MONTHYEARML20210P5931999-08-11011 August 1999 Amend Application Number 189 for License NPF-10 & Amend Application Number 174 for License NPF-15,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Calculation E4C-098 ML20195E5061999-06-0808 June 1999 Application for Amends to Licenses NPF-10 & NPF-15, Consisting of Proposed Change Number 495,which Revises TS 3.5.2,3.1.9,3.7.1 & 5.1.7.5 ML20205T2841999-04-24024 April 1999 Amend Application 187 to License NPF-10,consisting of Proposed Change Number 504,requesting NRC Approval to Repair Degraded But Operable Shutdown Cooling Sys Check Valves at Unit 2 in Normal Operation (Mode 1) ML20204B9731999-03-12012 March 1999 Application for Amends to Licenses DPR-13,NPF-1 & NPF-15, Revising SONGS Physical Security Plan & Safeguards Contingency Plan Tactical Response Plan for Defending Site Against Safeguards Emergencies.Details of Amend Withheld ML20199D0331999-01-13013 January 1999 Suppl 1 to Amend Applications 157 & 141 to Licenses NPF-10 & NPF-15,respectively,restricting Required Action Completion Time to Close All Containment Penetrations Providing Direct Access from Containment Atmosphere to Outside Atmosphere ML20206R2761999-01-11011 January 1999 Amends Applications 185 & 171 to Licenses NPF-10 & NPF-15, Consisting of Proposed TS Change Number 499,requesting Rev to TS 3.7.6 & Associated Bases to Increase Required Water Volume in CST T-120 from 280,000 to 360,000 Gallons ML20198L6131998-12-31031 December 1998 Amend Applications 184 & 170 to Licenses NPF-10 & NPF-15, Consisting of Proposed Change 501,requesting Rev of TS 3.3.5, ESFAS Instrumentation ML20198G3741998-12-22022 December 1998 Proposed TS Change Number 489 to Amend Applications 176 & 162 to Licenses NPF-10 & NPF-15,changing TS 5.5.2.11, SG Tube Surveillance Program ML20196J1681998-12-0808 December 1998 PCN-493 to Amends 183 & 169 to Licenses NPF-10 & NPF-15, Revising Units 2 & 3 Tech Specs 3.4.10, Pressurizer Safety Valves, Consistent with Certain UFSAR Chapter 15 Events Recently Reanalyzed ML20195J9461998-11-23023 November 1998 Amends 178 & 164 to Licenses NPF-10 & NPF-15,consisting of Proposed Tech Specs Change Number (PCN-494),revising UFSAR Pages Necessary to Identify Programs Which Govern Test Intervals for Turbine ML20195J8961998-11-23023 November 1998 Amends 182 & 168 to Licenses NPF-10 & NPF-15,consisting of Proposed Tech Spec Change Number 498,revising TS 3.3.1, RPS Instrumentation - Operating ML20155B8631998-10-20020 October 1998 Application for Amends to Licenses NPF-10 & NPF-15, Respectively.Proposed Change Number 485 Adds SR to TS 3.3.9, CR Isolation Signal ML20153G7471998-09-22022 September 1998 Amends 181 & 167 to Licenses NPF-10 & NPF-15,respectively, Revising TS 3.3.1, RPS Instrumentation - Operating, Re RT Operating Bypass Removal Process Variable ML20151W6751998-09-10010 September 1998 Application for Amends 180 & 166 to Licenses NPF-10 & NPF-15,eliminating Requirements for Hydrogen Control Sys from Low Power Plant License Condition 2.C(19)i & from TSs 3.3.11 & 3.6.7 ML20151T6521998-09-0404 September 1998 Application for Amends to Licenses NPF-10 & NPF-15,revising TS 3.4.10 by Increasing as-found Psv Setpoint Tolerances ML20236S6221998-07-22022 July 1998 Suppl 2 to Applications for Amend to Licenses NPF-10 & NPF-15,revising TS 3.8.1 by Extending