Proposed Tech Specs Re Composition of Plant Review Board
ML20012D578
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 03/21/1990
From:
PORTLAND GENERAL ELECTRIC CO.
To:
Shared Package
ML20012D576 List:
References
NUDOCS 9003280085
Download: ML20012D578 (2)


Text

_____

v LCA 194 Attachment B Page 1 cf 2 ADMIN 15TeATIvr e0Nta0ts COMPOS 1T10N y-p

~~

f~

< rqla u,, a h 36.5.1.2 The Plant Review Board shall be composed of the:

M '" M Chairman:

Manager, Technical Services Member:

System Engineering tranch Manager Member:

Maintenance granch Manager

\\

Member:

Operations Branch Manager

\\

Member:

Qua11. Assurance Operations Branch Manager Member:

Radiat on Protection tranch Manager ALT (aNATf5' L

..A 6.5.1.3.. All alternate members shall be appointed in writing by the(" PRS i

NT IChailman3to serve on a temporary basis; however, no more than two

  • (

alternates shall participate as voting members in PR8 activities at any c

one time.

MEETING FRE00ENCY 6.5.1.4 The PR8 shall oest at least once per calendar month and as convenet, by the PtB Chairman or his designated alternate, w

=-

(

6.5.1.5 A qu. w of the PR8 shall consist of the Chairman or his designated alternate and at least four members including alternates.

RESPONSIBILITIE5

6. 5.1. 6 The Plant Review Board shall be rvsponsible for:

a.

Review of the safety evaluations for: (1) prGcedures, (2) change l

to procedures, eenipment, systems or facilities, and (3) tests or experiments como e.ed under the provision of 10 Cri 50.59 to u

verify that such actions did not constitute an unreviewed Jafety goestion.

E b.

Review of g.roposed procedures and changce to procedures.

7 equipment, systems or facilities which may involve an unreviewed safety question as defined in 10 CFR S0.59 me involves a change in Technical 5pecifications.

=

Review of proposed test or empo..ments which may involve att c.

W unreviewed safety question as defined in 10 CM 50.59 or esquires a change in Technical Specifications.

I d.

Review of proposed changes to Technical Specifications or the Operating License.

R ANWT 1 6-4 Amencaent No. d2, 728, 725, //

AApril 11,-1988-1 b

9003~'8UO85 yOON 1,4 POra ADOC L 0 5 0s." N t F

F bt h

p -

.1

.s L

LCA 194 Attachment B Page 2 of 2 y,

6.5.1.2 The PRB shall be composed of at Itast five designated members, including the chairman. Members and the Chairman shall be designated in

?-

writing by the Plant General Manager, and shall as.a minimum, include managers or supervisors representing Plant Systems Engineering, Operations,

+;;

, Maintenance, Radiation Protection, and Quality Assurance.