ML20101B438
ML20101B438 | |
Person / Time | |
---|---|
Site: | Seabrook |
Issue date: | 05/29/1992 |
From: | Nerses V Office of Nuclear Reactor Regulation |
To: | |
Shared Package | |
ML20101B443 | List: |
References | |
NUDOCS 9206040065 | |
Download: ML20101B438 (14) | |
Text
- - - _ _ - - - -
t MCg k
/
I%j
.? " '
yn UNITED STATES 3
r~E NUCLEAR REGULATORY COMMISSION I
WASHINoToN D.C. 20565 o,s
/
PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE. ET AL.*
NORTH ATLANTIC ENERGY SERVICE COMPANY DOCKET NO. 50-443 SEABROOK STATION. UNIT NO. 1
&MENDMENT TO FACILITY OPERATING llCENSE Amendment No. 10 License No. NPF-86 1.
The Nuclear Regulatory Commission (the Commission or the-NRC) has found that:
A.
The application for amendment filed by the Public Service Company of New Hampshire (the -licensee), acting for itself and as. agent and representative of the 11 other utilities listed below and hereafter referred _to as licensees, dated November 13, 1990 and supplemented by letters dated January 15, 1991, January 22, 1991, April 9, 1991, June 12,__1991, and September 16, 1991, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance: (i) that the activities authorized by this amendment can be cond"c.ted without endangering the health and safety of the public, ano sii) that such activities will be conducted in compliance with the Commission's regulations set-forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and
- Public Service Company of-New Hampshire was authorized to act as agent for the: - Canal Electric Company,-The Connecticut Light and Power Company,-EUA Power Corporation, Hudson Light & Power Department, Massachusetts Municipal Wholesale Electric Company, Montaup Electric -Company, New England-Power Company, New Hampshire Electric Cooperative, Ir.c., Taunton Municipal Light Plant, The United Illuminating Company, and Vermont Electric Generation and Transmission Cooper 4tive, Inc., and has exclusive responsibility and control I
over the physical constructicr., operation and maintenance of the facility.
By this amendment the_ North Atlantic Energy Service Co. will become that agent.
9206040065 920529 PDR ADOCK G8000443 P
_._,_.,.-_-----------=.-..---x-
' E.
The issuance of this amendment-is in accordance with 10-CFR Part 51 of the Commission's regulations and all applicable requirements-i have been satisfied.-
2.
Accordingly, Facility Operating License No. NPF-86 is hereby amended to read as follows:*
a)
The Title on page 1 of the license shall read:
North Atlantic Enerav Service Co. et al.*
Docket No. 50-443 Seabrook Station. Unit No. 1 Facility Operatina License b)
Paragraph 1.A of the license shall read:
The application for a license filed by the Public Service Company of New Hampshire, acting for itself and as agent and a
representative of the utilities-listed in the footnote below, and for the North Atlantic Energy Service Company (NAESCO), all of whom are hereafter referred to as licensees, complies with the standards and requirements of the Atomic-Energy Act of-3 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; and all required notifications to other agencies or bodies have been duly made; 4
c)
Paragraph 1.E of the license i, hall-read:
" North Atlantic Energy Service Company is technically qualified to engage in the activities authorized by this license in accordance with the Commission's regulations set forth in 10 CFR Chapter I;"
d)
The footnote on page-1 of the license shall-read:
" North Atlantic Energy Service Company ~(NAESCO) is authorized to act as agent for the:
Public Service Company of New Hampshire, Canal Electric Company, The Connecticut Light and Power Company, EUA Fower Corporation, Hudson Light & Power Department, Massachusetts Municipal Wholesale Electric Company, Montaup Electric Company, New England Power. Company, New Hampshire Electric Cooperative, Inc., ~Taunton Municipal Light Plant,-The United Illuminating Compsny, and Vermont-Electric-Generation and Transmission Cooperative, Inc., and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility."
- Pages 1,-2, 3, 3a, 3b, 4, 5 and 6 are attached, for convenience, for if9 composite license to reflect these changes.
Please remove pages 1, 2, 3a, 4, 5 and 6 of the existing license ar.d replace with the attached pages.
m
1 e)
Paragraph 2 shall read as follows:
" Based on the foregoing findings and the Comission's Memorandum and Order, CLI-90-03, (dated March 1, 1990),
Facility Operating License NPF-86, issued to the licensees, is hereby amended to read as follows:"
f)
Paragraph 2.B.(1) shall be modified by substituting " North Atlantic Energy Service Company" ("NAESC0") for "Public Service Company of New Hampshire" ('PSNH').
g)
Paragraphs 2.8.(3), 2.B.(4), 2.8.(5), 2.B.(6), 2.C.(1),
2.C.(2) and 2.C.(3) shall each be modified by substituting "NAESC0" for "PSNH".
