Text
._
1 sa a,
\\
(5) The licensen may proceed with and is required to complete the 1
i
. modifications identified in Paragraphs 3.1.1 through 3.2.28 of the NRC Fire Protection safety Evaluation Report on the Trojan 3
Nuclear Plant dated March 22, 1978.
These modifications shall be i
completed by the end of the second refueling outage of the Trojan i
i facility and prior to return to operation for Cycle 3.
In-addition, the licenses shall submit the additional information I
identified in Table 3.2 of this Safety Evaluation Report in ac:ordance with the schedule contained therein. In the event these dates for submittal cannot be net, the licensen shal1
\\
^
submit a report explaining the. circumstances, together with a i
i revised schedule.
(5)
P-imarv Shieldine Modification a
i The licensee is authorized to modify the primary shielding design as described in PGE letter dated April 22, 1977, as. supplemented l
and amended by letters dated September 22 and 23,1977, December 22, 1977, January 4 and 24,1978, Mar:h 20, and April 4, i
i (7)
Seect Fuel Assemb1v Shiccine Calk The licensee shall net move a spen; fuel assembly shipping cask into the Fuel Building,.
l l
D.
The licensee shall fully implement and maintain in effect all provi-siens of the Commission-accreved physical security, guard training and qualifica:icn, and safeguards contingency plans including amendments j
mace pursuan: to provisien of the Miscellanecus Amencments and Sear:h Re:ciremen:s to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authcrity of 10 CFR 50.90 and 10 CFR 50.54(p). The pians, which 3
}
contain Safeguards Information prc: acted uncer 10 CFR 73.21, are i
entitled:
' Trojan Nuclear Plan: Security Flan', with revisions sub-mitted througn Oc:ccer 7,1925; "Tr:cjan Nu Tear Plan: Se:urity Fer:e Trainine and Qualification Plan", with revisiens submitted through June 10, 1953; and " Trojan Nuclear Plant Safeguards Contingency Plan",
with revisions submittec through Octocer 7, 19ES. Changes mace in ac:crdance with 10 CFR 73.55 shall be implemented in ac:crdance with the schecule se: fcrth herein.
9701290193 970116 PDR ADOCK 05000344 p
,