ML20134B863

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Re Delete Paragraph 2.(C)(7) to Allow pre-operational Testing & Load Handling of Spent Fuel Transfer & Storage Casks in Trojan Fuel Building
ML20134B863
Person / Time
Site: Trojan  File:Portland General Electric icon.png
Issue date: 01/16/1997
From:
PORTLAND GENERAL ELECTRIC CO.
To:
Shared Package
ML20134B787 List:
References
NUDOCS 9701310120
Download: ML20134B863 (2)


Text

~.

.I8 s

ATTACHMENT II 9701310120 970116 ADOCKOSOOg44 PDR P

l

l.i I, (5) The licensen may proceed with and is required to complete the modifications identified in Paragraphs 3.1.1 through 3.1.18 of 1

the NRC Fire Protection safety Evaluation Report on the Trojan Nuclear Plant dated March 22, 1978. These modifications shall be completed by the end of the second refueling outage of the Trojan i

facility and prior to return to operation for Cycle 3.

In-i addition, the licenses shall submit the additional information identified in Table 3.2 of this Safety Evaluation Report in accordance with the schedule contained therein. In the event 2

these dates for submittal cannot be net, the licensen sha11 submit a report explaining the circumstances, together with a revised schedule.

l b

(6)

P-imarv Shieldine Modification t

i The licensee is authorized to mcdify the primary shielding design i

as described in PG5 letter dated April 22, 1977, as. supplemented i

and amended by letters dated September 22 and 23,1977, 3

j December 22, 1977, January 4 and 24,1978, March 20, and April 4, f

^

(7)

Seen: vel Assemb1v Shiccine Cask The licenset shall not move a spent fuel assembly shipping cask in o the Fuel Building,.

D.

The licensee shall fully implement and maintain in effect all previ-siens cf the Ccmmission-nep' eved physical security, guard training and r

qualifica:icn, and safeguarcs con:ingency plans including amendments mace pursuan to provisien of the Miscellanects Amencments and Search Receiremen:s to 10 CFR 73.55 (51 FR 27317 and 27822) and to the authcrity of 10 CFR 50.90 and 10 CFR 50.54(p). The pians, which contain Safecuards Informa:icn protected uncer 10 CFR 73.21, are entitled:

" Trojan Nuclear Plan: Security Plan', with revisiens sub-mitted through Oc:cber 7,1985; " Trojan Nuclear Plan: Security Fcres s

Trainine and Qua'lification Plan", with revisions submitted through June 10,19ES; and " Trojan Nuclear Plant Safeguards Contingency Plan",

with revisiens submittec through Oc:ccer 7, 1985. Changes made in accordance with 10 CTR 73.55 shall be implemented in accordance with the schecuie se: fcr:n herein.