-19019 January 1988 Forwards Input to Licensing Review Bases Document Being Developed for CESSAR - Design Certification Originally Transmitted on 870702.Encl C-E Sys 80+TM Std Design Design Certification Bases Addresses NRC 871207 Comments LD-87-068, Forwards Proposed Amend to CESSAR FSAR Describing Sys 80 Plus Design.Mods Comply W/Standardization & Severe Accident Policy Statements & Results in Upgrading of Final Design Approval FDA-2.Clarification of NRC Fees Requested1987-11-30030 November 1987 Forwards Proposed Amend to CESSAR FSAR Describing Sys 80 Plus Design.Mods Comply W/Standardization & Severe Accident Policy Statements & Results in Upgrading of Final Design Approval FDA-2.Clarification of NRC Fees Requested LD-87-053, Forwards Revised Steam Generator Tube Rupture Analysis for Fsar.Rev Incorporates Revised Analysis Using Reactor Coolant Gas Vent Sys for Depressurization Purposes1987-09-18018 September 1987 Forwards Revised Steam Generator Tube Rupture Analysis for Fsar.Rev Incorporates Revised Analysis Using Reactor Coolant Gas Vent Sys for Depressurization Purposes LD-87-050, Requests NRC Adoption of Proposed Docketing Process for Forthcoming Revs to C-E Std SAR1987-09-18018 September 1987 Requests NRC Adoption of Proposed Docketing Process for Forthcoming Revs to C-E Std SAR LD-87-052, Requests That Steam Generator Tube Vibration Issue Be Closed on C-E Std SAR - FSAR (CESSAR-F) Docket.Any Potential Design Improvements for Future Steam Generators Can Be Reviewed as Part of Review of Improved Design Sys 80+1987-09-18018 September 1987 Requests That Steam Generator Tube Vibration Issue Be Closed on C-E Std SAR - FSAR (CESSAR-F) Docket.Any Potential Design Improvements for Future Steam Generators Can Be Reviewed as Part of Review of Improved Design Sys 80+ LD-87-051, Provides Design Info to Support Conclusion That Sys 80R in Compliance W/Atws Rule.Requests Closure of Issuance on CESSAR - F Docket.Response to NRC Evaluation of CEN-315,Sys 80R Encl1987-09-18018 September 1987 Provides Design Info to Support Conclusion That Sys 80R in Compliance W/Atws Rule.Requests Closure of Issuance on CESSAR - F Docket.Response to NRC Evaluation of CEN-315,Sys 80R Encl LD-87-054, Forwards Amend 12 to CESSAR Fsar,Modifying Sys 80R Design. Enhanced & Expanded Sys 80 Design Will Be Called Sys 80 Tm1987-09-18018 September 1987 Forwards Amend 12 to CESSAR Fsar,Modifying Sys 80R Design. Enhanced & Expanded Sys 80 Design Will Be Called Sys 80 Tm LD-87-021, Provides Formal Description of C-E Efforts to Advance Sys 80R PWR Design & Advises That Sys 80 Design Including Consideration of EPRI Advanced LWR Design Requirements Document Revised1987-04-23023 April 1987 Provides Formal Description of C-E Efforts to Advance Sys 80R PWR Design & Advises That Sys 80 Design Including Consideration of EPRI Advanced LWR Design Requirements Document Revised LD-87-017, Responds to 870327 Questions Re Steam Generator Tube Vibration Observed at Palo Verde Units 1 & 2.Definition & Scope of Program to Review Phenomenon Will Be Available for Review W/Nrc in Approx 90 Days1987-04-10010 April 1987 Responds to 870327 Questions Re Steam Generator Tube Vibration Observed at Palo Verde Units 1 & 2.Definition & Scope of Program to Review Phenomenon Will Be Available for Review W/Nrc in Approx 90 Days 1990-08-28
[Table view] |
Text
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
September 20, 1988 LD-88-099 Docket No. STN 50-470F (Project No. 675)
Mr. Guy S. Vissing, Project Manager Standardization and Non-Power Reactor Project Directorate Office of Nuclear Reactor Regulation Attn: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Response to NRC Requcst for Additional Information on Chapters 5 and 9, CESSAR-DC
References:
(A) Letter, G. S. Vissing (NRC) to A. E. Scherer (C-E), dated June 28, 1988 (B) Letter, LD-88-026 A. E. Scherer (C-E) to F. J. Miraglia (NRC), dated April 11, 1988.
