ML20059L952

From kanterella
Jump to navigation Jump to search
Amend 26 to License NPF-86,revising Tech Specs to Reduce Frequency of Surveillances Required to Verify Integrity of Condensate Storage Tank at Least Every 18 Months
ML20059L952
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 11/10/1993
From: Stolz J
Office of Nuclear Reactor Regulation
To:
North Atlantic Energy Service Corp
Shared Package
ML20059L954 List:
References
NPF-86-A-026 NUDOCS 9311180030
Download: ML20059L952 (5)


Text

- _ _ _

o arc f.

k UNITED STATES

[. 2N j NUCLEAR REGULATORY COMMISSION f

WASMNGTON, D.C. 20555Km i$

%; m }

NORTH ATLANTIC ENERGY SERVICE CORPORATION. ET Al*

DOCKET N0. 50-443 SEABROOK STATION. UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 26 License No. NPF-86 1.

The Nuclear Regulatory Comission (the Comission) has found that:

l A.

The application for amendment by North Atlantic Energy Service Corporation, et al. (the licensee), dated June 18, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

  • North Atlantic Energy Service Company (NAESCO) is authorized to act as agent for the: North Atlantic Energy Corporation, Canal Electric Company, The Connecticut Light and Power Company, Great Bay Power Corporation, Hudson Light and Power Department, Massachusetts Municipal Wholesale Electric Company, Montaup Electric Company, New England Power Company, New Hampshire Electric Cooperative, Inc., Taunton Municipal Light Plant, The United Illuminating Company, and Vermont Electric Generation and Transmission Cooperative, Inc.,

{

and has exclusive responsibility and control over the physical construction, operation, and maintenance of the facility.

9311180030 931110 PDR ADOCK 05000443 i

p PDR l

i i

l ;

i 1

l 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, f

and paragraph 2.C.(2) of Facility Operating License No. NPF-86 is hereby 1

i amended to read as follows-i (2) Technical Soecifications l

1 j

The Technical Specifications contained in Appendix A, as revised j

through Amendment No. 26

, and the Environmental Protection Plan contained in Appendix B are incorporated into Fr.cility License No.

l j

NPF-86.

NAESCO shall operate the facility in accordance with the j

j Technical Specifications and the Environmental-Protection Plan.

+

3.

This license amendsent is effective as of the date of its issuance, to be implemented within 60 days of issuance.

j FOR THE NUCLEAR ATOR C0ffilSSION e

./

2 J n

. Stolz, Director l

l P

ect Directorate I-4.

I Division of Reactor Projects - I/I:

1 q

Office of Nuclear Reactor Regulation l

Attachment:

Changes to the Technical

{

Specifications l

1 Date of Issuance:

November 10, 1993 l

l I

l 1

i 1

i J

)

i 1

3 4

I

i ATTACHMENT T0 LICENSE AMENDMENT NO. 26 FACILITY OPERATING LICENSE NO. NPF-86 DOCKET NO. 50-443 i

Replace the following pages of Appendix A, Technical Specifications, with the attached pages as indicated. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change. Overleaf pages have been provided.

Remove Insert 3/4 7-5*

3/4 7-5*

3/4 7-6 3/4 7-6 i

I i

~-

PLANT SYSTEMS TURBINE CYCLE AUXILIARY FEEDWATER SYSTEM i

SURVEllLANCE RE0VIREMENTS 4.7.1.2.2 Auxiliary feedwater flow paths to each steam generator shall be demonstrated OPERABLE following each COLD SHUTDOWN of greater than 30 days, or after maintenance on an auxiliary feedwater pump that could have an effect upon pump performance, pricr to entering MODE 2 by verifying normal flow to each steam generator from:

a.

Each emergency feedwater pump, and b.

The startup feedwater pump via the main feedwater flow path and via the emergency feedwater header.

i 1

3 I

i 1

9 i

i 1

i l

i O

j J

l l

i i

1 SEABROOK - UNIT 1 3/4 7-5

.__....-.__ - - -.-.,.- - -