VOGTLE OPERATOR LEAVES ATC UNATTENDED
- PIERCE, HERE IS DRAFT OF OPERATOR EVENT AT VOGTLE.
THE FILENAME IS "OPERLEAV." AND IS IN WORDPERFECT.
-I'LL BE IN MONDAY TO FILL IN 4
AREAS WHICH NEED EXPANSIOR FOR THE SPECIAL REPORT.
PD Files:
P:\\0PERLEAV 4
4 i
i l
f c
i 9611040155 960827 PDR FOIA MOHN95-211 PDR
o "At The Controls Area Left" Unattended On August 7, at approximately 11:00 am,,
the licensee identified an event which occurred in the Unit 2 control room where the "At The Controls Area" was left unattended for approximately 15 seconds.
Prior to the event, the RO told the BOP operator that he was leaving the control room to get a cup of coffee.
The BOP operator acknowledged this and thereby accepted the responsibili-ties of the operator at the controls.
The SS who was on the Unit 2 side of the podium w en t to his desk on the Unit i side of the podium at about the satae time the RO went to get coffee.
The USS then told the BOP operotor that he was going to check a damper lineup on the OHVC panel, which is a back panel located behind the main control board and out of the "At the Controls Area".
At this time the BOP operator followed the USS to the QHVC panel and left the "At The Controls Area" unattended.
The SS completed his activities at the desk and then (noved back into the line of sight of the Unit 2 "At The Controls Area" and observed that no one was in this area.
The SS then immediately stepped down from the podium and into the "At The Controls Area" to confirm this.
As he was in this area the RO returned from the kitchen.
The BOP operator and USS returned shortly after the RO.
The licensee estirnates that the total time from the BOP operator leaving the "at the controls" area to the SS entering the area was 15 sec-onds.
There was no clear estimate of how long the BOP operator and USS were at the back panely but it was obviously a similar small time frame.
Interviews of the SS revealed that throughout the morning the BOP operator and the USS had been attempting to establish flow with one the auxiliary exhaust fans.
Apparently, the BOP operator became focused.on the HVAC system.
When the USS went to check the dampert lineup, the BOP operator followed to pass along information which he had developed earlier in the course of trying to solve the flow problem.
The inspectors reviewed the requirements for shift manning.
Procedure 10003-C, Manning The Shift, requirement 3.1 requires in part that at least one operator on the applicable unit shall be in the control room when fuel is in either reactor.
He shall remain in the "at the controls" area until relieved by another qualified Reactor Operator.
The "at the controls" area is defined in procedure 10003-C as the designated area, as shown in Figure 1.
10CFR50.54(k) also requires in part that a operator or senior operator shall be present at the controls at all times during the operation of the facility.
TS 6.2.2a Table 6.2-1 requires a minimum shift crew composition with both units in Mode 1 of 1 operations supervisor with an SRO, 1 SRO and 3 ROs.
The licensee exceeded TS limits at the time the event occurred.
I O
i 4-i i-i The' licensee reported this event as a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> notification and i
I will prepare an LER.
Corrective actions for this event included
]
a shift briefing for all.the shift crews.
The BOP operator was disciplined.
In addition, the licensee will conduct individual 4
i briefings with each RO to stress the importance and j
. responsibilities of operator at the controls duties.
The licens-ee will also review operator relief practices.
i.
This event is significant~because it represents instance of'a lack of awareness by a licensed reactor operator.
This event is aiviolation of 10CFR50.54(k) and TS 6.7.1a, Procedures and Programs, and is identified as violation 50-425/92-18-01, Failure r
Of Licensed Operator To Remain In.The "At The Controls" Area, i
t
?, -
i l
i 4
d 4
t j
I i
4 i
i
+
d 1
i 4
j i
i i-4 g
n
%cyMc G&tcaent Gn Pe< ence.
Sept. 61992 A/ac onen,&
.? BaImair I% nc
/bMd8d5&:" /
MS/wc&
fwa L. 4Cwo /
c Pc-41 A. S4//*W Cr/c-0.fM!dy di'd w.&.Husno'nc,
s pc.
?TA /Ye b o>us/d r G fc L4.. Gas /
Nac, gr C<e$
k & R.x. /
W Sk pfaltnsm. '
A:n x 'E km tu / a
+.
r 44.. C4s4./
oe/"n E,. c,.. 14 v.c., c1 l
\\ he? /DE srrs ccac rra /
Rip /nr /tvec Gjo s (A w '
N4cf rp grSweea gkn Jbgar/
Nac/t[ /DRP dwah W k fp'5h. mi. /
x ce/szr D.cew~ C1J 5 B J
d6 << e1 4 fc-h,e.k &
L. '
SfC f
hugsAuu' da l
T//cnR1 5 M426 tr
- SK
))a v/c/ ]?. Uj k eycu d. '
(?Pd-
/(p w f dcu ~
Gpc
,lYjYl.-
NS D.6.Qo?co,.