Offsite Circuit Completion Time from 72 Hr & 6 Days from Discovery of Failure to Meet LCO ML20249B4271998-06-19019 June 1998 Application for Amends to Licenses NPF-10 & NPF-15,reducing Minimum Primary RCS Cold Leg Temp from 544 F to 535 F Between 70% & 100% Rated Thermal Power Levels & Eliminating Max RCS Flow Rate Limit ML20249A6511998-06-12012 June 1998 Application for Amends 178 & 164 to Licenses DPR-10 & DPR-15,revising Turbine Missile Protection Calculation Methodology,Per UFSAR Section,3.5, Missile Protection. Rev 1 to GEC-Alsthom Analysis Rept Encl.Subj Rept Withheld ML20216B6051998-05-11011 May 1998 Suppl 1 to Application for Amends 161 & 145 to Licenses NPF-10 & NPF-15,respectively,requesting Changes to Surveillance Requirements (Srs) 3.6.1.1,3.6.2.1 & 3.6.3.6 & Creating New TS 5.5.2.14 ML20216B4031998-05-0707 May 1998 Applications for Amend to Licenses NPF-10 & NPF-15,revising TS Section 1.1, Definitions, to Change Reference Used for Obtaining Dose Conversion Factors for Calculating Dose Equivalent I-131 ML20217P8391998-04-0606 April 1998 Application for Amends to Licenses NPF-10 & NPF-15,revising Containment Isolation Valves Completion Times ML20216B9991998-03-0606 March 1998 Application for Amends 175 & 161 to Licenses NPF-10 & Proposed Change 490,eliminating Ref to Inverters in TS 3.4.12.1 ML20199K6371998-01-0909 January 1998 Corrected Suppl 1 to Application for Amends 152 & 136 to Licenses NPF-10 & NPF-15,respectively ML20198H6651998-01-0909 January 1998 Suppl 1 to Application to Amends 152 & 136 to Licenses NPF-10 & NPF-15,revising TS 3.5.1, Safety Injection Tanks, to Extend,In General,Completion Time for Single Inoperable Safety Injection Tank from 1 H to 24 H ML20198H8381998-01-0909 January 1998 Suppl 1 to Application for Amends 151 & 135 to Licenses NPF-10 & NPF-15,revising TS 3.5.2, ECCS-Operating, to Extend Allowed Outage Time from 72 H to 7 Days for Single Low Pressure Safety Injection Train ML20198H7441998-01-0909 January 1998 Suppl 1 to Application for Amends 150 & 134 to Licenses NPF-10 & NPF-15,revising TS 3.8.1, AC Sources - Operating, to Extend Offsite Circuit Completion Time from 72 H & 6 Days from Discovery of Failure to Meet LCO to 72 H & 17 Days ML20198E5941998-01-0505 January 1998 Proposed Change Number 482 to Application for Amends 174 & 160 to Licenses NPF-10 & NPF-15.Amends Revise TS 3.7.5, AFW Sys & Bases to Indicate Turbine Driven AFW Pump Is Operable When Running in Manual Mode to Shutdowns & Testing ML20197C7001997-12-19019 December 1997 Application for Amends to Licenses NPF-10 & NPF-15,reducing Pressurizer Water Level Required for Operability to Be Consistent W/Certain Updated FSAR Chapter 15 Events Which Were Recently Reanalyzed ML20199H9441997-11-25025 November 1997 Supplemental Application for Amend to Licenses NPF-10 & NPF-15,respectively,revising License Condition 2G to Replace Region V W/Region IV ML20199C6191997-11-14014 November 1997 Suppl 1 to Application for Amends 138 & 122 to Licenses NPF-10 & NPF-15,revising Ufsar,Section 3.5 to Allow Use of Probability of Damage to Critical Components in Evaluating tornado-generated Missile Protection Barriers ML20217J9491997-10-17017 October 1997 Application for Amends to Licenses NPF-10 & NPF-15, Requesting Permission of Radiation Monitoring Sys Upgrade ML20217A8181997-09-16016 September 1997 Application for Amends to Licenses NPF-10 & NPF-15.Amends Consist of Proposed TS Changes to TS 3.4.13,5.5.2.11,5.7.2 & Affected Bases,Allowing SG Tube Repair Using Asea Brown/Boveri/Combusting Engineering Leak Tight Sleeving ML20148R3751997-06-30030 June 1997 Applications 165 & 149 to Licenses NPF-10 & NPF-15, Consisting of Proposed TS Change NPF-10/15-475 (PCN-475),to Delete SONGS Unit 2 License Condition 2.C.