ggy 41992 NOTICE OF SIGNIFICANT MEETING Name of Licensee: Georgia Power Company Name of Facility: Vogtle Electric Generating Plant, Units 1 and 2 Docket Nos.: 50-424, 50-425 Date and Time of Meeting: May_13, 1992,'at 2:00 p.m.
Location of Meeting: Region II Office, Atlanta, Georgia Purpose of Meeting: An Enforcement Conference to discuss the events surrounding
. a surveillance performed on January 28, 1992, by two Instrumentation and Control (I&C) technicians.
Region II Cognizant Division:
Division of Reactor Projects NRC Attendees:
S. D. Ebneter, Regional Administrator', Region II (RII)
J. L. Milhoan, Deputy Regional. Administrator, RII L. A. Reyes, Director, Division of Reactor Projects (DRP)
A. R. Herdt, Chief, Reactor Projects Branch 3. DRP, RII P. H. Skinnt, Chief, Reactor Projects Section 38, DRP, RII B. R. Bonser Senior Resident Inspector, Vogtle, DRP, RII G. R. Jenkins, Director, Enforcement and Investigation Coordination Staff, RII G. C. Lainas, Assistant Director, Division of Reactor Projects I/II, Office of i
NuclearReactorRegulation(NRR)
D.B.Matthews, Director,ProjectDirectorate(PD)II-3,NRR i
~ D. S. Hood, Project Manager.. PD II-3, NRR
--L-icensee Attendees:
- - - ~
R. P. Mcdonald, Executive' Vice Presidert. Nuclear Operations
'W. G. Hairston,:III, Senior Vice President, Nuclear Operations C. K. McCoy, Jr., Vice President Vogtle' Project W.- B. Shipman, General Manager,. Nuclear Plant NOTE: Attendence by NRC personnel'at this Enforcement Conference should be-made known by May 8, 1992, via telephone to S. Sparks at FTS 841-5619.
4
$f) i Approved V:
/W Pierce H. Skinner, Chief Reactor. Projects Section 3B Division of Reactor Projects Distribution:- (See page 2)
~
9611040043 960827 PDR FO!A KOHN95-211 PDR-
.=.
i Notice of.Significant Meeting 2
Distribution:
J. Taylor, Executive Director for Operations J. Sniezek, Deputy Executive Director, NRR H. Thompson, Deputy Executive Director for Nuclear Materials Safety, Safeguards and Operations Support G. Lainas, Assistant Director for Region II Reactors NRR J. Lieberman, Director, Office of Enforcement J. Goldberg, General Counsel for Hearing and Enforcement D. B. Matthews, Director, Project Directorate II-3, NRR D. Hood, Project Manager, NRR J. Wechselberger, Regional Coordinator, EDO 1
9 I
o NOTICE OF SIGNIFICANT MEETING Name of Licensee: Georgia Power Company i
Name of Facility:
Vogtle Electric Generating Plant, Units 1 and 2 j
Docket Nos.: 50-424, 50-425 Date and Time of Meeting: May 13, 1992, at 2:00 p.m.
Location of Meeting: Region II Office, Atlanta, Georgia I
Purpose of Meeting: An Enforcement Conference to discuss the events surrounding a surveillance performed on January 28,1992, by two Instrumentation and Control (I&C) technicians.
Region II Cognizant Division:
Division of Reactor Projects NRC Attendees:
S. D. Ebneter, Regional Administrator, Region II (RII)
J. L. Milhoan, Deputy Regional Administrator, RII L. A. Reyes, Director, Division of Reactor Projects (DRP) r A. R. Herdt, Chief, Reactor Projects Branch 3, DRP, RII P. H. Skinner, Chief, Reactor Projects Section 38, DRP, RII B. R. Bonser, Senior Resident Inspector, Vogtle, DRP, RII G. R. Jenkins, Director, Enforcement and Investigation Coordination Staff, RII G. C. Lainas, Assistant Director, Division of Reactor Projects I/II, Office of Nuclear Reactor Regulation (NRR)
D.B.Matthews, Director,ProjectDirectorate(PD)II-3,NRR D. S. Hood, Project Manager, PD II-3, NRR Licensee Attendees:
l R. P. Mcdonald, Executive Vice President, Nuclear Operations W. G. Hairston, III. Senior Vice President, Nuclear Operations C. K. McCoy, Jr., Vice President, Vogtle Project W. B. Shipman, General Manager, Nuclear Plant NOTE: Attendence by NRC personnel at this Enforcement Conference should be made known.by May 8, 1992, via telephone to S. Sparks at FTS 841-5619.
