Forwards Updated Gantt Chart Depicting Major Milestones for 10CFR2.206 Response by NRR ,summary of Plant Status as of 910918 & Updated Draft of Partial Directors Decision from Fourth Meeting on 910918
ML20129H691
Person / Time
Site: Vogtle  
Issue date: 09/25/1991
From: Matthews D
Office of Nuclear Reactor Regulation
To: Hayes B
NRC OFFICE OF INVESTIGATIONS (OI)
Shared Package
ML082401288 List: ... further results
References
FOIA-95-211 2.206, NUDOCS 9611040009
Download: ML20129H691 (9)


Text

_ - --. -.. -

~-

1 s-(*

, SENSITIVE - PRE-DECITIONAL INFORMATION-INTERNAL. DISTRIBUTION ONLY

[

v.

/

y/

i

^

September 25, 1991 L

NOTE TO:

Ben B. Hayes, OI James Lieberman, OE i

i Stewart D. Ebneter, RII Lawrence J. Chandler, OGC FROM:-

David B. Matthews, NRR i

SUBJECT:

FOURTH MEETING OF THE VOGTLE 2.206 COORDINATING l

GROUP The fourth meeting of the 2.206 Coordinating Group was held in Atlanta on Wednesday, September 18, 1991, to discuss activities l

underway throughout the agency related to Vogtle.

The following i

individuals were present:

D. Matthews, NRR/PD2-3 (Chair)

D. Murphy, OI/HQ A. Herdt, RII/DRP B. Hayes, OI/HQ J. Milhoan, RII/DRA (part time)

J. Luehman, OE J. Vorse, OI/RII D. Hood, NRR/PD2-3 R. Hoefling, OGC (legal adviser)

P. Skinner, RII/DRP G. Lainas, NRR/ADR2 S. Vias, RII

! is an updated Gantt chart depicting major milestones for the 10 CFR 2.206 response by the NRR Office Director, dated September 10, 1991.

Enclosure.2 summarizes the Vogtle 2.206

~

status as of September 18, 1991. is an updated draft of the Partial Director's Decision dated September 17, 1991.

Copies of these enclosures were provided to those present.

~;

Please note that this information is sensitive and predecisional, and that distribution should be limited and confined only to the NRC staff.

The proposed Partial Director's Decision (Enclosure 3) would resolve nine (9) of 28 issues in the initial Petition.

These are t

. Sections II.b, III.1, III.2, III.5, III.6b, III.6c, III.6e.iii, and III.8 (consisting of two separate issues).

Seven of the nine issues (all but III.1 and III.2) will be discussed in proposed Inspection Report 90-19, Supplement 1 (formerly IR 90-XX), once issued.

No decision for these seven issues can be issued until the inspection report has been issued and received by the licensee.

Mr. Matthews noted that delay in issuing the inspection report has impacted the September 27 schedule for issuing the Partial Director's Decision, and that a request for extension must now be prepared by NRR/PDII-3.

A conference call with RII, OE, OI, OGC and NRR will be scheduled promptly to-

~'

SENSITIVE - PRE-DECISIONAL,INFORMATION-INTERNAL JISTRIBUTION ONLY u

sD'

\\

7/' /

9611040009 960827 PDR FOIA KOHN95-211 PDR

SENSITIVE

~ PRE-DECISIONAL INFORMATION-INTERNAL DISTRIBUTION ONLY resolve final comments on the inspection report.

(The call is presently scheduled for 3:00 pm, September 26, 1991).

The group discussed the draft Commission Paper prepared in the form of a negative consent paper regarding issue III.2 which alleges that a material false statement was made during the Commissioner's meeting on Vogtle Unit 2 licensing.

Mr. Luehman reported that the draft input from OE, discussed at the last

- meeting, was not forthcoming.

The discussion focused upon the need for the paper and alternative approaches.

Following the discussion, Mr. Matthews indicated that, following certain specified changes, NRR will proceed expeditiously with the 1

earlier decision to process the Commission Paper.

Several items identified during the previous meeting were Lreported to be.in process.

These include (1) resolution of legal and policy-issues associated with the draft decision for issue III.1 (as. attached to previous meeting summary dated August 13, 1991) which alleges an illegal transfer of the Vogtle licenses to SONOPCO;-(2) actions associated with assignments for the July 8th amendment to the petition; (3) cross-references between the 2.206 Matrix Table and OI's list of allegations, including the associated review for potential additional assignments; and (4).a chronology for NRC's handling of tapes.

