ML20141D139
| ML20141D139 | |
| Person / Time | |
|---|---|
| Site: | Seabrook (NPF-86-A-052, NPF-86-A-52) |
| Issue date: | 06/24/1997 |
| From: | Milano P NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20141D143 | List: |
| References | |
| NUDOCS 9706260328 | |
| Download: ML20141D139 (4) | |
Text
. - -
p*M%
p 4
UNITED STATES g
j NUCLEAR REGULATORY COMMISSION 2
WASHINGTON, D.C. 20666 4 001 l
NORTH ATLANTIC ENERGY SERVICE CORPORATION. ET AL.*
l DOCKET NO. 50-443 i
SEABROOK STATION. UNIT NO. 1 l
l AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 52 License No. NPF-86 l
1.
The Nuclear Regulatory Commission (the Commission) has found that:
i A.
The application for amendment by North Atlantic Energy Service Corporation, et al. (the licensee), dated June 19, 1997, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR, Chapter I; 8.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common l
defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- North Atlantic Energy Service Company (NAESCO) is authorized to act as agent l
for the: North Atlantic Energy Corporation, Canal Electric Company, The Connecticut Light and Power Company, Great Bay Power Corporation, Hudson Light and Power Department, Massachusetts Municipal Wholesale Electric Company, Montaup Electric Company, New England Power Company, New Hampshire Electric Cooperative, Inc., Taunton Municipal Light Plant, and The United Illuminating Company, and has exclusive responsibility and control over the physical i
construction, operation, and maintenance of the facility.
1 i
9706260320 970624 PDR ADOCK 050 4j3 P
j 2.
Accordingly, the-license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-86 is hereby l
amended to read as follows:
(2) Technical Soecifications The Technical Specifications contained in Appendix A, as revised through Amendsent No. 52, and the Environmental Protection Plan contained in Appendix B are incorporated into Facility License No. NPF-86.
RAESCO shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance, to be implemented before transition into Operational Mode 2 during startup from Refueling Outage 5.
FOR THE NUCLEAR REGULATORY COMMISSION
~
Patrick D. Milano, Acting Director Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: June 24, 1997 i
I l
l l
4
(
I
l ATTACHMENT TO LICENSE AMENDMENT NO. 52 FACILITY OPERATING LICENSE NO. NPF-86 l
DOCKET NO. 50-443 l
l Replace the following page of the Appendix A, Technical Specifications, with l
the attached page as indicated.
The revised page is identified by amendment number and contains vertical lines indicating the area'of change.
Remove Insert 6-18C 6-18C l
l i
i f
l l
t t
r
.i
l ADMINISTRATIVE CONTROLS 6.8.1.6.b. (Continued)
- 10. YAEC-1855P, "Seabrook Station Unit 1 Fixed Incore Detector System Analysis," October 1992 Methodology for Specification:
3.2.1 AXIAL FLUX DIFFERENCE 3.2.2 Heat Flux Hot Channel Factor 3.2.3 Nuclear Enthalpy Rise Hot Channel Factor
- 11. YAEC-1624P, " Maine Yankee RPS Setpoint Methodology Using Statistical Combination of Uncertainties - Volume 1 - Prevention of Fuel l
Centerline Melt," March 1988 1
L Methodology for Specification:
i 3.2.1 AXIAL FLUX DIFFERENCE i
3.2.2 Heat Flux Hot Channel Factor 3.2.3 Nuclear Enthalpy Rise Hot Channel Factor l
- 12. NYN-95048, Letter from T. C. Feigenbaum (NAESCo) to NRC, " License l
Amendment Request 95-05: Positive Moderator Temperature Coefficient",
l May 30, 1995 Methodology for Specification:
3.1.1.3-Moderator Temperature Coefficient l
l 13.. WCAP-12610-P-A, " VANTAGE + Fuel Assembly Reference Core Report",
April 1995, (Westinghouse Proprietary) l Methodology for Specification:
l 3.2.2-Heat Flux Hot Channel Factor l
l 6.8.1.6.c.
The core operating limits shall be determined so that all i
applicable limits (e.g., fuel thermal-mechanical limits, core thermal-hydraulic limits, ECCS limits, nuclear limits such as SHUTDOWN MARGIN, and transient and accident analysis limits) of the safety analysis are met.
The CORE OPERATING LIMITS REPORT for each reload cycle, including any mid-cycle revisions or supplements thereto, shall be provided upon issuance, to the NRC Document Control Desk with copies to the Regional Administrator and the Resident Inspector.
l 1
SEABROOK - UNIT 1 6-18C Amendment No. 52 l
.