1 unn jg,g Wdk A dSIBLTQUwn cmMIN CALCUL n
j UUPY NO. /Y i l
z-._
y 1.1 The purpose of this procedure is to provide methods for 4
determining SHUTDOWN MARGIN to verify it is greater thr.n the limits of Technical Specifications 4.1.1.1.1 I
c; 4.1.1.2 as applicable.
l 1.2 Verification of SHUTDOWN MARCIN
- .s required:
a.
When in Modes 1, 2, 3, 4 or 5 within one hour after detection of an inoperable Control Rod and each 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter while the control Rod is
)
b.
Trior to initial operation above 5% Rated Thermal Power after each fuel loading.
i
(*
c.
When in Modes 3, 4, or 5 at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
~
1.3 This procedure also provides instructions for determining the Kaff of the reactor in its present state or predicting its value at future plant conditions.
2.0 APPLICABILITY This procedure.is applicable in Operational Modes 1, 2, 3, 4, 5 and 6.
t 3.0 PRECAUTIONS AND LIMITATIONS 3.1 Xenon Worth provided by refirence curves assumes equilibrium conditions prior to shutdown.
If plant was in a transient condition, obtain Xenon Worth from plant computer or calculate Xenon Power using the form provided by PTDB TAB 1.4.3.
3.2 If boration or dilution evolutions are or have been occurring, care shall be taken to ensure representative RCS boron samples are used for chemical analysis.
3.3 No credit is taken for Samarium reactivity since the negative reactivity introduced by Samarium 149 buildup is offset by an equal positive reactivity introduced by the buildup of Plutonium 239.
[
9611040096 960827 PDR FOIA KOHN95-211 PDR
.. =.
' PROCEDURE No.
g.,gyggeon p A.4E No.
VEGP 14005.
4 2 of 8 4.0 PREREQUISITES AND INITIAL CONDI,TIONS NONE 5.0 INSTRUCTIONS complete the appropriate Data Sheet (s) corresponding to plant conditions.
6.0 ACCEPTANCE CRITERIA i.
6.1 Modes 1 and 2 - CALCULATED SHUTDOWN MARGIN shall be greater than or equal to 1.3% delta K/K.
4 6.2 Modes 3, 4 and 5 - CALCULATED SHUTDOWN MARGIN shall be greater than or equal to REQUIRED i
Shutdown Margin specified by j
Technical Specification 3.1.1.2 Figures 3.1-1 or 3.1-2.
6.3 Mode 6 - CALCULATED Kaff shall be less than or equal to 0.95.
%e 1
9 9
i l
1 j
i tes**
renoctavas No.
sevr.oe
+ sus no.
VEGP 14005-4 4
3 of 8 3
7.0 EVAI,UATION AND REVIEW 5
7.1 Results obtained through performance of this procedure j
. meet ACCEPTANCE CRITERIA of Section 6.0.
j
[
YES
[ }.NO j
7.1.1 If NO was checked, immediately INITIATE and CONTINUE i
boration at greater than or equal to 30 gym of a solution containing greater than or equal to 7000 ppa boron or ec uivalent until the required Shutdown Margin is restorec. and NOTIFY the Unit $hift Supervisor (USS).
7.1.2 Comunents (include any abnormal conditions and corrective actions taken):
thr+ Saser 2.
c,,,,4rrro a
j u
canoe. W Mnorsnr t1tm swwr- (o 1) w
<:o-nerro.
norouw Som / Accec e' cairn A )
k vw heo. / M M /-to-Vs ID9 e
~
USS notified of Test completion and Results
/ /
Vfff//9 /Lo i
Initial
/Date Time i
Test Completed By:
// 9!ft / /9/(o signacure
/Date Time
//A/-/f-f 9 / /f/E
[ signature Supervisory Review Date Time
8.0 REFERENCES
j 8.1 Technical Specification 3.1.1.1, 3.1.L ? and 3.9.1 l
8.2
" Plant Technical Data Book END OF PROCEDURE TEXT i
4
renocsovas No.
tavissow
- asno VEGP 14005.
4 4 of 8 l"
j Sheet I of I s-i MH SEU 1 i
I i
SNUTDOWN MARCIN CALCULATION-REACTOR CRITICAL DATE TIME i
\\
j.
