ML20147E658

From kanterella
Jump to navigation Jump to search
Forwards Interval 2/Period 2/Outage 2 ISI Rept, Vols 1 & 2
ML20147E658
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/11/1997
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20147E661 List:
References
NUDOCS 9703180068
Download: ML20147E658 (1)


Text

,

Om M:r:y South:rn Nucint Vice President Ope;adng Company Farley Project P0. Box 1295 Birmingham, Alabama 35201 Tel 205.992.5131 i

March 11* 1997 SOUTHERN h COMPANY Docket No. 50-364 Energy to serveYourWorld' U. S. Nuclear Regulatory Commission ATTN: Document Control Desk i

Washington, DC 20555 Joseph M. Farley Nuclear Plant - Unit 2 Interval 2/ Period 2/ Outage 2 Inservice Insnection Renort Ladies and Gentlemen:

Pursuant to the requirements of 10CFR50.55a(g) and 10CFR50.36, Southern Nuclear Operating Company submits the Joseph M. Farley Nuclear Plant Unit 2, Interval 2/ Period 2/ Outage 2 Inservice Inspection Report. This report describes and summarizes the inservice inspection activities performed during the Unit 2 eleventh refueling outage. These activities were completed December 12, 1996.

Included in this report are the results of the steam generator eddy current testing conducted during this outage as required by 10CFR50.55a(g) and Section 4.4.6.5 paragraph b of the Farley Nuclear Plant Unit 2 Technical Specifications. Specifically, the results and a summary may be found in Tab B. None of the information in this report is proprietary and may be reproduced as necessary under govern ent regulations associated with the public information rights.

Other pertinent report information is available at Farley Nuclear Plant for your review.

This information includes as applicable, examination plans and schedules, examination results and reports, examination methods and procedures, evaluation results, and corrective actions and repairs.

(

If there are any questions, please advise.

Respectfully submitted, 9703180068 970311 p

T PDR ADOCK 05000364

'pB O

PDR Dave Morey

\\

m DNM/AJP:crs ipolir. doc

, pri p p[b Enclosure e pL pt cc:

Mr. L. A. Reyes, Region II Administrator Mr. J. I. Zimmerman, NRR Project Manager j

Mr. T. M. Ross, FNP Sr. Resident Inspector IB. I.RB. RER. IB.E.N. E.

.