Nac.
A-L fW YSl p
.D.
ei hec +ec s/R.c,h R-E t 4 d5 NRl
/
W g%.v44 bE
, iae p,u. 8 9 l
Ya Mo,U fc-.-
[ S(<'c,
g ),/
f
~
/
arcs SnFF MOTES FACILITY:
b[oT f i
t] Propanel DATE: BOO $h2' fuerscL*;3 e%
EES t
Ene Cane CASE Bos Panel II EO:
Ff1)od Wm
] Oh DATE DDE TO 03:
Tavsef Peet#h i
R E0:
qw, 33%n M M INSPECTIW:
_ 52uk A 6deh INSPECTOR:
gj l
eg((4 SnaT:
/~60o TEmmi mESPONSIRLE DIVISIW:
j,gg RESPCESIBLE SECTlgN h
dhthi al cet f /to R4 SonaECri i
'I 4
d&C ht CA
%Rnu.L fs., Mn m EOTES:
c(wsc Mg u
l h5ldd.OdMb hWudad.
l d i n A e M it a t, (e k t -
Au -sW 4
m U M )- k n k. A h u u tr> Ir w M cu w u m s w
" k Alk%f t W w :
b6am imo. A;, y - At defud /%m. - < T 'c.37.Ap/baM l
Ns&s/ s.J pu l
Tf- $LJ, (, t,. st/s O'/dE, SLY W
Wb Dbc
, b OM f.g k _ Ib\\ dad
\\
d SG4 lb W k k.. ( %ih)fh i
/
/
y
- 6
-y 0
$ bb" MCO M t/lO aom l?gpd ff I %v b e v d a k ( e OLAD A
>h\\
Mb4' lA4 09h ! As/uira, /44rcufA..
i u
OE NOTIFIED:
SL:
SUPLENT:
CP:
EC SCHEDULED:
LOCATIN:
J (j
l l
,o E
a
!i 1.
IDENTIFICATION: (50% t 4)
{
}
i 4
i I
i i
i l
2.
CORRECTIVii ACTION: (50% t 4) {
}
i i
a i
3.
LICENSEE PERFORMANCE: (100% t. L)
{
}
a i
i L.
n 4.
PRIOR OPPORTUNITY TO IDENTIFY: (100 % i)
{
l' 4
i 4
S.
MULTIPLELOCCURRENCES: (100% t)
{
}
i 1
4 6.
DURATION: (100% t)
{
}
i 1
]
BASE CP:
SEVERITY LEVEL:
PROPOSED CP: 4 1
(
-.--m.
.,n.,
Q ; L e,; i p j k g u
^
)
4/67 0 -
j x-
[
g pLL
.l O
,e N ** hn N Mr ~
d'
,.i n
~~ e
-A M t -t& 4.ec " p g i
IC gr m
Bef 4 us (G
ase
^
C <t-+s& p 8 6 s
/c/
jwft-h et4A f
~a 4
/
g n
/
/
I s, )/
V[. C
/
V q
a f Vd' y e}ep p
/
p 4t i
Iy
Ij v'
4 i
!t AUG 241992 i
NOTICE OF SIGNIFICANT MEETING f
s Name of Licensee: Georgia Power Company i
Name of Facility: Vogtle Unite 1 and 2 j
Docket Numbers: 50-424 and 50-425 d
Date and Time of Meeting: September 8, 1992 at 12:00 p.m.
Location of Heeting:
Region II (RII) Office, Atlanta, Georgia I
Purpose of Meeting: An Enforcement Conference to Discuss the Failure of a Licensed Operator to Remain 1
1 in the Unit 2 "At The Controls
- Area.
a RII Cognizant Division:
Division of Reactor Projects 1
NRC Attendees:
l S. D. Ebneter, Regional Administrator, Region II (RII) i L. A. Reyes, Deputy Regional Administrator, RII j
E. W. Mershoff, Director, Division of Reactor Projects (DRP)
)
A. F. Gibson, Director, Division of Reactor Safety, RII i
A. R. Herdt, Chief, Reactor Projects Branch 3, DRP, RII l
P. H.. Skinner, Chief, Reactor Projects Branch 3, DRP, RII L. Wert, Senior Resident Inspector, Hatch, DRP, RII G. R. Jenkins, Director, Enforcement and Investigation 1
i Coodination Staff, (EICS), RII j
B. Uryc, Senior Enforement Specialist, EICS G. C. Lainus, Assistant Director for Region II Reactors, Office I
of Nucleai Reactor Regulations (NRR) l K. N. Jabbour, Senior Project Manager, Project Directorate II-3, i
NRR l
D. A. Seymour, Project Engineer, Reactor Projects Branch 3, DRP, j
R-II Licensee Attendees:
W. G. Hairston, III, Senior Vice President - Nuclear Operations l
R. P. Mcdonald, Executive Vice President - Nuclear Operations C. K. McCoy, Vice President - Nuclear, Vogtle Project j
i W. B. Shipman, General Manager, Nuclear Operations j
J. A. Bailey, Manager - Licensing g
Approved By:
M N
N Piered H. Skinner, t'hief-I Reactor Project Section 3B Division of Reactor Projects 4
l NOTE:
Attendance by NRC personnel, other than those listed above should be known by 4:00_p.m., September 4, 1992 via j
telephone call to D. A. Seymour, 404-331-5619.