Dear Mr. Vissing:
Reference (A) requested that Combustion Engineering provide additional information on CESSAR-DC, Chapters 5 and 9. Enclosure (1) to this letter provides our responses , and Enclosure (2) provides the corresponding proposed revisions to our submittal of Reference (B).
If you have any questions, please feel free to contact me or Mr. S. E.
Ritterbusch of my staff at (203) 285-5206.
Very truly yours, COMBUSTION ENGINEERING, INC.
'f&
0009290014 000920 0 A . I' JeheNr PDR ADOCK 050 DWW Nuclear Licensing AES:dmb
Enclosures:
As Stated h ec: Mr. Frank Ross (DOE - Germantown) g
- l Power Systems 1000 ProspNt H.S Road C03) 688-1911 Comtoston Eryneenng. Inc Post O"ce 00= 500 Tedes 99297 Windsor, Connectcut 06095-0500
Enclosure (1) to LD-88-099
. Page 1 of 13 4
RESPONSE TO NRC REQUEST FOR ADDITIONAL !!! FORMATION CONCERNING Cl!APTERS 5 AND 9, CHEMICAL ENGINEERING BRANCH 4
1 1
l l
Y e
1 Enclosure (1) r 1
to LD-88-099 l Page 2 of 13 l l
Question 281-14 (Pages 5.1-14, Item K.2)
, Steam genemtor se:ondary water chemistry specifications is referenced as .
i being in Section 10.3.4. However, in Amendesnt 12 to Chapter 20 (sic) t this subject is included in Section 10.3.5. Which section is intentied to i discuss steam generator secondary water chemistry? ;
Response 281-14 l
)I i
Section 10.3.5 is inter ded to discuss steam generator secondary water chemistry. Section 5.1.4.K.2 will be revised to reference Section 10.3.5.
b t
) '
! I t
i 4 !
l q
I I
1 j
l l
i
}
Enclosure 1) to LD-CS-O i')
Page 3 of le Question 231-15 (Page 5.1-16)
Fluid chemistry should be more specific, such as, reactor coo' tant water chemistry.
Respons 281-15 Combustion Engineering agrees. Section 5.1.4.L.4 wii.1 he revised to state {
"the material is compatible with the reactcy coo'.aat we.ter enemistry described in Section 9.3.4."
s i
4 k
i P
1 l
)
i
-- - - - ,.- c.- - . , .- ,,_ - _ _ _ _ - - . - , , , ,--_-_----y . , . _ - - - _ - ~ - ,
- - , - , ,_g ,, , ,p
i Enclosure (1) to LD-88-099 Page 4 of 13 Question 281-16 (Page 5.1-18, Item 7)
MISV is a typo and should be MSIV.
Response 281-16 Combustion Engineering agrees. Section 5.1. 4. M . 7 will be revised to correct this typographical error.
. Enclosure (1) to LD-88-099 Page 5 of 13 Question 281-17 (Page 5.1-22, Item P.3)
Amendment B states that the fire protection system should be consistent ,
with the requirements of GDC. The fire protection section should be more
. specific and should reference GDC 3 and 5.
Response 281-17 Combustion Engineering will revise CESSAR-DC Section 5.1.4.P.3 tostate that a fire protection system shall be provided consistent with the requirements of GDC 3 and 5.
t 4
.I 4
)
r I
i eer '
i i
Enclosure (1) to LD-88-099 Page 6 of 13 Question 281-18 (Page 5.2-13, Section 5.2.3.2.3)
Reachable halogens is a typo and should be leachable halogens.
Response 281-18 Combustion Engineering agrees. Section 5.2.3.2.3 will be revised to correct this typographical error, P
L I
Enclosure (1) to LD-88-099 Page 7 of 13 Question 281-19 (Page 5.2-19, Section 5.2.3.4.1.2.1)
The units of conductivity is incorrect and should be mhos/cm or S/cm.
