Responds to 780803 NRC Ltr Requesting Design Commitments to Be Implemented for Reactor Coolant Pump Tests.Util Will, If Results Are Not Positive,Provide Safety Grade Instru to Initiate Automatic Protec Action Re Seal Degradation
ML20150D323
Person / Time
Site: Green County Power Authority of the State of New York icon.png
Issue date: 11/29/1978
From: Early P
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Baer R
Office of Nuclear Reactor Regulation
References
GPO-770, NUDOCS 7812050139
Download: ML20150D323 (2)


Text

!

Y POWER AUTHORITY OF THE STATE OF NEW YORK 10 COLUMBUS CIRCLE NEW YORK, N. Y.10019 (212) 397-6200 TRUSTEE 5 GEORGE T. BERRY FREDERICK R. CLARK ,g'o"'c"g fg y" *g"g*gfu'g"g g LEWIS R. BENNETT GEORGE L. INGALLS ASSISTANT GENERAL VICE CHAIRM AN CO NSE RICH ARD M. FLYNN WILBUR RONBE M A N AGE R.E N GINE E RING ROBERT l. MILLONZI WILUAM F, LUDDY November 29, 1978 JOHN W. OMON GPO-770 aowtR o rE R ArioN.

THOMAS F CCRANN,JR.

Director, Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D . C. 20555 Attention: Mr. Robert L. Baer, Chief Light Water Reactor Branch No. 2 Division of Project Management

Reference:

Letter from R. L. Baer (NRC) to Mr. G. T. Berry (PASNY)

Dated August 3, 1978

Subject:

Greene County Nuclear Power Plant Loss of Component Cooling Water to Reactor Coolant Pump Seals Docket No. 50-549

Dear Sir:

The NRC,by the referenced letter and in the Safety Evaluation Report (SER), Supplement 1, has requested design commitments which would be implemented in the event that reactor coolant pump tests do not show that pump seal in-tegrity is maintained for thirty minutes following loss of component cooling water to the seals.

The Authority will, if tests results are not positive, provide safety grade instrumentation to initiate automatic protective action to prevent seal degradation from resulting in a breech of the reactor coolant pressure boundary.

'O 78120501~&l \

k i

Page Two November 29, 1978 We expect that this commitment will resolve cutstanding item number 14 as identified in the Safety Evaluation Report Supplement 1, Section 1.8.

Very trul urs,

/ DL/

Paul J. Earl Assi$ tant C ef Engineer-Projects -