(19)b & Revise SONGS Units 2 & 3 TS ML20141B4421997-06-18018 June 1997 Applications 168 & 154 for Amends to Licenses NPF-10 & NPF-15,respectively,requesting Revision to TS 3.8.1, AC Sources - Operating & Applicable Bases ML20137V2251997-04-15015 April 1997 Application for Amends to Licenses NPF-10 & NPF-15, Requesting Rev of SR 3.8.1.8 & Applicable Bases to TS 3.8.1, AC Sources - Operating. Proposed Change Allows Credit Overlap Testing ML20134P9841997-02-21021 February 1997 Application for Amend to License NPF-15,which Would Clarify in Note Which Relays Will Not Be Response Time Tested Until Next Songs,Unit 3 Refueling Outage to Satisfy SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation ML20138L1011997-02-18018 February 1997 Application for Amend to License NPF-15,to Defer Implementation of SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation, for 30 Subgroup Relays Until Next Refueling Outage on Songs,Unit 3 ML20134J6921997-02-0707 February 1997 Application for Amend to License NPF-15,consisting of PCN-479,revising TS SR 3.1.5.4, CEA Alignment ML20134A9861997-01-24024 January 1997 Application for Amends to Licenses NPF-10 & NPF-15,to Revise SR 3.8.1.9 to TS 3.8.1, AC Sources - Operating, Which Will More Accurately Reflect Safety Analysis Conditions ML20133G9061997-01-14014 January 1997 Application for Amends to License NPF-15,requesting Rev to TSs 3.8.1.14 & 3.8.1.15, AC Sources - Operating, Surveillance Requirements ML20128P3441996-10-11011 October 1996 Application for Amends to Licenses NPF-10 & NPF-15, Requesting Change to Reinstate Provisions of SONGS Unit 2 & 3 TS Revised as Part of NRC Amendment 127 & 116 ML20117K9851996-08-30030 August 1996 Application for Amends 153 & 137 to Licenses NPF-10 & NPF-15,respectively,clarifying Figures 3.7.18-1 & 3.7.18-2 by Adding Line at 4.8 Weight % Initial U-235 Enrichment to Show Acceptable Zone of Operation Ends Maximum 4.8 W/O ML20116C6741996-07-29029 July 1996 Application for Amends 146 & 130 to Licenses NPF-10 & NPF-15 Consisting of Change Request 443,permitting Increase in Licensed Storage Capacity of Spent Fuel Pools,By Allowing Fuel to Be Consolidated After Required Time in SFP ML20113C2541996-06-25025 June 1996 Application for Amends 159 & 143 to Licenses NPF-10 & NPF-15 Revising TS 3.3.11, Pami, & TS 5.5.2.13, Diesel Fuel Oil Testing Program ML20112D4511996-06-0303 June 1996 Applications 159 & 143 for Amend to Licenses NPF-10 & NPF-15,consisting of Change Number 466,reinstating Provisions of Current SONGS TS Revised as Part of NRC Amends 127 & 116 ML20117J8371996-05-30030 May 1996 Applications for Amends 161 & 145 to Licenses NPF-10 & NPF-15,consisting of Change Number 468,requesting Changes to SR 3.6.1.1,SR 3.6.2.1 & SR 3.6.3.6 Which Allows Implementation of Option B to 10CFR50,App J ML20117J4431996-05-29029 May 1996 Amends 162 & 146 to Licenses NPF-10 & NPF-15,respectively, Consisting of Proposed Change Number 465,changing Unit 2 Amend 127 & Unit 3 Amend 116 Approved TS 3.5.1, Safety Injection Tanks ML20112D0231996-05-29029 May 1996 Application for Amends to Licenses NPF-10 & NPF-15, Consisting of PCN-454,revising Acceptance Criteria for Agastat Time Delay Relays Used in ESF Load Sequencer in TS 3.8.1.18, A.C. Sources - Operating ML20117D7991996-05-0909 May 1996 Amend Applications 160 & 144 to Licenses NPF-10 & NPF-15, Consisting of Proposed TS Change Number 467,adding Section 5.5.2.14, Barrier Control Program ML20108E3251996-05-0808 May 1996 Application for Amends to Licenses NPF-10 & NPF-15, Consisting of Change Number 458,revising Unit 2 Amend 127 & Unit 3 Amend 116 Changing TS 3.9.4 & 3.9.5 1999-08-11
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217B4401999-10-0707 October 1999 Amends 159 & 150 to Licenses NPF-10 & NPF-15,revising License Condition 2.C(19) for Unit 2 & 2.C(17)d for Unit 3 & TS 3.3.11 Re Hydrogen Monitoring Requirements ML20211R0411999-09-0909 September 1999 Amends 158 & 149 to Licenses NPF-10 & NPF-15,respectively, Modifying TS Surveillance Requirements Re Diesel Generator Testing ML20212A2321999-09-0707 September 1999 Amends 157 & 148 to Licenses NPF-10 & NPF-15,respectively, Consisting of Changes to TS 3.3.5, ESFAS Instrumentation, in Response to 981231 Application & Suppl ML20211E9281999-08-19019 August 1999 Amends 156 & 147 to Licenses NPF-10 & NPF-15,respectively, Revising TS 3.4.10, Pressurizer Safety Valves, to Increase as-found Pressurizer Safety Valve Setpoint Tolerances ML20211F1921999-08-19019 August 1999 Amends 155 & 146 to Licenses NPF-10 & NPF-15,respectively, Changing TS in Response to Application ML20210P5931999-08-11011 August 1999 Amend Application Number 189 for License NPF-10 & Amend Application Number 174 for License NPF-15,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Calculation E4C-098 ML20209G3331999-07-12012 July 1999 Amends 154 & 145 to Licenses NPF-10 & NPF-15,respectively, Authorizing Changes to UFSAR to Permit Installation of Digital Radiation Monitors for Both Containment Purge Isolation & Control Room Isolation Signals ML20195E5061999-06-0808 June 1999 Application for Amends to Licenses NPF-10 & NPF-15, Consisting of Proposed Change Number 495,which Revises TS 3.5.2,3.1.9,3.7.1 & 5.1.7.5 ML20207A0151999-05-13013 May 1999 Amends 153 & 144 to Licenses NPF-10 & NPF-15,respectively, Modifying TSs to Allow Refueling Operation with 20 Ft of Water Level in Refueling Cavity for Many Operating Conditions & at 12 Ft of Water Level for Certain Conditions ML20205T2841999-04-24024 April 1999 Amend Application 187 to License NPF-10,consisting of Proposed Change Number 504,requesting NRC Approval to Repair Degraded But Operable Shutdown Cooling Sys Check Valves at Unit 2 in Normal Operation (Mode 1) ML20205N2601999-04-0909 April 1999 Amends 151 & 143 to Licenses NPF-10 & NPF-15,respectively, Revise SR 3.8.1.9 to TS 3.8.1, AC Sources-Operating, to More Accurately Reflect Test Conditions & Plant Design Requirements ML20204B9731999-03-12012 March 1999 Application for Amends to Licenses DPR-13,NPF-1 & NPF-15, Revising SONGS Physical Security Plan & Safeguards Contingency Plan Tactical Response Plan for Defending Site Against Safeguards Emergencies.Details of Amend Withheld