Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML19276E492 | 7 March 1979 | in Response to NRC 790131 Ltr,Plant Will Be Designed & Constructed to Implement Design Options Prior to Final Decision on ATWS Issue | Backfit |
ML19263C528 | 16 February 1979 | Informs NRC That Applicant Will Respond to NRC 790131 Ltr Concerning ATWS Commitment by 790309,allowing Time for Consultation | |
ML19273A979 | 23 January 1979 | Analysis of Addl Costs of Constructing Plant at Athens,Ny, Rather than at Proposed Cementon Site.Total Addl Const Costs Are $364 Million (32-month Delay Before Operation) & $591 Million (42-month Delay) | |
ML19322A066 | 26 December 1978 | Forwards Data Re Total Zinc Surface Area & Mass Inside Containment.Confirms Values to Determine post-LOCA Hydrogen Generation | |
ML20147C746 | 29 November 1978 | States Util Will Redesign Fuel Bldg as Requested in 781020 NRC Ltr.Expects This Will Resolve Outstanding Item 24 in SER Suppl 1 Section 1.8 | |
ML20150D323 | 29 November 1978 | Responds to 780803 NRC Ltr Requesting Design Commitments to Be Implemented for Reactor Coolant Pump Tests.Util Will, If Results Are Not Positive,Provide Safety Grade Instru to Initiate Automatic Protec Action Re Seal Degradation | |
ML20150D104 | 27 November 1978 | Responds to Issue 23 as Identified in Safety Eval Rept Suppl 1,Sec1.8.States Commitment to Mod Design for Cold Shutdown.Fully Agrees with & Supports B&W Comment Re Reg Guide 1-139 | Safe Shutdown |
ML20197D429 | 22 November 1978 | Forwards Util Response to Motion by Lehigh Portland Cement Co to Quash or Modify Authority'S Subpoenas Duces Tecum. W/Encl Affidavit of Svc.W/Encl Response ANO:7811280302 | |
ML20148T567 | 8 November 1978 | Forwards Documents That Reflect Rev to Prefiled Util Testimony:Security Contention Testimony,Engr Safety Contentions,Radiological & Exclusion Area Testimony & Emergency Procedures.Util Will Introduce FSAR at Hearings | |
ML19256A108 | 31 October 1978 | Forwards Util Application for Amend to Dept of Army Permit Sent to Nrc.Amend Covers Reduction in Width of Barge Slip from 100 to 60 Feet to Reduce Dredging & Rock Excavation Concerns | |
ML20148K874 | 31 October 1978 | Forwards Copy of Amend to Appl for Dept of Army Permit(Corps of Engineers Permit) for Info.Barge Slip Will Be Reduced in Width from 100 to 60 Feet |