NOTICE OF VIOLATION Toledo Edison Company Docket No. 50-346 As a result of the inspection conducted on November 12 through December 6, 1985, and in accordance with the " General Policy and Procedures for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1985), the following violation was identified:
10 CFR 50, Appendix B, Criterion V, as implemented by Toledo Edison Company Nuclear Quality Assurance Manual and Nuclear Quality Assurance Procedure, requires activities affecting quality be accomplished in accordance with documented procedures.
Contrary to the above, the Bechtel engineering evaluations for Toledo Edison Company site QC issued Nonconformance Reports No. 85-0254 and No. 85-0256 for pipe anchors No. A-46 and No. A-47 utilized methods and values other than the stress allowable criteria prescribed in Bechtel Procedure MGP-04, Table 1, Section 3.3.(b).
This is a Severity Level V violation (Supplement II).
Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or explanation in reply, including for each violation:
(1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further violations; and (3) the date when full compliance will be achieved.
Consideration may be given to extending your response time for good cause shown.
/ 2.[2.7[t r" Q
Dated
. J. Harrison, Chief Engineering Branch 8512310279 851227 PDR ADOCK 05000346 G