O NORTH ATLANTIC ENERGY SERVICE CORPORATION. ET AL.*
DOCKET NO. 50-443 SEABROOK STATION. UNIT NO.1 AMENDMENT TO FACILITY OPERATING LICENSE i
Amendment No. 64 License No. NPF-86 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment filed by the North Atlantic Energy Service Corporation, et al. (the licensee), dated March 27,1998, as supplemented June 17,1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- North Atlantic Energy Service Corporation (NAESCO)is authorized to act as agent for the:
North Atlantic Energy Corporation, Canal Electric Company, The Connecticut Light and Power Company, Great Bay Power Corporation, Hudson Light & Power Department, Massachusetts Municipal Wholesale Electric Company, Montaup Electric Company, New England Power Company, New Hampshire Electric Cooperative, Inc., Taunton Municipal Light Plant, The United illuminating Company, and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.
9910140070 991005
~
PDR ADOCK 05000443 P
p i :-
l
. l l
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.G.(2) of Facility Operating License No. NPF-86 is hereby amended to read as follows:
.(2) Technical Soecifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 64, and the Environmental Protection Plan contained in i
Appendix B are incorporated into Facility License No. NPF-86. NAESCO shall
{
operate the facility in accordance with the Technical Specifications and the
{
Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 60 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION J mes W. Clifford, hief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications
~ Date of Issuance:. October 5, 1999
)
q I
ATTACHMENT TO LICENSE AMENDMENT NO. 64
' FACILITY OPERATING LICENSE NO. NPF-86 DOCKET NO. 50-443 Replace the following pages o' f the Appendix A, Technical Specifications, with the attached -
revised pages as indicated. The revised pages are identified by amendment number and contain rnarginal lines indicating the a'rea of change. ' Overleaf pages have been provided.*
- Remove '
insert 3/4 7-15*
3/4 7-15*
'3/4 7 3/4 7-16 3/4 7-18a 3/4 7-18a I
f f
l w
i
.']
t'..._'
r-t f
t
- PAGE INTENTIONALLY BLANK P
e I.
l.
l '
-SEABROOK - UNIT I_
3/4 7-15 Amendment No. 32,
gq
,ge, a
.. CONTROL' ROOM SUBSYSTEMS 3/4.7.6 EMERGFNCY MAKEUP' AIR AND FILTRATION
' LIMITING _ CONDITION FOR OPERATION 3.7.6.1 :Two inde)endent' Control Room Emergency _ Makeup Air and Filtration Subsystems.shall 3e, OPERABLE.
APPLICABILITY: All MODES-ACTION:
MODES 1. 2, 3 and 4:
With one Control Room Emergency Makeup Air and Filtration Subsystem inoperable, restore the ino)erable system.to OPERABLE status within 7 days or be in at
.least HOT STAND 3Y.within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and'in COLD SHUTDOWN within the
-following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
MODES 5'and 6:
a.
With one Control Room Emergency Makeup Air and Filtration Subsystem inoperable, restore the inoperable system to OPERABLE status within 7 days or initiate and maintain operation of the remaining OPERABLE Control Room Emergency Makeup Air and Filtration Subsystem in the filtration / recirculation mode.
' b.
With both Control Room Emergency Makeu) Air and Filtration Subsystems inoperable. or with the OPERABLE Control. Room Emergency Makeup Air and Filtration Subsystem required to be.in the filtration / recirculation mode by ACTION a., not capable of being powered by an OPERABLE emergency power. source, suspend all
{
operations involving CORE ALTERATIONS.
' SURVEILLANCE REQUIREMENTS 4.7.6.1 Each Control. Room Emergency Makeup Air and Filtration Subsystem shall be demonstrated OPERABLE:
a.
At least.once-per 31 days on a STAGGERED TEST BASIS by initiating.
from the control room, flow through the HEPA filters and charcoal adsorbers and verifying that-the system operates for at least 10 continuous hours with the heaters operating; SEABROOK. UNIT 1~
3/4-7,16 Amendment No.56,64
- PLANT SYSTEMS l
' 3/4.7.6 CONTROL ROOM SUBSYSTEMS
. AIR CONDITIONING LIMITING CONDITION FOR OPERATION 3.7.6.2 Two independent Control Room Air Conditioning Subsystems shall be OPERABLE.
APPLICABILITY: All MODES ACTION:
MODES 1,2,3 and 4:
With one Control Room Air Conditioning Subsystem inoperable, restore the inoperable system to OPERABLE status within 30* days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
MODES 5 and 6:
a.
With one Control Room Air Conditioning Subsystem inoperable, restore the inoperable system to OPERABLE status within 30* days or initiate and maintain operation of the remaining OPERABLE Control Room Air Conditioning Subsystem or immediately suspend all operations involving CORE ALTERATIONS.
l b.
With both Control Room Air Conditioning Subsystems inoperable, or with the OPERABLE Control Room Air Conditioning Subsystem unable to maintain temperature below the limiting equipment qualification temperature in the control room area, suspend all operations involving CORE ALTERATIONS.
g SURVEILLANCE REQUIREMENTS j
4.7.6.2 Each Control Room Air Conditioning Subsystem shall be demonstrated I
OPERABLE at least once per 92 days by verifying the ability to maintain temperature in the control room area below the limiting equipment qualification temperature for 24 g
hours.
- For cycle 7, the allowable outage time may be extended to 60 days, on a one-time basis, for each train to implement modifications to the Control Room Air Conditioning Subsystems. The provisions of Specifications 3.0.4 and 4.0.4 are not applicable during the implementation of modifications to the Air Conditioning Subsystems.
t SEABROOK - UNIT 1 3/4 7-18:
Amendment No. 56r.62, 64
)
.