f p
b
[ qws u n 29
AUG 241992 l,
Notice of Significant Meeting 2
Distribution:
J. M. Taylor, Executive Director for Operations J. H.
Sniezak, Deputy Executive Director for Nuclear Reactor Regulation Regional Operations and Research H. L. Thompson, Jr., Deputy Executive Director of Nuclear Materials Safety, Safeguards and Operations Support J. Lieberman, Director of Enforcement T. E. Murley, Director, Nuclear Reactor 1
j Regulations (NRR) i l
J. R. Goldberg, Assistant General Counsel for Hearings and Enforcement J.
G.
Partlow, Associate Director for Projects, NRR G.
C.
Lainas, Assistant Director for Region II Reactors, NRR 4
D.
B. Matthews, Director, Project Directorate II-3, NRR j
K. N. Jabbour, Senior Project Manager, Hatch, NRR J.
F. Wechselberger, Regional Coordinator, EDO 4
i bcc:
S.
D. Ebneter L. A. Reyes J. P.
Stohr E. W. Merschoff A.
F. Gibson R. J. Maley G.
R. Jenkins K. M. Clark A. R. Herdt VP. H. Skinner D. A. Seymour All NRC Attendees Receptionist RII RNl R
RI RI RI D
ur PSR' inner
$R Che ns AGi on PS hr 08/21/92 08/
/92 08/ 7(/92 08 g /92 08 92 08/2(/92 RII RII Ch hEMers;choff CEvans 08/7/92 084' 92 1
_ ~ _ _ _ _
i i'
I AUG 241992 i
)
Docket Nos. 50-424, 50-425 i
License No. NPF-68, NPF-81 Georgia Power Company
. ATTN: Mr. W. G._Hairston, III Senior Vice President -
l Nuclear Operations i
P.O. Box 1295 j
Birmingham, AL 35201-Gentlemen:
SUBJECT:
CONFIRMATION OF MEETING - ENFORCEMENT CONFERENCE -
VOGTLE This confirms a telephone conversation between Mr. W. G. Hairston of your staff and Mr. P. H. Skinner of-my staff on August 17, 1992, concerning an Enforcement Conference to be conducted at.the NRC Region II Office at 12:00 p.m., on September 8, 1992.
This meeting was requested to discuss the failure of a licensed operator to remain in the Unit 2 "at the controls" area.
Should you have'any questions regarding these arrangements, we will be pleased to discuss them.
Sincerely, hy d' ?'W!
Ellis W. Merschoff, Director Division of Reactor Projects
Enclosure:
Proposed Meeting Agenda cc w/ encl:
R. P. Mcdonald Executive Vice President Nuclear Operations P. O. Box 1295 Birmingham, AL 35201 C. K. McCoy Vice President-Nuclear P. O. Box 1295 Birmingham, AL 35201 cc w/ encl:
See page 2 h\\
e w,,,.
~ - -
AUG 241992
.4 Georgia Power Company 3
4 bec w/ enc 1:
S. Sparks, RII D. Hood, NRR
@. Skinner, RII A. Herdt, RII Document Control Desk NRC Resident Inspector
]
U.S. Nuclear Regulatory Conmission
)
P. O. Box 572 Waynesboro, GA 30830
't 4
.i 4
j i
b 4
RII l
RJ RII RI RI N
Ahi Johnson AGib en PStbhr i
DSeymour P
nner 08/%8/92 08/
/92 08/
92 08/24/92 08/ N/92 08/}4 /92 yy 1
t
1 s
ENCLOSURE 2
Proposed Meeting Agenda Georgia Power Company 12:00 p.m.,
September 8, 1992 b
A. Opening Renarks.
NRC/GPC B. General Discussion GPC 1.
Failure of a licensed operator to remain in GPC i
the Vogtle Unit 2 "at the controls" area.
2.
Root cause and corrective actions GPC C.