Response 281-19 Combustion Engineering agrees. Section 5.2.3.4.1.2.1 will be revised to indicate that the units of conductivity are mhos/cm.
i i
i i
-- - - - - . - - - , . _ _ - , - - ,c,. - ,- - - - - - - -- , -,- - ,-- --- - , .,,-,-,,w-----,-,.en --,----r
Enclo:ure (1) to LD-88-099 Page 8 of 13 Question 281-20 (Table 5.4.10-1)
Spray flow, minimum, 375 gal / min and spray flow, continuous,1.5 gal / min seems inconsistent. Shouldn't continuous spray flow be greater than the minimum?
Response 281-20 The numerical values are correct as provided, however, the terminology of CESSAR-DC Table 5.4.10-1 will be clarified as described below.
The pressurizer spray system consists of piping runs from the discharge side of RCPs 1A and IB to the pressurizer sprey nozzle (CESSAR-DC, Figure 5.1.2-1). A control valve in each line regulates the amount of spray by varying the valve position as a function of pressurizer pressure.
The system is designed to provide the spray flow necessary to maintain the pressurizer pressure below the reactor trip setpoint following an insurge of water during maneuvering, load follcw, and loss of load transients, such that the pressurizer safety valves are not actuated by overpressure transients. The minimum design capacity for this spray flow for the System 80+ " design is 375 gallon per minute (gpm).
In order to avoid stratification of the pressurizer boron concentration and to maintain the temperature in the surge and spray lines (thereby reducing thermal shock as the spray contrcl valves open), a small continuous spray flow of approximately 1.5 gpm is maintained to the pressurizer through hand-operated globe valves located in bypass lines l around the spray control valves. These spray bypass valves are set during hot functional testing and remain open during plant operation. The
! spray control valves, on the other hand, are normally closed and are opened automatically to maintain pressurizer pressure.
i As discussed above, continuous spray flow through the bypass valves is l
not greater than the minimum design capacity of the spray control valves.
l Table 5.4.10-1 will be revised to indicate that 375 gpm is the minimum de' sign capacity, and not the minimum flow, for the pressurizer spray system.
l l
Enclosure (1) to LD-88-099 Page 9 of 13 Question 281-21 (Page 9.3-36, Section 9.3.4.3.4)
The maximum amount of oxygen from air dissolved in water at 25' is approximately 8 ppm. This only applies at atmospheric pressure. Please clarify the statement.
r Response 281-21 The corresponding paragraph of CESSAR-DC states:
These data reveal that no chloride stress corrosion occurs at oxygen concentrations below approximately 0.8 ppm. This oxygen limit was reduced by a factor of 8 to give the conservative concentration of 0.10 ppm oxygen. The maximum amount of oxygen from air dissolved in water at 25*C is approximately 8 ppm. At this concentration, a chloride concentratloa of less than approximately 1.50 ppm would preclude the possibility of chloride stress cormston. This limit was reduced by a factor of 10 to provide a comervative chloride limit of 0.15 ppm.
The above discussion provides a brief expla:1ation of how the reactor coolant oxygen and chloride limits were established by Combustion Engineering. That explanation remains unchanged from CESSAR-F, and the Chemical and Volume Control System described in Section 9.3.4 of CESSAR-F was approved by the NRC, as documented in the Safety Evaluadon Report (NUREG-0852). Notwithstanding that approval, however, the following information is provided as supplemental clarification.
First, the reactor coolant oxygen limit was established based upon data indicating the relationship between oxygen concentration and the susceptibility of austenitic stainless steel to stress corrosion cracking.
These data revealed that no stress corrosion occurs at oxygen concentrations below approximately 0.8 ppm. For conservatism this value ,
was reduced to 0.1 ppm. Thh oxygen limit is applicable for all plant operating modes with the reactor vessel head in place.
j During plant operations when the reactor vessel head is removed , the reactor coolant is air sa turated. At 25 C this corresponds to j , approximately 8 ppm of oxygen. For conservatism in establishing the reactor coolant chloride limit, it was assumed that this 8 ppm of oxygen
{
Enclosure (1) to LD-88-099 Page 10 of 13 would remain in solution during subsequent plant operations with the reactor vessel head installed, even though the plant chemistry limits require the oxygen concentration to be less than 0.1 ppm for such ,
operation. At 8 ppm of oxygen, a chloride concentration of less than approximately 1.5 ppm will preclude the possibility of stress corrosion cracking. This limit was reduced by a factor of 10 to provide a conservative chloride limit of 0.15 ppm.