CVRRENT CONDITIONS REACTIVITY BALANCE i
la REACTOR I
15 POWER DEFECT
+
PCN j
(PTD5 TAB 1.1) i 2A 30RON INTRATION PPM i
23 CURRENT 300 WORTE l
3A ROD POSITI STEPS (PTDS TAB 1.5.1) +
PCM o
BANK 33 ASSUMED STUCK ROD WORTE
+
PCM 4A MOST REACTIV ROD WORTE PCM (value in 4A)
(PTDS TAB 1.5 2) 43 ACTUAL STUM ROD 5A NUMBER OF STU RODS WORTR l
(4A times SA)
+
PCM i
55 TOTAL 200 UDRTE 4
(BZP)
L (PTDS TAB 1.5.2)
\\
\\
YERIFT 1C IS A NEGATM NUMBER 1C SUN 18 thru 53 ()
PCM INIT i
i CALCULATED SEUTDOWN MARGIN Zdelta E/E (Divide absolute value of IC by 1000) i
~
R8 QUIRED SEUTDOWN MARGIN 1.3 Edelta E/K (Tech S ee 3.1.1.1)
P COMPLETED ST
/
/
SIGM&avaI
/
DATE
[ T s
j 4
4 A
M
. -.. -.. ~. -. -. -. -.. - -.. - _ _ - - _ _ _ -
l PROCEDumaNO.
AgvissoN et GE NO.
TEPG 14005-a 4
5 of a
~
T,g,-
Sheet 1 of 1
\\-
e l.
DATA SEEET 2 l'
SNUTDOWN MARCIN CALCULATION-REACTOR SUBCRITICAL USING FREVIOUS CRITICAL DATA l
CURRENT / PROJECTED CONDITION - Tsv5 2,557'T
~
l DATE det/S TDit /1.k NDDE 3
Daft m/n TIME OW OF MST SNUTDOWN PUMPS #
i -
CONDITIONS PRIOR TO SNUTDOWN REACTIVITY BALANCE l.
LA REACTOR POWER W
I 15 POUR DEFECT
~
(PTDB TAB 1.1)
+3dv FCN i
2A BORON CONCENTRATION
/ 778 PFM 28 BORON UDRM (FTDS TAB 1.3.1) +//Nc PCM 3&
IIN0N POWER
/oo I 35 ID0N WORM l
(IA IF EQUILIBRIUM)
(FTDS TAB 1.4.2) +ld757) PCM 1
~
4A RCD POSITION
/ N STEPS 45 300 WORTE S
(FTDS TAS 1.5.1) + /ov FCK BANE 1
I CURRENT /PROJik,4au CONDITIONS 1C suu is thru 45
+ M _PCM 1
l SA Tavy JPat) DEC F 2C ISO T MP DEFECT (PTDS TAB 1.2)
+ N/A PCM g
l u
30RON CONCuTRATION 835 PPM f,C 30B05 WORM i
(MDB TAB 1.3.1) - //,065f PCK 1
1A NUMB R OF E00RS
/
4C EENON EDRM j
Frow LAST sNUTDOWN (FrDs TAs 1.4.1 O
PCN 2
3C TOTAL BOD WORM (FTDB TAB 1.5.2) - (p$o? PCM i
84 NDST RELCTIVE 300 WORM No PCM 6C ASSUMED STUCK ROD (FTD5 TAB 1.5.2)
WORM
+ 39o PCM (value in 8&)
i m
NUusER OF STUCE BODS o
i 7C ACTUAL STUCE RCD WORTE
+ O PCN (GA times M)
TERIFT ID IS A NEGATIVE NUMBR MA4d 1D SUN IC thru 7C (-) [gado PCM' i
'mmt
-t.s tr CALCUMTED SEUTDOW MARCH lb,[sIdeltaE/E p,,, g j-
'(Divide absolute value of 1D by 1000)
REQUTRED SEUTDOW MARCIN 1 hI Edelta E/E (Tech Spec 3.1.1.2 Fig
.1-1 3 1-2)
ClarLETED BY
//
h
/ /9/3 sisaatuas
// saIs
/
Isaw.
d
- venne
,--e
l DmocamsmeNo.
navissow pace ua.