ML20203J1771999-02-12012 February 1999 Amends 149 & 141 to Licenses NPF-10 & NPF-15,respectively, Modifying TS to Reduce Min RCS Cold Leg Temp,Convert Specified RCS Flow from Mass Units to Volumetric Units & Eliminate Max RCS Flow Rate Limit from TS ML20199D0331999-01-13013 January 1999 Suppl 1 to Amend Applications 157 & 141 to Licenses NPF-10 & NPF-15,respectively,restricting Required Action Completion Time to Close All Containment Penetrations Providing Direct Access from Containment Atmosphere to Outside Atmosphere ML20206R2761999-01-11011 January 1999 Amends Applications 185 & 171 to Licenses NPF-10 & NPF-15, Consisting of Proposed TS Change Number 499,requesting Rev to TS 3.7.6 & Associated Bases to Increase Required Water Volume in CST T-120 from 280,000 to 360,000 Gallons ML20198L6131998-12-31031 December 1998 Amend Applications 184 & 170 to Licenses NPF-10 & NPF-15, Consisting of Proposed Change 501,requesting Rev of TS 3.3.5, ESFAS Instrumentation ML20198G3741998-12-22022 December 1998 Proposed TS Change Number 489 to Amend Applications 176 & 162 to Licenses NPF-10 & NPF-15,changing TS 5.5.2.11, SG Tube Surveillance Program ML20198H5151998-12-21021 December 1998 Amends 146 & 138 to Licenses NPF-10 & NPF-15,respectively, Revising Licensing Basis to Incorporate New Turbine Missile Protection Calculation Methodology ML20206N6141998-12-16016 December 1998 Amends 145 & 137 to Licenses NPF-10 & NPF-15,respectively, Revising Reference for Obtaining Thyroid Dose Conversion Factors Used in Definition of Dose Equivalent I-131 in TS Section 1.1, Definitions, for Plant ML20196J1681998-12-0808 December 1998 PCN-493 to Amends 183 & 169 to Licenses NPF-10 & NPF-15, Revising Units 2 & 3 Tech Specs 3.4.10, Pressurizer Safety Valves, Consistent with Certain UFSAR Chapter 15 Events Recently Reanalyzed ML20195J8961998-11-23023 November 1998 Amends 182 & 168 to Licenses NPF-10 & NPF-15,consisting of Proposed Tech Spec Change Number 498,revising TS 3.3.1, RPS Instrumentation - Operating ML20195J9461998-11-23023 November 1998 Amends 178 & 164 to Licenses NPF-10 & NPF-15,consisting of Proposed Tech Specs Change Number (PCN-494),revising UFSAR Pages Necessary to Identify Programs Which Govern Test Intervals for Turbine ML20155B9511998-10-26026 October 1998 Amends 143 & 134 to Licenses NPF-10 & NPF-15,respectively, Modifying TSs to Eliminate Ref to Shutdown Cooling Sys Isolation Bypass Valve Inverters ML20155B8631998-10-20020 October 1998 Application for Amends to Licenses NPF-10 & NPF-15, Respectively.Proposed Change Number 485 Adds SR to TS 3.3.9, CR Isolation Signal ML20154B9331998-09-25025 September 1998 Amend 142 to License NPF-10,revising TS to Change Operative Parameter for Setting & Removing Operating Bypass Bistables. Operative Parameter in TS Changed from Thermal Power to Logarithmic Power ML20153G7471998-09-22022 September 1998 Amends 181 & 167 to Licenses NPF-10 & NPF-15,respectively, Revising TS 3.3.1, RPS Instrumentation - Operating, Re RT Operating Bypass Removal Process Variable ML20151W6751998-09-10010 September 1998 Application for Amends 180 & 166 to Licenses NPF-10 & NPF-15,eliminating Requirements for Hydrogen Control Sys from Low Power Plant License Condition 2.C(19)i & from TSs 3.3.11 & 3.6.7 ML20151T6521998-09-0404 September 1998 Application for Amends to