1 h)
Paragraph 2.C.(4) shall be added as a new condition.
Paragraph 2.C.(4) reads as follows:
(4)
Iransfer of_Manaoino Authority (a)
For a period of three years from the date of issuance of the NRC license amendment approving the transfer of management authority to NAESCO, the licensee shall inform the Director, NRR, at least 60 days in advance, of any change in the senior site official for the Seabrook facility, or in the principal duties of such official, unless such change is due to unforeseen circumstances.
In such circumstances, the licensee shall inform the Director, NRR, of such change as soon as it can reasonably do so.
(b)
For a period of three years from the date
7 issuance of the NRC license amendment approving the transfer of management authority to NAESCO, the Joint Owners shall provide to the Director, NRR, promptly any report of the Oversight Committee or any report of the Operator or of any contractor or consultant which has been provided to the Joint Owners relating to:
plant design, equipment. or personnel performance or plant operations that could have potentially adverse effects on facility safety; any 3
substantive programatic or procedural changes to the employee concerns program; any allegation of employee harassmant, intimidation or discrimination; changes to any compensation incentive program which could have potentially adverse efft. cts on facility safety; and any changes to the annual operations and maintenance and capital expenditure budgets.
These reporting requirements are in addition to other requirements of NRC regulations.
1 (c)
The oversight reports in 2.C.(4)(b) shall be foilowed promptly by a report to the Director, NRR, by the Operator, reflecting the Operator's i
assessment of such report and )roposed corrective action, if any.
Su) mission of the Operator's assessment and proposed corrective action shall not delay submission of the report called for by license condition 2.C.(4)(b).
A review and assessment of the Operator's report by the Joint Owners shall be provided to the Director, NRR, together with any corrective actions and disposition of the Operator's report.
(d)
For a period of three years from the date of issuance of the NRC license amendment approving the transfer of management authority to NAESCO, the licens-a shall inform the Director, NRR, of any char.ge., to certain section of the Joint Ownership Agreement and the Managing Agent Operating Agreement.
These sections are:
Sections 3.c, 7.a, 7.e, 8, 10, 11 and 16.b, as described in Appendix 1 of the Settlement Agreement dated as of July 19, 1990 between Northeast Utilities Service Company and New England Power Company, i)
Paragraph 2.0., 2.E., 2.F. and 2.G. shall each be modified u
by substituting "NAESC0" for "PSNH" wherever the latter appears.
ll j)
Paragraph 2.1 shall be renumbered as 2.J and a new condition is added as 2.1.
k)
The final page of the license shall be marked " Revised:
May 29, 1992."
1.
ha_r_ketina of Eneroy (Amendment No.1.0mSection 3.0 of SER).
NAESCO is prohibited from marketing or brokering power er energy from the plant.
In addition, all licensees other than NAESCO-are responsible and accountable for the actions of their agent to the extent said agent's actions effect the marketing or brokering of power and energy from Seabrook Station, Unit No. 1.
)
l 1
. 3.
This license amendment is effective as of its date of issuance, and shall be implemented within 180 days.
FOR THE NVCLEAR REGULATORY COMMISSION h -
Asp
~
po Victor Nerses, Acting Director Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Pages 1, 2, 3, 3a, 3b, 4, 5 and 6 of Facility Operating License NPF-86 Date of issuance: May 29, 1992
l AITACHMENT TQ LICENSE AMENDMENT NO.10 IQ_FACIL{TV OPERATING LICENSL NQ,. NPF-80 QQf1ET NO. 50-443 Replace the following pages of the License with the attached pages.
The revised pages contain vertical lines indicating the areas of change.
i Egmove Paaes Insert Paoes I
1 1
2 2
r 3
3 l
3a 3a i
3b 4
4 5
5 6
6 l
l J
T"-
F
- '1
Attachment go Gac I'
a i
UNITED STATES
}
NUCLEAR REGULATORY COMMISSION 8
WASHINoToN, D.C. 20555 I
NORTH ATLANTIC ENERGY SEPJ1CE COMPANY. ET AL.*
l DOCKET NO. 50-443 1[ABR00K STATION. UNIT NO. 1
[6CILITY OPERATING LICENSE s
License No. NPT-86 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for a license filed by the Public Service Company of New Hamnshire, acting for itself and as agent and representative of the utilities listed in the footnote below, and for the North Atlantic Energy Service Company (NAESCO), all of whom are hereafter referred to as licensees, complies with the standards and requirementa of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's regulations set forth in 10 CFR Chapter I; and all required notifications to other agencies or bodies have been duly made; B.