No change to CESSAR-DC is planned.
l i
,,___,,~.e_,,. - . - . , . . . -
Enclosure (1) os LD-88-099 Page 11 of 13 Question 281-22 (Table 9.3.4-1, Sheet 1 of 2) pH analysis temperature indicates 77'. The temperature unit should be incluried (i.e. 77'F).
'sesponse 281-22 Combustion Engineering agrees. Table 9.3.4-1 will be revised to indicate the specified pH ranges are for reactor coolant at 77 F.
l I
l
{
1 i
I i
l +
. Enclosure (1) to LD-88-099 Page 12 of 13 Question 281-23 (Pg. 9.3-19)
The Advanced Light Water Reactor Requirements Document indicated that the design of the le'.down purification line from the reactor coolant system should be such that 30 seconds to one minute is allowed for fluid to flow from the le:down connection to the containment penetration to reduce radiation exposures. Confirm that this consideration is factored in the design of the CVCS system.
Response 281-23 The System 80+T.M Chemical and Volume Control System (CVCS) design will include a provision that the design of the letdown purification line from the reactor coolant system will be such that at least thirty (30) seconds will be allowed for fluid to flow from the letdown connection to the containment penetration. This provision is consistent with the intent of the EPRI design requirement provided in the Advanced Light Water Reactor (ALWR) Requirements Document Paragraph No. 6.3.2.6 (Rev. 0). As documented in the Draft Safety Evaluation Report (DSER), dated May, 1988 Combustion Engineering understands this does not conflict with any NRC requirements. Neither the ALWR Requirements Document nor the DSER indicate that this provision is a regulatory requirement.
. Enclocure (1) to LD-88-099 Page 13 of 13 Question 281-24 (Pg. 9.3-19, Section 9.3.4.1.2)
The Advanced Light Water Requirements Document addresses hydrogen utilization precautions in the CVCS system design and arrangement to minimize the potential for and the effects of hydrogen ignition. Indicate design features to prevent explosive hazards associated with use of hydrogen in the volume control tank.
Response 281-24 Several design features have been incorporated into the design of the volume control tank (VCT) to prevent explosive hazards associated with the use of hydrogen. In addition to proper ventilation, all vent lines and relief valves on the VCT gas space are designed to be hard piped directly to the gaseous waste management system (CESSAR-DC Figure 9.3-1). The gaseous waste management system is specifically designed tc sr.fely dispose of all hydrogen discharged to it. All drain and relief valves on the VCT are also designed to be hard piped to specific collection tanks which are designed to safely dispose of hydrogen. Finally, all isolation valves within the VCT cubicle are packless type valves designed to prevent the escape of gases.
The above design features are consistent with the intent of the EPRI design requirement provided in the Advanced Light Water Reactor Requirements ( ALWR) Document, Paragraph Nos. 6.4.3.1.1 and 6.4.3.1.4 (Rev. 0). As documented in the Draft Safety Evaluation Report (DSER) dated May, 1988, Combustion Engineering understands that these design features do not conflict with any NRC requirements. Neither the ALWR Requirements Document nor the DSER indicate that these provisions are regulatory requirements.
- . . - - . . . . . ..n . .u_ _
y _
?&" '
Enclosure (2) if ,, . to LD-88-099 Page 1 of 9 4
5 PROPOSED REVISIONS TO THE COMBUSTION ENGINEERING STANDARD SAFETY ANALYSIS REPORT O
.- "'~" to LD-88-099 C ES S A R 'CERTIFICATICN Paso 2 of 9 h k 7D\'N
- 9. If the isolation valves upstream of the ADVs are electrically controlled and operated, the valve operator and control systems shall be designed to the same IEEE standards as applied to the ADVs.
J. Insoection and Testina IB
- 1. All ASME B&PV Code,Section III, Class 1 and 2 valves shall be designed, fabricated and installed such that they are capable of being periodically tested in accordance with ASME Code,Section XI.