Licenses NPF-10 & NPF-15,revising TS 3.4.10 by Increasing as-found Psv Setpoint Tolerances ML20239A1401998-08-26026 August 1998 Amends 140 & 132 to Licenses NPF-10 & NPF-15,respectively, Allowing Sleeving of SG Tubes W/Sleeves Designed by Vendor, ABB-CE ML20236S6221998-07-22022 July 1998 Suppl 2 to Applications for Amend to Licenses NPF-10 & NPF-15,revising TS 3.8.1 by Extending Offsite Circuit Completion Time from 72 Hr & 6 Days from Discovery of Failure to Meet LCO ML20249B4271998-06-19019 June 1998 Application for Amends to Licenses NPF-10 & NPF-15,reducing Minimum Primary RCS Cold Leg Temp from 544 F to 535 F Between 70% & 100% Rated Thermal Power Levels & Eliminating Max RCS Flow Rate Limit ML20249C7331998-06-19019 June 1998 Amends 139 & 131 to Licenses NPF-10 & NPF-15,respectively, Modifying TSs to Extend Allowed Outage Times for Single Inoperable SIT from 1 H to 24 H ML20249A6511998-06-12012 June 1998 Application for Amends 178 & 164 to Licenses DPR-10 & DPR-15,revising Turbine Missile Protection Calculation Methodology,Per UFSAR Section,3.5, Missile Protection. Rev 1 to GEC-Alsthom Analysis Rept Encl.Subj Rept Withheld ML20216B6051998-05-11011 May 1998 Suppl 1 to Application for Amends 161 & 145 to Licenses NPF-10 & NPF-15,respectively,requesting Changes to Surveillance Requirements (Srs) 3.6.1.1,3.6.2.1 & 3.6.3.6 & Creating New TS 5.5.2.14 ML20216B4031998-05-0707 May 1998 Applications for Amend to Licenses NPF-10 & NPF-15,revising TS Section 1.1, Definitions, to Change Reference Used for Obtaining Dose Conversion Factors for Calculating Dose Equivalent I-131 ML20217P8391998-04-0606 April 1998 Application for Amends to Licenses NPF-10 & NPF-15,revising Containment Isolation Valves Completion Times ML20216B9991998-03-0606 March 1998 Application for Amends 175 & 161 to Licenses NPF-10 & Proposed Change 490,eliminating Ref to Inverters in TS 3.4.12.1 ML20199K6371998-01-0909 January 1998 Corrected Suppl 1 to Application for Amends 152 & 136 to Licenses NPF-10 & NPF-15,respectively ML20198H8381998-01-0909 January 1998 Suppl 1 to Application for Amends 151 & 135 to Licenses NPF-10 & NPF-15,revising TS 3.5.2, ECCS-Operating, to Extend Allowed Outage Time from 72 H to 7 Days for Single Low Pressure Safety Injection Train ML20198H6651998-01-0909 January 1998 Suppl 1 to Application to Amends 152 & 136 to Licenses NPF-10 & NPF-15,revising TS 3.5.1, Safety Injection Tanks, to Extend,In General,Completion Time for Single Inoperable Safety Injection Tank from 1 H to 24 H ML20198H7441998-01-0909 January 1998 Suppl 1 to Application for Amends 150 & 134 to Licenses NPF-10 & NPF-15,revising TS 3.8.1, AC Sources - Operating, to Extend Offsite Circuit Completion Time from 72 H & 6 Days from Discovery of Failure to Meet LCO to 72 H & 17 Days ML20198E5941998-01-0505 January 1998 Proposed Change Number 482 to Application for Amends 174 & 160 to Licenses NPF-10 & NPF-15.Amends Revise TS 3.7.5, AFW Sys & Bases to Indicate Turbine Driven AFW Pump Is Operable When Running in Manual Mode to Shutdowns & Testing ML20197C7001997-12-19019 December 1997 Application for Amends to Licenses NPF-10 & NPF-15,reducing Pressurizer Water Level Required for Operability to Be Consistent W/Certain Updated FSAR Chapter 15 Events Which Were Recently Reanalyzed ML20202J1051997-12-0303 December 1997 