Construction of the Seabrook Station, Unit No.1 (the facility) has been substantially completed in conformity with Construction Permit No. CPPR-135 and the application, as amended, the provisions of the Act, and the regulations of the Comission; C.
The facility will orarate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Comission (except as exempted from compliance in Section 2.D below);
D.
There is reasonable assurance: (i) that the activities authorized by this operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be ccnducted in compliance with the Comission's regulatiens set forth in 10 CFR Chapter I (except as exempted from compliance in Section P.D below);
- liorth Atlantic Energy Service Company (NAESCO) is authorized to act as agent for the:
Public Service Company of New Hampshire, Canal Electric Company, The Connecticut Light and Power Company, EUA Power Corporation, Hudson Light & Power Department, Massachusetts Municipal Wholesale Electric Company, Montaup Electric s
Company. New England Power Company, New Hampshire Electric Cooperative, Inc.,
)
Taunton Municipal Light Plar.., The United Illuminating Company, and Vermont Electric Generation and Transmission Cooperative, Inc., and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.
I l l E.
North Atlantic Energy Service Company is technically qualified to I
engage in the activities authorized by this license in accordance l
with the Comission's regulations set forth in 10 CFR Chapter I; l
l F.
The licensees havo satisfied the applicable provisions of 10 CFR 140, " Financial Prohetion Requirements and Indemnity Agreernents,"
of the _Comission's regulations; G.
The issuance of this license will not be inimical to the comon defense and security or tc the health and safety of the public;-
H.
After weighing the environmental,-economical, technical, and other benefits of the facility against environmental and other costs and l
considering available alternatives, the issuance of F:;ility Operating License No. NPF-86 subject to the conditior, for protection of the environment set forth in the Env! snmental Protection Plan attached as Appendix B, is in accordance with 10-CFR 51 of. the Comission's regulations and all applicable requirements have been satisfied; and I.
The receipt, possession and use of source, byproduct, and special nuclear material as authorized by this license-will-be in accord-ance with the Comission's regulations in 10 CFR 30, 40, and 70.
2.
Based on the foregcing findings and the Commission's Memoranditm And Order, CL1-90-03 (March 1,.1990), Facility Operating License No.
NPF-67 is superseded by facility Operating License No. NPF-86, issued to the licensees, is hereby amended to read as follows:
A.
This license applies to the Seabrook Station, Unit _l, _a pressurized water nuclear reactor and associated equipmeit -(the facility), owned _by the 1icensees..The. facility is located-in-Seabrook Township, Rockingham County, on the southeast coast of the State of New Hampshire,'and is described in the licensees *
" Final Safet) Analysis Report," as supplemented and amended, and-in the ' licensees' Environmental Report, 'as' supplemented and amended.
B.
Subject to the conditions and requirementt incorporated herein,
-the Comission hereby: licenses:
(1) North Atlantic Energy Service Company (NAESCO), pursuant to Section 103 of the Act and 10 CFR 50,-to possess,- use and operate.the facility at the designated location-in Rockingham County, New Hampshire, in accordance with the-procedures-and limitations set forth in this license; (2)
The licensees to possess the facility at the-designated location in Rockingham County,-New Hampsiiire, in accordance with he procedures and.limitatior.s set forth in this
. license;
-i I
j z,
~.
(3)
NAESCO, pursuant to the Act and 10 CFR 70, to receive, possess, anc use at any time special nuclear material as reactor fuel, in accordance with !he limitations for storage and amounts required for reactor opeiation, as described in the Final Safety Analysis Report, as supplemented and amended; (4)
NAESCO, pursuant to the Act and 10 CFR 30, 40, and 70, to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5)
NAESCO, pursuant to the Act and 10 CFR 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (6)
NAESCO, pursuant to the Act and 10 CFR 30e 40, and 70, to possess, but not separate, such byptoduct and special nuclear materials as m1y be produced by the operation of the facility authorized herein; anu (7)
The United Illuminat;ng Company (UI) is authorized to transfer any portion of its 17.5% interest in Seabrook Station, Unit I and rights with respect to its interest in the Seabrook common facilities (up to and inclusive of $250 ciillion of aggregate appraised value) to certain egalty investors and at the same time tu lease back from r.uch purchasers such interests and rights transferred in tLe Seabrook Station, Unit I facility.