Mr. Hayes discussed OI's priorities and a scheduled _ visit to the Vogtle site in le.te September.

The visit will include discussions with the NRC Resident Inspectors.

The. Group Chairman discussed recent.NRC internal meetings to

' consider the four responses of August 28 and 29, 1991, to the NRC's Demands for Information.

An Enforcement Conference on the issue of chemical injection (Issue III.6a) was noted to be i

scheduled for September 19th and would involve NRC's senior management levels, including the Deputy Executive Director for NRR, Regional Operations and Research.

The Group Chairman will brief senior management on the 2.206 effort during the visit for i

the Enforcement Conference.

1 The Group was requested to provide their comments on the draft Partial Director's Decision (Enclosure 3) promptly in order that i

NRR can begin the concurrence process during the week of

. September 23rd.

The next meeting of.the working group will be S'ENSITIVE-PRE-DECISIONALJNFOMfIONeINTMLgIBUTIoH ONLE~

v l

r-.

-m

.~

'{

SENSITIVE - PRE-DECISIONAL INFORMATION-INTERNAL DISTRIBUTION ONLY scheduled by the Group Chairman at a later date, based upon results of the concurrence review.

[.

Day d B. Matthews, NRR

Enclosures:

b-

1. Milestone Chart dated 9/10/91
2. Vogtle 2.206 Status dated 9/18/91
3. Draft Partial Director's Decision dated 9/17/91 cc:

J. Sniezek, EDO D. Hood, NRR T. Murley, NRR P. Skinner, RII F. Miraglia, NRR S. Vias, RII J. Partlow, NRR J. Milhoan, REE J. Goldberg, OGC B. Uryc, RII D. Murphy, OI G. Jenkins, RII S. Varga, NRR L. Reyes, RII G.

Lainas, NRR E. Adensam, NRR D. Matthews, NRR J. Vorse, OI

{

R. Hoefling, OGC J. Luehman, OE R. Rosano, OE A. Herdt, RII F. Allenspach, NRR 1

[

[.

SENSITIVE - PRE-DECISIONAL INFORMATION-INTERNAL DISTRIBUTION ONLY I

Oill(5tdAL TD

_.g_,gg, m

'T INV0 ICE MN B

W-Nlies Spring St.,

Ste. 750 g

r Mr..Bruno Uryc Atlanta, GA 30389 Nuclear Regulatory Commission (404)'876-8979

^

'191 Marietta Street 1

Suite 29OO INVOICE NO.

DATE Atlanta, GA 30323 144455 89/27/91 w

A E

t.D. 858-1300004 (404) 331-4192 JOBe JOB DATE Mt K M IEM(S)

CASE NUMBER CASE CAPTION 1

F 28768 09/19/91 BROWFO Nuclear Reg. Conf.

THE ORIGINAL AND 1 COPY OF THE TRANSCRIPT OF In Re: William F.

Kitchens THE ORIGINAL AND 1 COPY OF THE TRANSCRIPT OF In Ret Georgia Power n=======

TOTAL DUE

))))

1,339.35 l

I i

t l

i N

I

\\

Yba l

m yQ'h -

4

!(

DISCOUNT:

84.35 PAY THIS AMOUNT: 1,255.00 IF INVOICE PAID BY: 10/27/91 i

L T E*.I C E***. *. Z E s% " a ~w.J.,6,$E7% Z VMTE - ORIGINAL GREEN-REMITTANCE COPY BLUE-FILE COFi _,

- u.-.

2 m

u A e-

c

?

\\

s 4

8 PLANT VOGTLE UNIT 1 RHR EVENT OCTO9CR 1991 1

3 800 1, Pump discharge alipsed to IES

2. Flaw secured and pep stopped l
3. Pump started to fill IES

}

4. Pump section sunligned to ES l

d I

6m -

j

5. Pimp section realipsed to Inf5T to fill ES i

S00 -

)

I (s

3 4

l 400 -

\\

^ ^ 'u ' d r T ki" o

P

'll T1T 'JP y 300 -

2^

200 -

1 100 -

ll i lI ll 0 _

-60

-SS

-4%

-40 35

-30

-25

-20

-1S

-10

-S 0

TlWI - WINUTE$ - [VINT BE0AN AT *S2 WIN RNR TRAIN A FLOW PLANT VOGTLE UNIT 1 RHR EVENT OCTOBER 1991 4.5

1. Cavitation begins 4-
2. Flow tuduced to sintflow e

1

3. Cavitation occurs at 2000 EMI 3.5 -

3 2.5 -

ll

  • 8z 2-0 Y,y& io o...a t L iu mtLJii.auh.L a

,v.

