ML20207D647

From kanterella
Jump to navigation Jump to search
Notification of Significant Meeting on 880817 W/Util in Walnut Creek,Ca for Enforcement Conference Re Early Criticality Event at Unit 1,personnel Radiation Overexposure at Unit 2 & Violation Re Essential Chiller Water Sys
ML20207D647
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/05/1988
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
EA-88-182, NUDOCS 8808150410
Download: ML20207D647 (2)


Text

-

P'

.[*% '

o UNITED STATES

-NUCLEAR REGULATORY COMMISSION 3

nE REGION V 1450 MARf A LANE, SUITE 210 WALNUT CRE E K, CALIFORNI A 04596 August 5, 1988

%. EA-88-182 NOTICE OF SIGNIFICANT MEETING Name of Licensee: Arizona Public Service Company Name of Facility: Palo Verde Nuclear Generating Station Docket Nos. : 50-528, 50-529, 50-530 Date and Time August 17, 1988, 10:00 a.m.

of Meeting:

Location Region V Conference Room of Meeting: Walnut Creek, California Purpose of To conduct an enforcement conference concerning an early Meeting: criticality event at Unit 1; a personnel radiation over-exposure at Unit 2; and the violation of technical specification requirements associated with the essential chilled water system at Unit 1. The meeting is being held at the request of the Regional Adminis aator.

NRC Attendees: J. B. Martin, Regional Administrator J. Lieberman, Director, Office of Enforcement D. F. Kirsch, Director, Division of Reactor Safety and Projects D. M. Crutchfield, Director, Division of Reactor Projects - III, IV, V, & Special Projects. NRR G. W. Knighton, Project Director, Project Directorate V R. A. Scarano, Director, Division of Radiation Safety a:1d Safeguards A. E. Chaffee, Deputy Director, Division of Reactor Safety and Projects A. D. Johnson, Enforcement Officer G. F. Yuhas, Chief, Emergency Preparedness and Radiological Protection Branch S. A. Richards, Chief, Engineering Section T. J. Polich, Palo Verde Senior Resident Inspector Licensee Attendees: 0. M. DeMichele, President and Chief Executive Officer D. B. Karner, Executive Vice President J. G. Haynes, Vice President, Nuclear Production J. E. Allen, Director, Engineering and Construction J. E. Kirby, Director, Site Services W. F. Quinn, Director, Nuclear Safety and Licensing L. G. Papworth, Director, Quality Assurance J. M. Allen, Unit 1 Plant Manager W. E. Ide, Unit 2 Plant Manager T. D. Shriver, Manager, Compliance J. Mann, Central Re< tation Protection Manager o

8808150410 880805 PDR ADOCK 05000528 g PNU ff-

2 NOTE: Attendance at this meeting by NRC personnel other than those listed above should be made known by August 15, 1988, via a telephone call to Stuart Richards at (415) 943-3853.

Distribution:

NRC Attendees Listed Above J. M. Taylor, Deputy Executive Director for Operations T. Murley, Director, NRR F. Miraglia, Associate Director for Projects B. K. Grimes, Director, Division of Reactor Inspection and Safeguards i

I l

l RV b j" SRichards:jb RPate AChqifee RScar DKir(ch 08/6/88 08/ 6 /88 08/ 5 /88 08/ 88 08/((y/88 l ST COPY. REQUESTCOPYJ RE ST COPY]

[35QUESTCOPYJ3EQUESTCOPYJR

! If YES // N0 ](YES)/ N0 ] ES./ N0 /YEV/ N0 ) E N0

$h) l I