- 2. Adequate clearances shall be provided for inservice inspection of the Reactor Coolant Pressure Boundary and the ASME B&PV Code Section III, Class 2 portions of the Main Steam, Main Feed. Emergency Feed, and Blowdown systems' piping, in accordance with the provisions of Section XI of the ASME Boiler and Pressure Vessel Code.
- 3. Biological shielding and all other insulation, if installed around the Reactor Coolant Pressure Boundary, shall be designed to afford access for inservice inspection as defined by Section XI of '
che ASME Boiler and Pressure Vessel Code.
- 4. The pressurizer manway shall be accessible for internal examination of the pressurizer.
K. Chemistrv/Samolina
- 1. A sampling system which provide a means of obtaining remote liquid samples from the RCS for
( chemical and radiochemical laboratory analysis shall be provided. The sampling system shall be designed to allow for the following tests:
corrosion product activity levels, dissolved gas, fisvion product activity, chloride concentration, coalant pH, conductivity levels and boron concen-tration. The pressurizer steam space sample lines shall contain 7/32" x 1" o.-ifice as close to the
) pressurizer as possible. The sample system shall l be as shown on Figure 5.1.2-1.
l
- 2. A system or systems shall be provided to maintain the steam gener_a t or_ secondary water chemistry within Section -hh-3-t- specifications during plant 10.3 . 5 l
)
l Amendment B 5.1-14 March 31, 1988 i 'l I '
Enclosura (2)
.- .CESSAR EMen,. En88f/
h k 7.M-% '
- f. copper acid etchants,
- g. penetrants.
If the above materials are intended to be used, the use shall first be approved by C-E.
- 4. The sample lines in contact with the reactor coolant, including welds shall be designect sur-h _ _
that the material is compatible with th fidif' ~ N che.nistry described in Section 9.3.4.
ee.v?o(coo --
- 5. Construction materials or protective coatings containing low melting point elements, particularly lead, mercury and sulfur, shall not be used if they could come in contact with the secondary systems. This is required to' reduce to a minimum the potential for stress corrosion cracking of Inconel material in the- steam generators.
- 6. The secondary system piping shall be designed to allow cleaning for the removal of foreign material and rust prior to operation and to prevent introduction of this material into the steam generator. Chemical cleaning or hand cleaning may be employed. During chemical cleaning, no fluid shall enter the steam generators. Suitable bypass piping shall be provided if required.
- 7. Non-metallic insulation used on the Reactor Coolant pressure Boundary shall conform to Regulatory Guide 1.36. The chloride and fluoride content of the non-metallic insulation shall be in the acceptable region as shown in Regulatory Guide 1.36. Tests shall be made on representative samples of the non-metallic thermal insulation shall be demineralized or distilled water.
- 8. No contaminants, except for cutting oils, shall be left on any RCS component surface except for the time required to perform and evaluate the particular fabrication or inspection operation.
- 9. Field welding of the RCS piping assemblies and components shall be done in accordance with a welding procedure or procedures by welders qualified to ASME Section IX requirements.
}
5.1-16 sa n _t
CESSAR E!Menim 7 $%@
_ Page h of 9 kZWO )
~
- 6. The RCS and main steam piping, MSIVs, primary and secondary safety valves and their discharge piping and ADVs shall be arranged and supported such that the limitin( loads are not exce_eded for normal and relieving conditions. gg
- 7. Following a secondary li reak either all steam paths downst:;eam of th TC"'; hall be shown to be isolated by their resp ve control systems following a PSIS actuation signal, or the results of a blowdown through a non-isolated path shall be shown to be acceptable. An acceptable maximum steam ficw from a non-isolated steam pagh is 10%
of the main steam rate (MSR) (1.9 x 10 lb/hr 9 1000 psia saturated steam). It is not required that the control systems for downstream valves nor the downstream valves themselves be designed to IEEE 2;9 and IEEE 308 or ASME Code,Section III and Seismic ^ategory I criteria respectively.
- 8. The MSIVs for each steam generator shall be arranged such that a maximum of 2000 cubic feet (total for two steam lines per steam generator) is contained in the piping between each steam
'Jenerator and its associated MSIVs. This volume shall include all lines off of tle main steam line up to their isolation valves.