-w.-

i.s~.,

'~

tM 0.5 -

0

-60

-55

-50

-45

-40

-35

-30

-25

-20

-15

-10

-5 0

gh TlW[ - WlNUT[5 = [V[NT 8[0AN AT *S2 WIN 1

I RNR TRAIN 9 FLOW

/

l s

PLANT VOGTLE UNIT 1 RHR EVENT OCTOBER 1991 260 l

N

[5 240 -

4 6

V 220 -

200 -

1. Possible ladication of redw=d fr$H I
2. ES pumpdoes secured as discharge 160 -

is realigned to ES

~

3. Pump stepped g
4. Pump started to fill ES E
5. Pump section realipsed to ES 120 -

2

6. Pump section reallysed to IRIST to

'00 -

f111 ES.

80 -

60 -

r 40 -

20

-60

-55

-50

-45

-40

-35

-30

-25

-20

-15

-10

-5 0

TiWE - WINUTES - EVENT SEGAN AT ~52 WIN RHR TRN A Ot3 PRES $

PLANT VOGTLE UNIT 1 RHR EVENT OCTOBER 1991 200 -

3 Ch 190 -

iso -

P 5

170 -

160 -

3

1. Cavitatices begins 3 3, _
2. Peup en miniflou l

i40 -

3. Pimp fleering at 400 M i30 -
4. Cavitation occurs at 120 -

i 9

110 -

2500 598 E

100 -

5. Flow at 1800 591 90 -

80 -

70 -

4

.0 =..,

50 -

40 -

gW 30 -

I) 20 -

10 -

O

-60

-55

-50

-45

-40

-35

-30

-25

-20

-15

-10

-5 0

TlWE - WINUTES - EVENT SEGAN AT ~52 WIN RHR TRN 9 Ot$ FRE$$

4 PLANT VOGTLE UNIT 1 RHR EVENT i

OCT08tR 1991 89 88 -

i 3_

1. Pimp section er -

altpeed to latST 86 -

2. % section as -

g a11 pied to ACS e4 -

4

3. Pimy suction o3 _

alipsed to lef5T.

82 -k j

as -

5 80 -

79 -

2 78 -

77 -

76 -

75 -

74 -

73 -

72

-60

-SS

-50

-45

-40

-35

-30

-t$

-20

-15

-10

-5 0

flWE - WINUTES - [ VENT SCGAN AT ~$2 WIN TRN A NX lN T[WP i

PLANT VOGTLE UNIT 1 RHR EVENT OCTOBER 1991 108 106 - 1. CRVitat105 begies 3

104 - 2. RCS recirculation flow 102 -

tait 1ated at 400 WH

3. RCS rectreslation flow at ion.

to -

96 -

94 -

92 -

s-g 90 -

88 -

86 -

r.t gg 82 -

so -

1 2

78 -

76 -

74

-60

-SS

-50

-45

-40

-35

-30

-25

-20

-15

-10

-5 0

TlWE - WINUTC$ = EVENT BEGAN AT *$2 WIN TRN 0 NX IN TEWP

s PLANT VOGTLE UNIT 1 RHR EVENT OCT09[R 1991 80
1. Flow reduced to stop pump
2. Pump stopped
  1. ~

3

3. Pump started to fill 11C5 g

60 -

j M-4 1

i i

    • ~

%Q u

u i

30 -

3 1

20 -

2 10 1

J 0

i

-60

-55

-50

-45

-40

-35

-30

-25

-20

-15

-10

-5 0

TlWE - WINUT[$ - [V[NT BCCAN AT ~52 WIN i

RHR TRAIN A CURR[NT r

PLANT VOGTLF_ UNIT 1 RHR EVENT OCTOSCR 1991 l

55 i

1Ms cerve is same as flow curve.

i 50 -

l 45 -

)

'0

~

- ^^

35 -

i i

30 -

l 25 -

-w. e.

1 20 -

15 -

10

-60

-55

-50

~45

-40

-35

-30

-25

-20

-15

-10

-5 0

TlWE - WINUT[$~w1Y[NT BCGAN AT ~52 WIN RHR TRAIN O CURRENT a

U.S. NUCLE AR REGULATDAY COMMIT $lON lNRC PORM 361 OPER ATIONS CENTER EVENT NOTIFICATION WORKSHEET GOULD

  1. 22177

{

NOTif ICATION TIME F ACILIT Y C R ORGANIZATION UNIT CALLE R'S NAME CALL 8ACK s : ENS o, i4 04 iS51_ 676 2 1359 EST VEGP 1

B.