The exper.ted initial term of the lease is for approximately 32 years, subject to the rights of renewal.
Such sale and leaseback transactior.s are subject to the condition that lessors and.anyor.e else who may acquire an interest under these transactions are
(
prohibited from exercisir.g directly or indirectly any tontrol over (i) Seabrook Station, Unit 1, (ii) power and energy produced by Seabrook Station, Unft 1, or (iii) the licensees of Seabrook Station, Unit 1.
Further, any right!
acquired under this authorization may be exercisd only in compliance with and subject to the requiremcnts and restrictions of this operating license, the Ato.nic Energy Act of 1954, as amended, and the Commissien' requiatior.s.
For purposes of this condition the limitations in 10 CFR 50.81, as now in effect and as may la subsequa.tly amended, are fully applicable to the lessor and any sua.essor ir, interest to that lesser as long as the license for Seabrock Station, Unit I remains in effect.
________9
- 3a -
Further, the licensas are also required to notify the NRC in writing prior to any change in: (i) the terms or conditions of any lease agreements executed as part of these transaction:; (ii) the Seabrook Operating Agreement, or (iii) the existing property insurance coverage far Seabrook Station, tinit 1.
In addition, the licens es are requireu to notify the NRC of any action by a lessor or others that may hcve an effect on the safe operation of the facility.
2C.
Tnis license shall be deemed to centain and is subject to the conditions specifhd in the Commission's regulations set forth in 10 CFR Chapter 1 and is subject tu all applicable proitsions of the Act and to the rubs, regulations, and orders of the Connission now or hercafter in effect; e.d is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power leve,1 NAESCO is authorize:! to operate the facility at retctor core power leve's not in excess of 3411 megawatts therc:1 II.00%
of rated power).
(2)
Technical Soecifications The Technir.al Specifications contained in Appendix A, as revised thecugh Amendment No.
, and the Environmental Protection 91an contained in Appendix 8 are incorporated into Facility License No NPF-86. NAESCO shall operate the l
facility in accordance with the Technical Specifications and the Environmental Protection Plaa.
(3)
Hum n Factors Enoineerina (Section 18,,S_F R 7)*
l Before startup following the first reiueling outage, NAESCO I
shall resolve the following remaining Safety Parameter Display Systems issues:
(a)
Perform system availability calculations including Reactor Vasse: Level Indication System and Radiation l
Datu Management System and provido a report to the staff.
l (b)
Perform system load test under heavily loaded plaat conditions and provide a report of the evaluation to the staff.
- The parerthetical notation denotes the section of the Safety Evtluation Repe-t (SER) and/or its supplenents (SSER) wherein the licesse condition is discussed l
- i. - r. r; a
- 3b -
(4)
Transfer of Manacina Authority (a)
For a p viod of three years from the date of issuance of the EC license amendment approving the transfer of management authority to NAESCO, ee license shall inform the Director, NRR, at least 60 days in advance, of any change in the senior site official for the Seabrook facility, or in the principal duties of such of ficial, unless such change is due to unforese(n circumstances.
In such circumstances, the licensen shall inform the Director, NRR, of such change as soon as it can reasonably do so.
(b)
For a period of three years from the date of issuance k
of the NRC license amendment approving the transfer of management authority to NAESCO, the Joint Owners shall provide to the Director, NRR, promptly any report of the Oversight Committee or any report of the Operator or of any contractor or consultant which has been provided to the Joint Owners relating to:
plant c
design, equipment or personnel performance or plar.'.
operations that could have potentially adverse effects l(
on facility safety; any substantive programmatic or
\\
procedural changes to the employee concerns program; any allegation of employee harassment, intimidation or discrimination; changes to any conpensation incentive program which could have potentially adverse effects on facility safety; and any changes to the annual operations and maintenance and capital expenditure budgets. These reporting requirements are in addition to other requirements of HRC regulations.
(c)
The oversight reports in 2.0.(4)(b) shall be followed promptly by a report to the Cirector, NRR, by the Operator, reflecting the Operator's assessment of such report and proposed corrective action, if any.