v2GP 14005 a 4
6 of a j*
g
,q Sheet 1 of 1 DAM SEH 3 Esif CALCULATION USING PREV 7OUS CRITICAL DATA CURRENT / PROJECTED CONDITIONS - Tav8 > 557'F l
DATE TIME DATE
\\ TIME OF LAST SNUTDOWN
\\
i amiLIT4vna PRIOR TO SHUTDOWN REACTIVITY RALANCE LA REAC10R OWER 2
15 POWER DEPECT j
(PTDs TAB 1.1)
+
PCM i
i 2A BORON CONC TION PPM 28 BORON WDATE 3
(PTDB TAR 1.3.1) +
PCM 3A IENON POWER 35 I D ON WORTE l
(IA IF EQUILIB (PTDS TAB 1.4.2) +
PCM i
i 4A RCD POSITION STEPS 45 RCD UDITE
{
(PDS TAB 1.5.1) +
PCM BANK l
cuniENT/PROJh,4e GQWDITIGWi IC SUN 18 thru 43
+
[
6A Tavs DEC 2C ISO TRIP DEPICT
\\
/
(PTDS TAB 1.2)
+ N/A PQi 7A
' BORON CONCINTRATION F1 3C BORON UDRTE f
1 (PTDB TAS 1.3.1) -
PCM a4 NUMB n 0F EOURS h
4C IEN3N WORTE PROM IAST SEUTDOWN (PTDS TAB 1.4.1) -
PCM 1
1 9A RCD POSITION STEPS SC 1 5 N0125 i
(PTDs TAB 1.5.1) -
PCM BANK 2
i YERIFT 1D IS A NEGATIVE NUMBER, m m i 1D SUN 1C thru 3C ()
PCM DIYDE ID i
by 100000
)
1 1
Eeff =
=
=
[
1-(walue in 2D) 1+(
)
I
-COMPLETED SY
/
/
EIGN& waE
/
DATE
/
TIME
M10CEDU8tf nog _
ngvieson
% 3gg.,g, j
VEGF 14005-1 4
7 og g l
Sheet 1 of 1 is DATA SEEET 4 SIUTDOW NARGIN,' Keff CALCULATION l
USING CRITICAL 30RON MDE 3
i DATE - 1949 TIME l9J3 FUMPS e
i wmRENT/ PROJECT GmLITIONS REAcTi m T SALANCE i
v 1A RCS TEMPERATURE 6'i7 DIG F
^
{
- t 174 9 FW l
CONCENTRATION I.333 PFN BORON 90 RTE l
(FTDS TAB 1.3.1) 3A CRITICAL BORON i2.60 ?PN 28 CRITICAL
+ 1 I 7 5" FCK i
CONCENTRATION BORON UDETE (FTDS TAB 1.3.2)
(PTDB TAB 1.3.1) l l
4A EENON F0WER 90 I
38 EENOW UORTE
- 3GIi PCM i
(Ra POWER AT TRIP (FTDS TAB 1.4.1)
IF Equitranraw) i SA NUusIR OF l
STUCK Roos O
4 u
v0RTR Or MOsT As ACTUAL STUCK
+
o Fm REACTIva ROD ROD uGR2s I
(PTDS TAB 1.5.2) 770 FCN (SA tiase u) 4 i
1C snN 1s
(-) virr FCu VERIFT 1C Is A NEGATITI NUMBER CM thru 48 zu m AL 2C DIVIDE 1C by 100000
- N4 CALCULATED SEftDOW MARGIN
"/./V Edelta K/K (Divide eboolste inlee of IC by 1000)
REQUIRFD SEDTDOW MARGIN
"'/.1t Idelta K/K
,(Tech Spec 3.1.1.2 FIG 3.1-1 or 3.1-2) 1 1
=
=
Al A Eett u 1-(value ta 2C) 1+(
)
REQUIRED Eeff (Tech Spec 3.9.1 Mode 6 only) 5.0.95 Ct3WLETED BY [4Il fil/ / /-2.e-#1
/ /337 f'
B r = =-- u u mm W f
HATE f_ TIMF FC3ed f'
1 pnocsouns No.
pavissoN PAgt NO.