- 9. The main steam lines shall be arranged such that a maximum of 14,000 cubic feet is contained between the MSIVs an<2 the turbine stop valves. This volume shall include all lines off of the main steam line up to their isolation valves.
- 10. The main steam lines shall be headered together prior to the turbine stop valves but not upstream of the !GIVs , and a crossconnect line shall be provided which will maintain steam generator
' pressure differences within the following limits for all normal and upset conditions.
- a. 0-15% power operation pressure difference to be 1 psi.
- b. 15-100% power operation pressure difference to be 3 psi.
- 11. No automatically actuated valves shall be located upstream of the MSIVs except as required for i
supply to steam driven emergency foodwater pumps. j Proviswns shall be made to prevent blowdown of 5.1-18
'O n
.CESSAR!Enem E $78 !$' !
Page 5 of 9 ;
O h % \* O
- 8. The design pressure, temperature, and flow ratints of the main steam piping and valves shall be greater than or at least equal to the design pressure, temperature, and flow rating of ths )
steam generator secondary side.
P. Related Service
- 1. The pressure and thermal transients described in Subsectich J.3.lc1 shall be utilized in the design of those portions of the RCS not within the CESSAR design scope.
- 2. The systems or portions of reactor coolant pressure boundary outside of the CESSAR design scope shall be Safety class I unless the conditions of 10CFR50.55A are met.
- 3. A fire protection system shall be provided to protect the RCS consistent with the requirements of GD and, shall include as a minimum, the follo' ng features:
g a. Facilities for fire detection and alarming.
- b. Facilities for methods to minimize the probability of fire and its associated effects.
- c. Facilities for fire extinguishment.
- d. Methods of ' fire prevention such as use of fire resistant and non-combustible materials whenever practical, and minimizing exposure of combustible materials to fire hazards.
- e. Assurance that fire protection systems do not i adversely affect the functional and structural integrity of safety related structures, systems, and components.
- f. Fire protection systems shall be designed to assure that their rupture or inadvertent operation does not significantly impair the capability of safety related structures, systems, and compenants.
- 4. Systems shall be provided for the detecticn of reactor coolant leakage from unidentified sources.
5.1-22
l Enclosure (2) !
CESSAR !aMem:u to to-33 0S9 Page 6 of 9 Q M M -\B 5.2.3.2 Compatibility with Reactor Coolant 5.2.3.2.1 Reactor Coolant Chemistry Controlled water chemistry is maintained within the RCS. Control of the reactor coolant chemistry .i s the function of the CVCS which is described in Section 9.3.4. Water chemistry limits applicable to the RCS are given in Section 9.3.4.
5.2.3.2.2 Materials of Construction Compatibility with Reactor Coolant The materials of construction used in the RCPB which are in contact with reactor coolant are designated by an "a" in Table 5.2-2. These materials have been selected to minimize corrosion and have previously demonstrated satisfactory performance in other existing operating reactor plants.
Metallic materials in contact with reactor coolant shall be restricted in cobalt content to as low a level as practical for B all stainless steel or nickel base alloy components with a large wetted surface area. Cobalt base alloys shall be avoided except in cases where no proven alternative exists.
5.2.3.2.3 Compatibility with External Insulation and Environmental Atmosphere The possibility of leakage of reactor coolant onto the reactor vessel head causing corrosion of the' pressure boundary has been investigated by C-E.
Tests have shown that reactor coolant system leakage onto surfaces of the reactor coolant pressure boundary will not affect the integrity of the pressure boundary.
lB The insulation supplied by C-E is of the stainless steel reflective type, which ainimizes insulation contamination in the event of a chemical solution spillage. In local areas around stainless steel and the nickel based alloy nozzles in the reactor vessel head, small sections of non-metallic insulation are used.
However, the quantity of J :ch;bic-halogens will be limited in accordance with Regulatory Guide 1.36.
\e.va\e.
Amendment B 5.2-13 March 31, 1988
'o n '
CESSAR!Encma Ts*!L'oW Page 7 of 9 Q A m -\9 overlay on the end of the nozzle. Following final stress relief of the component, the stainless steel safe end is welded to the Inconel overlay, using Inconel weld filler metal.
