ML20147C746

From kanterella
Jump to navigation Jump to search
States Util Will Redesign Fuel Bldg as Requested in 781020 NRC Ltr.Expects This Will Resolve Outstanding Item 24 in SER Suppl 1 Section 1.8
ML20147C746
Person / Time
Site: Green County Power Authority of the State of New York icon.png
Issue date: 11/29/1978
From: Early P
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Baer R
Office of Nuclear Reactor Regulation
References
GPO-771, NUDOCS 7812180388
Download: ML20147C746 (1)


Text

_ _ _ _ _.-

NRC PUBLIC DOCIIMENT Rr' POWER AUTHORITY OF 7 HE STATE OF NEW YORK 10 CoLUMous CIRCLE

. NEW YORK, N. Y.10019 (212) 317 6200 TRUSTEES GEOR GE T. DERR Y E M AI.y N A uA gR G

FRE o g n tCtf R. CLARK g

g,

., ggy CHASSM AN LEWi6 R t10 PI N E T T AsetsT ANT Gl.NERAL SEORGE L, ING ALLS ANAGEN-GfNEWt*L veC 8 CH Al# M AN s

WlL9 U R L. CflONUC RG RICHARD M. FLYNN 4

ANAf El GI EER NO ROBERT 1. MILLON11 f

November 29, 1978 JOHN W. DOSToff WILLIAM r. Lucoy GPO-771 rowca orr auioNs THOM AS F cCRANN JR, Director, Office of Nuclear Reactor Regulation U.

S.

Nuclear Regulatory Commission Washington, D.C.

20555 Attention:

Mr. Robert L.

Baer, Chief Light Water Reactor Branch No. 2 Division of Project Management

Reference:

Letter from Mr.

D.

B. Vassallo (NRC) to Mr.

G.

T. Berry (PASNY) g@

4 Dated October 20, 1978 g

/

dk b

Subject:

Greene County Nuclear Power Plant F'uel Building Seismic Design gJ w.

Docket No. 50-549 a

g

./

-2

Dear Sir:

[qt 06 The Authority will redesign the GCNPP fuel bu.11 P

y requested in enclosure 2 to the referenced letter.

We expect that this commitment will resolve outstanding item number 24 as identified in the Safety Evaluation Report, Supplement 1, Section 1.8.

Very trul -yg rs,

/:

s' kIM P a u 'l J '. Early' l

Assi ' tant Ch'ef Engineer-Projects cc:

NRC Service List 78121803gg k

-