D.

CARTER fvkNIleME4 ZONE EVEN1 DATE tvl Lost Ottsite umms AEM 1 He Non Emergency 10 CFR 60.72(bH1) g 2235 10/26 /91 wiAi TS Raouired S/D ASHU Iv0 Tanic Gas ACHE

'OWER/ MODE BEFORE POWER / MODE AFTER bH8) TS Deviaten ADEV Iv0 Red Release ARAD be)

Degraded Conditen ADEG Ivil Otn Hampering Safe Op.

AHIN i

0%/6 0%/6 biHAi unansivred Condition AuNA bill 8 f Outode Design 8ases AOUT EVENT CLASSIFICATIONS biHCl Not Covered t,y ops /EPs ACNC b)

Degrace WMe S/D ADAS GENEnALEMERGENCY GEN /AAEC bid Earthouake ANEA 60 RPS Actuat.on lacromi ARPS SITE ARE A EMERGENCY SIT /AAEC bed F 6ood ANFL bd ESF Actuation AESF ALE RT ALE /AAEC bid Hurricane ANHU beill A) Sate S/D Capabihty AINA UNUSUAL EVENT UNU/AAEC tied ice / Heil ANIC X

bi H8) RHR Capsbslaty AINB 3 60.72 NON EME RGENCY tme awar co/urnns/

bu)

Ligntnmg ANL1 bisHC) Controlof Red Release AINC O

FHYSICAL SECURITY (73.71)

D???

bey Tornado ANTO luiHD) Acceent Mete 9 sten AIND J

T R ANEPORT ATION NTRA bed Oth Naturel Phenomenon ANOT hvHA) Aer Reisese > 2X App 8 AAIR 20/ 03 M ATE RI AL/E XPOSURE 8???

bv)

ECCS Discharge to RCS ACCS bv)l8) Lie Release > 2x App 8 ALIO OTHER NO AM.N LCO.N8 N L,NIN F.N LT R.NON R Iv)

Lost ENS AENS M

Offsite Medical AMED 1

CDEF, FLOM, ElRR GCON (v)

Lost Emerg Assessment AARC tvd Ottsste Notificaten APRE

)

DESCRIPTION AS A RESULT OF TECHNICAL REVIEWS AND ANALYSIS OF CIRCUMSTANCES SURROUNDING VORTEXING CONDITIONS FOR THE "B" TRAIN RER PUMP i

DURING CAVITY DRAINING ON SATURDAY OCTOBER 26, 1991, GPC HAS DETERMINED THAT THE "A" RER PUMP MAY HAVE SHOWN SIGNS OF DE-GRADED PERFORMANCE DUE TO POSSIBLE LACK OF ADEQUATE LEVEL TO PREVENT VORTEXING.

AT THE TIME OF THE EVENT, UNIT WAS IN MODE 6 AFTER REFUELING AND THE REFUELING CAVITY WAS BEING DRAINED TO JUST BELOW THE REACTOR VESSEL FLANGE FOR PLACING THE VESSEL HEAD.

"B" TRAIN I

RER WAS PROVIDING SHUTDOWN COOLING AT APPROXIMATELY 3000 GPM, WHILE THE "A" TRAIN WAS BEING USED TO SLOWLY LOWER LEVEL.

l BASED ON THIS NEW INFORMATION FROM THE POST-EVENT CRITIQUE, WHICH WAS NOT AVAILABLE TO CONTROL ROOM OPERATORS AT THE TIME OF THE EVENT, GPC NOW CONSIDERS THIS REPORTABLE UNDER 10 CPR j

50.72(B) 2.iii (B).

c.s,.*,

y 0]fNOg 4

Includa: Svstems effected, actuatens 8 their metisting signals, causes, effect of event on plant, actens taken or planned, etc.

NO TIF ICATIONS YES NO WILL 8E ANYTHING UNU5UAL OR NQ1 UNRtHMUVUt YES NO N3C f;ESIDENT X

(Empha m w/

X NO l

STATE (si X

DID ALL SYSTEMS FUNCTION AS REQUIRED?

g ygg (f*8*" * *I l

LOCAL X

OTHER GOV AGENCIES X

MODE OF OPER ATION ESTIMATE FOR ADDITION AL INFO X

UNTIL CORRECTED:

6 RESTART DATE: UNKOWN ON 8ACK7 NO MFD' A *~f SS RElf ASF meme som sei insei

-