Submission of the Operator's assessment and proposed corrective action shall not delay submission of the report called for by licensr condition 2.0.(4)(b).
A review and assessme.it of the Operator's repor. by the Joint Owners shall be provided to the Director, NRR, together with any corrective actions and disposition of the Operator's report.
(d)
For a period of three years from the date of issuance of the NRC license amendment approving the transfer of management authority to NAESCO, the licensee shall
4 inform the Director, NRR, of ony changes to certain sections of the Joint Ownership Agreement and the Managing Agent Operating Agreement.
These sectiens are:
Sections 3.c, 7.a. 7.e 8, 10, 11 and 16.b, as described in Appendix 1 of the Settlement Agreement dated as of July 19, 1990 between Northeast Utilities Service Company and New England power Company.
D.
[n.m_p.dgn NAESCO is exempted from the Section Ill.D.2(b)(lt) containment l
airlock testing requirements of Appendix J to 10 CFR 50, because of the special circumstances described in Section 6.2.6 of SER Supplement 5 and authorized by 10 CFR 50.12(a)(2)(11) and (iii)
(51 FR 37684 October 23, 1986).
NRC Haterials License No. SNH-1963, issued December 19, 1985, f
granted an exemption pursuant to 10 CFR 70.24 with respect to requirements for criticality alarms.
NAESCO is hereby exempted from provisions of 10 CFR 70.24 insofar as this section applies to the storage and handling of new fuel atsemblies in the new fuel storage vault, spent fuel pool (then dry), and shipping containers.
These exemptions, authorized by law, will not present an undue risk to the public health and safety and are consistent with the common defense and security.
These exemptions are hereby granted pursuant to 10 CFR 50.12.
With the granting of these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.
E.
Physical Security NAESCO shall fully implement and maintain in effect all provisions of the physical security, guard training and qualification, and safeguards contingency plans, previously approved by the Commission and all amendments and revisions to such plans made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p) including amendments and revisions made pursuant to provisions of the Miscellaneous Amendments and Search F.tuirements of 10 CFR 73.55.
The plans which contain Safeguards Information protected under 10 CFR 73.21, are entitled:
"Seabrook Station Physical Security Plan," with revisions submitted through June 9, 1988; "Seabrook Station Security Training and Qualification Plan," with revisions submitted through November 4, 1987; and "Seabrook Station Safeguards Contingency Flan," with revisions submitted through May 19, 1981. Changes made in M cordance with 10 CrR 73.55 shall be implemented in accordance with the schedale set forth therein.
. F.
Fire Protection NAESCO shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report, the Fire Protection Program Report, and the Fire Protection of Safe Shutdown Capability Report for the facility, as supplemented and amanded, and as approved in the Safety Evaluation Report, dated March 1983; Supplement 4, dated May 1986; Supplement 5. dated June 1986; Supplement 6, dated October 1986; Sup>1ement 7, dated October 1987; and Supplement 8, dated May 1989 su) ject to the following provisions:
NAESCO may make changes to the approved fire protection program without prior approval of the Commission, only if those changes would not adversely affect the ability to achieve and maintain shutdown in the event of a fire.
G.
Reportina to the Commission Except as otherwise provided in the Technical Specifications or Environmental Protection Plan, NAESCO shall report any violations l
of the requirements contained in Section 2.C of this license in the following manner:
Initial notification shall oe made within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the NRC Operations Center via the Emergency Notification System, with written follow-up within 30 days in accordance with the procedures described in 10 CFR Part 50.73(b),
(c), and (e).
H, Financial Protection The licensees shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
1.
Marketino of Enerav (Amendment No. 10. Section 3.0 of SER)
NAESCO is prohibited from marketing or brokering power or energy from the plant.
In addition, all licensees other than NAESCO are responsible and accountable for the actions of their agent to the extr:nt said agent's actions effect the marketing or brokering of power and energy from Seabrook Station, Unit 1.
I e
______m
4
.).
Effective Date and Expiration i
This license is effective as the date of it.suance and shall expire at midnight on October 17, 202f.
FOR THE NUCLEAR REGULATORY COMMIS$10N r'-
Thomas E. Purley, Director Office of Nuclear Reactor Regulation Attachments / Appendices:
1.
AppendixA-TechnicalSpecifications(NUREG-1386) 2.
Appendix 0 - Environmental Protection Plar.
Date of 1ssuarce:
MAR 151990 Pevised: May 29, 1992
_ _ _. _