5.2.3.4.1.2 Avoidance of Contamination Causina Stress Corrosion Crackina 5.2.3.4.1.2.1 N888 Components. Specific requirements for cleanliness and contamination protection are included in the equipment specifications for components fabricated with austenitic stainless steel. The provisions described below indicate the type of procedures utilized for NSSS components to provide contamination control during fabrication, shipment, and storage as required by Regulatory Guide 1.37.
Contamination of austenitic stainless steels of the 300 type by compounds which can alter the physical or metallurgical structure and/or properties of the material is avoided during all stages of fabrication. Painting of 300 series stainless steels is prohibited. Grinding is accomplished with resin or rubber-bounded aluminum oxide or silicon carbide wheels which were not previously used on materials other than austenitic alloys. Outside storage of partially-fabricated components is avoided and in most cases prohibited. Exceptions are made for certain components provided they are dry, completely covered with a waterproof material, and kept above ground.
Internal surfaces of completed components are cleaned to produce an item which is clean to the extent that grit, scale, corrosion products, grease oil, wax, gum, adhered or embedded dust or extraneous materials are not visible to the unaided eye.
Cleaning is effected by either solvents (acetone or isopropyl alcohol) or inhibited water (hydrazine). Water will conform to the following requirements:
Halides Chloride (ppm) 0.60 Fluoride (ppm) 0.40 Conductivity (l=h cfcm) 5.0 pmkos pH 6.0-8.0 Visual clarity No turbidity, oil, or sediment To prevent halide-induced intergranular corrosion which could occur in aqueous environment with significant quantities of 5.2-19 n n
r' ' .
Enclosuro (2)
.CESSAR Hiecun.
- m-88499 Page 8 or 9 k k 7D\ "LO Ij n E 5.4.10-1 PRESSURIZER PARAMETERS Property Parameter Design pressure, psia 2500 Design temperature, 'F 700 Normal operating pressure, psia 2250 Normal operating temperature, 'F 652.7 Internal free volume, ft 3 2400 Normal (full power) operating water volume, ft 3 1200 B Normal (full power) steam volume, ft 3 1200 Installed heater capacity, KW 1800 Heater type y }- Immersion Spray flow, minim al/ min 375 Spray flow, continuous, gal / min 1.5 Nozzles Surge, in. (nominal) 12, schedule 160 Spray, in. (nominal) 4. schedule 160 Safety valves, in. (nominal) (LATER) B Instrument level, in. (nominal) 3/4, schedule 160 Temperature, in. (nominal) 1, schedule 160 Pressure, in. (nominal) 3/4, schedule 160 Heater, 0.0. , in. 1-1/4 Amendment B March 31, 1988
' fl D
Enclosure (2)
CESSAR !!nincua EfiN P Q A 28-u TABLE 9.3.4-1 (Sheet 1 of 2) 9fEEATING LIN1JJ 1.0 REACTOR COOLANT MAKEUP WATER Analysis Normal Chloride (Cl) < 0.15 ppm pH 6.0 - 8.0 B Fluoride (F) < 0.1 ppm Suspended Solids < 0.35 ppm B 2.0 PRIMARY WATER Pre Core Hot Initial Core Load Power Analysis Functionals (1) and Criticality Operation pH (77'J 3.8 - 10.4 4.5 - 10.2 4.5 - 10.2 8 c-r Conduc ivity (2) (2) (2)
Hydrazine 30-50 ppm (3) 30-50 ppm (3) 1.5 x 0xygen ppm (4)
(max. 20 ppm)
Ammonia <50 ppm <50 ppm 0-2 ppm Dissolved Gas (5)
Lithium 1-2 ppm 0.2 2.3 ppm 0.2-2.3 ppm Hydrogen (6) 25-50 cc (STP)/kg (Hp 0) (7)
Oxygen 50.1 ppm 30.1 ppm (9) 10.1 ppm Suspended Solids <0.35 ppm,(8) <0.35 ppm,(g) <0.35 ppm,(8) 2 ppm max. 2 ppm max. 2 ppm max.
Chloride 50.15 ppm 10.15 ppm 10.15 ppm l
( Fluoride 10.1 ppm 10.1 ppm 10.1 ppm i
Boron s Refueling s Refueling
- Concentration Concentration Amendment 8 March 31, 1988