Approved by: Pierce H. Skinner, Chief Reactor Projects Section 3B Division of Reactor Projects Distribution:
(Seepage 2)
Notice of Significant Meeting 2
Distribution:
J. Taylor, Executive Director for Operations J. Sniezek, Deputy Executive Director, NRR H. Thompson, Deputy Executive Director for Nuclear Materials Safety, Safeguards and Operations Support G. Lainas, Assistant Director for Region II Reactors, NRR J. Lieberman, Director, Office of Enforcement J. Goldberg, General Counsel for Hearing and Enforcement D. B. Matthews, Director, Project Directorate II-3, NRR D. Hood, Project Manager, NRR J. Wechselberger, Regional Coordinator, EDO bec:
S. D. Ebneter J. L. Milhoan l
A. F. Gibson L. A. Reyes J. P. Stohr G. R. Jenkins K. M. Clark All NRC Attendees on Notice Docket File 4
E R
P RII f
RII P
RI -
SSparks PJk< nner Alderdt J
ins
//4/92 J/4 /92 J/1/92
.$/g 92 9
~-
[g * %
wm.w....u
'o,
%E AR REGULATORY COMMISSION
/
'[
e cEGION il
}
r yy l
101 MAlltTT A STREET, N ty,. SulTE 2000
- ~
't#
f, f
ATLANTA, GE0*GIA 30323 g
7
'*...../
MAY 51992
' Docket Nos. 50-424, 50-425
. License Nos. NPF-68, NPF-81 EA 92-041
,L Georgia Power Company 1-ATTN: Mr. W. G. Hairston, III Senior Vice President -
i Nuclear Operations 1
P. 0. Box 1295-
~
Birmingham, AL 35201 4
Gentlemen:
4
SUBJECT:
CONFIRMATION OF MEETING'. ENFORCEMENT CONFERENCE 4
V0GTLE UNITS 1 AND 2 4
l~
iThis letter confirms the telephone conversation between Mr. A. R. Herdt of sqy staff and Mr. C. K. McCoy of your staff concerning an Enforcement Conference h
to be conducted at the NRC Region II Office at 2:00 p.m. EDT, on May 13, 1992,
- This meeting was requested to discuss the events surrounding a surveillance p
performed -on January 28, 1992, by two Instrumentation and Control (IAC) technicians.. Your staff reported to the NRC that the technicians failed to properly follow the surveillance procedure and subsequently created the data that:was entered on the calibration data sheet.
This event is discussed in NRC Inspection Report 50-424,425/92-02.
The NRC requests that your staff be prepared to discuss the chronology of events, the adequacy and depth of licensee management's investigation and review. the extent of corrective actions taken to preclude.similar events and assure previous similar events have not. occurred.
In addition, the NRC requests that -the two !&C technicians involved with this issue attend the Enforcement Conference.
Please be advised that the recent revision to 10 CFR
.Part 50.5, Deliberate Misconduct, as documented in 56 Federal Register 40,664 (August 15,1991), may have implications for the two I&C technicians involved L
J in this issue. This Enforcement Conference will be transcribed.
j Should-you have any questions regarding these arrangements, we will be pleased to discuss them.
y
+.
Sincerely, g
/
//
g
.(
Luis A. Reyes, actor
-I Division of Rea tor Projects cc: -(Seepage.2) 0 g/
7 SY Ty.'
4 MAY 51992
't Georgia Power Company 2
cc:
R. P. Mcdonald Executive Vice President-Nuclear j
Operations Georgia Power Company P. O. Box 1295 Bimingham, AL 35201 C. K. McCoy Vice President-Nuclear s
Georgia Power Company P. O. 1295 Bimingham, AL 35201 W. B. Shipman General Manager, Nuclear Operations Georgia Power Company
{
P. O. 1600 j
Waynesboro, GA 30830 J. A. Bailey i
Manager-Licensing Georgia Power Company P. O. Box 1295 Bimingham, AL 35201 Nancy Gibson Cowles Consumers' Utility Counsel Office of Consumers' Utility Counsel 84 Peachtree Street, N.W., Ste. 201 Atlanta, Georgia 30302-2318 Office of Planning and Budget i
Room 615B 270 Washington Street SW Atlanta, GA 30334 Office of the County Commissioner j
Burke County Commission Waynesboro, GA 30830 Harold Reheis, Director Department of Natural Resources j
205 Butler Street, SE, Suite 1252
)
Atlanta, GA 30334 (cc cont'd - see page 3)
MAY 51992 Georgia Power Company 3
P cc:
(Continued)
Thomas Hill, Manager Radioactive Materials Program Department of Natural Resources 4244 International Parkway Suite 114 Atlanta, GA 30354 Attorney General Law Department 132 Judicial Building Atlanta, GA 30334 Ernie Toupin, Program Director of Power Production Oglethorpe Power Corporation 2100 East Exchange Place Tucker, GA 30085-1349 Charles A. Patrizia Esq.
Paul, Hastings, Janofsky & Walker 12th Floor 1050 Connecticut Avenue, NW Washington, D. C.
20036 5
e i
h*
FAC'IMILE TRANSM. TTAL
/
U. S. NRC - RII ATIANTA, GA bEEMAN
{
TO:
N.
SUBJECT:
. 64 N((N DATE/ TIME:. 05068>2:1655 Iin4: Tabtvieu o.re 1m.34eJujeJ OE
./ ipr "THut.5'b44 - 4 Nftevesass i
8/926-3431 h,2/ cywe, dm -furd areud m
" f' r' % c,r's M.'
e I
wmTE FUNT 964 2260 i
{
RM l
388-5493 l
RIV RV RI j
728 4 210 448 4351 3465324 i
OTIER:
OFFICEh110N i
FAX NO.:
VERUTCATION:
O
((
NO. OF PAGES
+ TRANSMITTAL SHEET FROM:
BRUNO URYC - ElCS REGION ll FAX M149 VERIFICATION: FTS 841-4192