YECF' 14005-1 4
8 of 8 m
Sheet 1 of 1 DATA SHEET 5 Esff CALCULATION USING CRITICAL 30RON
~
FROJECTED CollDITIONS Tavg 1557'F DATE TIME MODE CURRENT /PROJECI D CGNv!TIONS a
TIVITY BALANCE 1A RCS TEMPERA
,,DEC F 2A RCS BORON FFM 15 RCS FCM CONCENTRATION BORON WORTE (PTDS TAB 1.3.1) 3A CRITICAL SORON FFM 23 CRITICAL
+
FCM CONCENTRATION BORON WORN (FTDB TAB 1.3.2)
(PTDS TA3 1.3.1) 4A IENCE F0WER E
38 IENON Il0 RTE FCM (as F01ER AT TRIP)
\\
(PTDB TAB 1.4.1)
IF EQUILIBRIUM)-
48 TOTAL RCD
+
FCM 1
1101 5 l
0 f-(FTDS TAB 1.5.2)
I
/
5A ROD FOSITION 11 8Q 55 ACTUAL ROD FCM WORTE l
IJ (PTDB TAB 1.5.1)
- s. '
i 4
64 ii0 RTE OF MMT 69 STU M R 3 INRTE FOf REACTIVE ROD ASSUMED IN 25
\\
(value la 6A)
(FTDS TAB 1.5.2)
FCM f
()
FCM i
YERIFT 1C IS A NEGATIVE Ntasaan thru 68 M
j DIY ME IC by 100000 i
l 1-1 i
Esff =
=
=
i' 1-(value la 2C) 1+(
)
j COBE'LETED BY
/
/
~
sIsukavaE
/
DATE
/
TDit 1
{-
NOTE:
If rods are in asa-sequential position for t t Furposes, modify the above data as follows j
l 1.
Describs sod configuration in 5A.
l 2.
Eater worth of withdraun rods is 45.
3.
Enter sero in 55.
4 f
-..- - -. -.-.- --..-..--.~.-.-.-.
l l
IAoCEDUAE No GAv@oN esag no VEGF G0306-c 14 32 of 43 a
manna ars
./
IWRifl0 CMCE, 5HEET CLEARANCE i /-1131/
$~
Equipment / System / Number: 2e Eleb MakA UL tzos
- u. -
Reason Tor GMtarance: ht.,l.-
EM a/
era w uoP r un.
,[ ;
Estimated Outag'[ Time:
A/A Work Order #
- 4 Requested Date/ Timer Al /4 Needed Date/ Time:
4 /e Requesteif by:
-GL Les Extension:
.fel I'
No Yes 1 Involves Tech. Spec. or Safety-Related Item:
Locked Valves: No_ Yasi Frepared By CT,/fr Fire Protection Impaired No i Yes Reviewed By /0 /674 7 Date: /O'f/-Y Time's. M ft/J.
Authorized by:
A inscalled by: Nd(4d Date -@ f [
Simes fW
_3 Date: D-/f*W Time:l/t753 Verified by: fdbW////A-)d2%/
SU5 CLEARANCES GROUNDING DEVICES VERIFIED REMOVED NAME ih...
,,,.y*ig
[
AND SUSCLEARANCE t-spac.g ; j Printed in I fl RELEASED BY:
Sinnature n second space PRIntu AND 5IGNATURE
~WORKTr." En DATE TIME SIGNATURE DATE TDE
- 1. \\\\
/
,,y 3.
$ QthCN, Y~
1 -\\
As.s s n
N
,.m. '
[
j 7
N 5.
W V
Subclearance Continuation Sheet Attached?
Tes NO CLEARANCE RDt0 VAL:
Authorized byr
' # Dater ilMM Time:
07/0 o'
l
. Removed by:
[1 dU dhd
^' Dates // /r-PYTimes 0 9dd.
)
Verified by: r7/8d
" Dater //-/ N I Time: 6 f/O FRONT Fihre 3a (I
ICAL) 1
1
)
l 1
3
4 3
M g
f 43
~
~
~
~
~
~
S 1 L 4.. *,J s '
=2 E'
E S %
- ~
1
+-
it:
e
't m
l:
2 M.
y k u
e
.s.w & d
===.: W p j.
a:
8e 4 4a a
- L3 d m 4 b d
,}l E
..f g
s Q
n h
I N
=
~
~
~
~
~
~
~
~
~
~
~
i e-j w
m v v u
,e J.l a J a 3 ess
.w S
j
~
4 w
5 i
E s
& d
't 1 4 E.
z f
k d i
a u s
=
J j
x M
4 2
a 1
s P 4
=
I J 4 4 i
5 3
l 3 o
4 I 2
~
4 r
J 2
d 3 k 2 3
I "
R 2
=I g
i o
i 1 3 E Eg g; e i
g ]
~
~
T 'a =s>t @'
0 i
n y.
a J
i 4
-l-
,g
=
I l i r r 1
a
~
se u
W s
M g7 eu n r k a
r-O U
% x 1
u s
C E eDik? 4 kkkk kd
- -.