Summary of 661222 Meeting W/Util & GE to Discuss re-evaluation of Emergency Core Cooling,Per 661020 Request. Attendees Listed
ML20114E376
Person / Time
Site: Oyster Creek
Issue date: 01/03/1967
From: Tedesco R
US ATOMIC ENERGY COMMISSION (AEC)
To:
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML093631134 List: ... further results
References
NUDOCS 9210120150
Download: ML20114E376 (2)


Text

7;g,,g l'NITED STATES GOVERNMEN1 gg Memorandum 10 The Files JM,3

?!B7 og THRU: Roge r S. Boyd, Chief Research 6 Power Reactor Safety Branch, DP1 FROM R. L. Tedesco Research & Power Reactor Safety Branch, DRL stDJECT:

Jersey Central - oyster Creek Docket No. 50-219 A teeting was held on December 22, 1966, with representatives of the Jersey Central Power & Light Co. (J.C.), General Electric (GE), and staff. The purpose of the meeting was to discuss re-evaluation of emergency core cooling capability in accordance with our request per letter to J.C. dated October 20, 1966.

The following attended the teetins;:

J.C.

CE AEC G. Ritter J. Graham P. A. >! orris D. Reese R. Huggins R. S. Boyd F. Trowbridge (atty.)

L. Kornblith J. Love (P&L)

J. Hard P. Cheek B. Crines R. Tedesco J.C. indicated concern over the intent of the letter since the plant is well along in final construction.

It reported that major changes at this time would be both extremely time consuming and costly.

It has, howeve r, made certain changes to the core spray syscem by adding additional active con:potents and providing auto-depressurization capability, but has not proposed to add a HPCI system (saro as Niagara-Nohawk).

Requirerents for the HPCI system would result in delay at a high economic penalty. This apparently forms the basis for real concern.

Outlining the problem, J.C. wanted to know whether the staf f could pro-vide sore guidance cor.cerning acceptability of the system.

It suggested submitting either formal or drafts of its analysis to the staff and perhaps the ACRS.

Ilowever, the staf f could not make a corenittent as to what early action may be taken on this matter, especially since the FSAR is due around January 20, 1967.

At the end of the meeting, ?!r. P.itter 4

indicated that drafts would be given to the staff with the hope that sorn early review would be of help.

Dr. Morris indicated that the staff uould make every e ffort to assist J.C. in this matter.

BP28 W TCij h L

i Hf 2N Buy U.S. Satings Bonds Regularly on the Papoll Satings Plan

s!

l The Files

-2 JArg 3 867 (Docket No. 50-219)

The plant is nw approxi:tately 557, cort;1eted.

Fuel loadine is expected around December 1967 with pwer operation tentatively scheduled for April 1968. The reactor vessel is nw on site, cc:

E. C. Case B. Crires P. Check R. Tedesco Dist ribution:

DRL Peading, R&PPSB Reading g

g&

  • }

- - - - - -