Amend 47 to License NPF-86,revising App a TS 3.3.2, Engineered Safety Features Actuation Sys Instrumentation
ML20108D998
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 05/07/1996
From: Mckee P
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20108E000 List:
References
NUDOCS 9605090173
Download: ML20108D998 (5)


Text

.fm%

xy k

l UNITED STATES 4,

j j

NUCLEAR REGULATORY COMMISSION WASHINGTON D.C. 2006M001

.....,o liQRTH ATLANTIC ENERGY SERVICE CORPORATION. ET Al*

DOCKET NO. 50-443 SEABROOK STATION. UNIT NO. I l

AMENDMENT TO FACILITY OPERATING LICENSE i

Amendment No. 47 License No. NPF-86 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by North Atlantic Energy Service Corporation, et al. (the licensee), dated September 22, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

  • North Atlantic Energy Service Company (NAESCO) is authorized to act as agent for the: North Atlantic Energy Corporation, Canal Electric Company, The Connecticut Light and Power Company, Great Bay Power Corporation, Hudson Light and Power Department, Massachusetts Municipal Wholesale Electric Company, Montaup Electric Company, New England Power Company, New Hampshire Electric Cooperative, Inc., Taunton Municipal Light Plant, and The United Illuminating Company, and has exclusive responsibility and control over the physical construction, operation, and maintenance of the facility.

9605090173 960507 PDR ADOCK 05000443 P

PDR

Rf 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-86 is hereby amended to read as follows:

(2) Technical Soecifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 47, and the Environmental Protection Plan contained in Appendix B are incorporated into Facility License No.

NPF-86.

NAESCO shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance, and is to be implemented within 60 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/

Phillip F. McKee, Director i

Northeast Utilities Project Directorate i

Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

May 7, 1996 l

i 1

l 1

i I

n; ATTACHMENT TO LICENSE AMENDMENT N0. 47 FACILITY OPERATING LICENSE N0. NPF-86 DOCKET NO. 50-443 Replace the following pages of Appendix A, Technical Specifications, with the attached pages as indicated. The revised pages are identified by amendment number and contain vertic3 lines indicating the areas of change. Overleaf 1

pages have been provided Remove Insert 3/4 3-21 3/4 3-21 3/4 3-22*

3/4 3-22*

)

. ~.

M TABLE 3.3-3 (Continued) i E

g ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION 7

MINIMUM TOTAL NO.

CHANNELS CHANNELS APPLICABLE c_

2 FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION b.

RWST Level--Low-Low 4

2 3

1, 2, 3, 4 15 l

~

Coincident With:

Safety Injection See Item 1. above for all Safety Injection initiating functions and requirements.

9.

Loss of Power (Start Emergency feedwater) a.

4.16 kV Bus E5 and E6-2/ bus 2/ bus 1/ bus 1, 2, 3, 4 14 Loss of Voltage Y

b.

4.16 kV Bus E5 and E6-5 Degraded Voltage 2/ bus 2/ bus 1/ bus 1, 2, 3, 4 14 Coincident with SI See Item 1. above for all Safety Injection initiating functions and requirements.

10. Engineered Safety Features Actuation System Interlocks a.

Pressurizer Pressure, 3

2 2

1, 7, 3 19 P-ll 1

b.

Reactor Trip, P-4 2

2 2

1,2,3 21 3

c.

Steam Generator Water 4/sta. gen.

2/sta. gen.

3/sta. gen. 1, 2, 3 18 s

Level, P-14

TABLE 3.3-3 (Continued)

TABLE NOTATIONS

  • The provisions of Specification 3.0.4 are not applicable.
  1. Trip function may be blocked in this MODE below the P-11 (Pressurizer Pressure Interlock) Setpoint.
    • Trip function automatically blocked above P-11 and may be blocked below P-11 when Safety Injection on low steam line pressure is not blocked.

ACTION STATEMENTS ACTION 13 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANDBY within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; however, one channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1, provided the other channel is OPERABLE.

ACTION 14 - With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

a.

The inoperable channel is placed in the tripped condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and b.

The Minimum Channels OPERABLE requirements is met; however, the inoperable channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing of other channels per Specification 4.3.2.1.

ACTION 15 - With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed provided the inoperable channel is placed in the bypassed condition and the Minimum Channels OPERABLE requirement is met. One additional channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance l

testing per Specification 4.3.2.1.

ACTION 16 - With less than the Minimum Channels OPERABLE requirement, operation may continue provided the containment purge supply and exhaust valves are maintained closed.

ACTION 17 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

ACTION 18 - With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

SEABROOK - UNIT 1 3/4 3-22 Amendment No. 36