ML20134B863

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Re Delete Paragraph 2.(C)(7) to Allow pre-operational Testing & Load Handling of Spent Fuel Transfer & Storage Casks in Trojan Fuel Building
ML20134B863
Person / Time
Site: Trojan  File:Portland General Electric icon.png
Issue date: 01/16/1997
From:
PORTLAND GENERAL ELECTRIC CO.
To:
Shared Package
ML20134B787 List:
References
NUDOCS 9701310120
Download: ML20134B863 (2)


Text

~. .

.I8 s

ATTACHMENT II 9701310120 970116 PDR ADOCKOSOOg44 P

l

l .i I, (5) The licensen may proceed with and is required to complete the 1 modifications identified in Paragraphs 3.1.1 through 3.1.18 of the NRC Fire Protection safety Evaluation Report on the Trojan Nuclear Plant dated March 22, 1978. These modifications shall be i completed by the end of the second refueling outage of the Trojan

' facility and prior to return to operation for Cycle 3. In-i' addition, the licenses shall submit the additional information identified in Table 3.2 of this Safety Evaluation Report in ,

2 accordance with the schedule contained therein. In the event  !

these dates for submittal cannot be net, the licensen sha11 submit a report explaining the circumstances, together with a revised schedule.

l b (6) P-imarv Shieldine Modification t i The licensee is authorized to mcdify the primary shielding design i .

as described in PG5 letter dated April 22, 1977, as. supplemented i

j and amended by letters dated September 22 and 23,1977, 3 December 22, 1977, January 4 and 24,1978, March 20, and April 4, f ^

(7) Seen: vel Assemb1v Shiccine Cask The licenset shall not move a spent fuel assembly shipping cask in o the Fuel Building,.

D. The licensee shall fully implement and maintain in effect all previ-siens cf the Ccmmission-nep' r eved physical security, guard training and qualifica:icn, and safeguarcs con:ingency plans including amendments mace pursuan to provisien of the Miscellanects Amencments and Search Receiremen:s to 10 CFR 73.55 (51 FR 27317 and 27822) and to the

' authcrity of 10 CFR 50.90 and 10 CFR 50.54(p). The pians, which contain Safecuards Informa:icn protected uncer 10 CFR 73.21, are  ;

entitled: " Trojan Nuclear Plan: Security Plan', with revisiens sub- '

s mitted through Oc:cber 7,1985; " Trojan Nuclear Plan: Security Fcres Trainine and Qua'lification Plan", with revisions submitted through June 10,19ES; and " Trojan Nuclear Plant Safeguards Contingency Plan",

with revisiens submittec through Oc:ccer 7, 1985. Changes made in accordance with 10 CTR 73.55 shall be implemented in accordance with the schecuie se: fcr:n herein.