Text
---
j.
-4 l*
The licensee may proceed with and is required to complete the j
(5) modifications identified in Paragraphs 3.1.1 through 3.1.18 of the NRC Fire Protection Safety Evaluation Report on the 7tojan Nuclear Plant dated March 22, 1978. These modifications shall be i
completed by the and of the second refueling outage of the Trojan facility and prior to return to operation for Cycle 3.
In-addition, the licenses shall submit the additional information 1
identified in Table 3.2 of this Safety Evaluation Report in i
accordance with the schedule contained therein.
In the event these dates for submittal cannot be met, the licensee shall submit a report explaining the circumstances, together with a J
revised schedule.
(6)
Primary Shieldine Modification The licensee is authorized to modify the primary shielding design i
j as described in PGE letter dated April 22, 1977, as supplemented and amended by letters dated September 22 and 23,1977, December 22, 1977, January 4 and 24,1978, March 20, and April 4, f
(7)
Seent Fuel Assembiv Shiocine cask The licensee shall not move a spent fuel assembly shipping cask i
l i
into the Fuel Building.
The licensee shall fully implement and maintain in effect all provi-D.
j sions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provision of the Misceilaneous Amendments and Search j
Requirements to 10 CFR 73.55 (51 FR 27817 and 27822) and to the l
authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which l
contain Safeguards Information protected under 10 CFR 73.21, are entitled:
" Trojan Nuclear Plant Security Plan", with revisions sub-mitted through October 7,1988; "Twojan Nuclear Plant Security Force Training and Qua'11fication Plan", with revisions submitted through and " Trojan Nuclear Plant Safeguards Contingency Plan",
4 June 10, 1988; j
with revisions submitted through October 7, 1988. Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with l
the schedule set forth herein.
I 4
f
"(7)
Loadine of Fuel into Casks in the Fuel Buildina The licensee is authorized to load spent nuclear fuel and other materials into transfer and' I
storage casks in the Fuel Building in accordance with PGE letter dated January 16,1997."
~
i i
\\
9701300214 970116 I