Amends 137 & 129 to Licenses NPF-10 & NPF-15,respectively, Deleting License Condition 2.C(26) for Unit 2 & Condtion 2.C(27) for Unit 3 ML20199H9441997-11-25025 November 1997 Supplemental Application for Amend to Licenses NPF-10 & NPF-15,respectively,revising License Condition 2G to Replace Region V W/Region IV ML20199C6191997-11-14014 November 1997 Suppl 1 to Application for Amends 138 & 122 to Licenses NPF-10 & NPF-15,revising Ufsar,Section 3.5 to Allow Use of Probability of Damage to Critical Components in Evaluating tornado-generated Missile Protection Barriers ML20217J9491997-10-17017 October 1997 Application for Amends to Licenses NPF-10 & NPF-15, Requesting Permission of Radiation Monitoring Sys Upgrade ML20217A8181997-09-16016 September 1997 Application for Amends to Licenses NPF-10 & NPF-15.Amends Consist of Proposed TS Changes to TS 3.4.13,5.5.2.11,5.7.2 & Affected Bases,Allowing SG Tube Repair Using Asea Brown/Boveri/Combusting Engineering Leak Tight Sleeving ML20148R3751997-06-30030 June 1997 Applications 165 & 149 to Licenses NPF-10 & NPF-15, Consisting of Proposed TS Change NPF-10/15-475 (PCN-475),to Delete SONGS Unit 2 License Condition 2.C.(19)b & Revise SONGS Units 2 & 3 TS ML20141B4421997-06-18018 June 1997 Applications 168 & 154 for Amends to Licenses NPF-10 & NPF-15,respectively,requesting Revision to TS 3.8.1, AC Sources - Operating & Applicable Bases 1999-09-09
[Table view] |
Text
. - _ -... -. -.
1 UNITED STATES OF AMERICA l
NUCLEAR REGULATORY COMMISSION 1
l Application of SOUTHERN CALIFORNIA
)
Docket No. 50-361 EDISON COMPANY, ET AL.
for a Class 103
)
License to Acquire, Possess, and Use
)
a utilization Facility as Part of
)
Amendment Application Unit No. 2 of the San Onofre Nuclear
)
No. 150 l
Generating Station
)
SOUTHERN CALIFORNIA EDIS0N COMPANY, ET AL. pursuant to 10 CFR 50.90, hereby l
submit Amendment Application No. 150.
This amendment application consists of Proposed Change Number (PCN)-453 to Facility Operating License No. NPF-10.
PCN-453 is a request to revise Unit 2 l
post PCN-299 (Technical Specification Improvement Program) Technical Specification (TS) 3.8.1, "AC Sources - Operating," to 1) extend the Offsite Circuit Allowed Outage Time (A0T) from "72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND 6 days from discovery of failure to meet LC0" to "72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND 10 days from discovery of failure to meet LC0" and 2) extend the Emergency Diesel Generator (EDG) A0T from "72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND 6 days from discovery of failure to meet LC0" to "7 days AND 10 days from discovery of failure to meet LCO."
Additionally, PCN-453 proposes to further extend the EDG A0T to "10 days AND 10 days from discovery of failure to meet LC0" on a once-per-refueling cycle frequency.
1 951107o344 9s11o2 PDR ADOCK 05000361 P
PDR
Subscribed on this 2nd day of November
,1995 l
Respectfully submitted, SOUTHERN CALIFORNIA EDISON COMPANY b
By:
K,*
/tf
~ Richard M.' Rosenblum Vice President l
State of California
]
County of San Diego 1
on Nov. 2, 1995 before me, Linda L. Rulon/ Notary Public I
personally appeared Richard M. Rosenblum
. personally known to me to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument.
WITNESS my hand and official seal.
Signature b bh
^ ^ ^ ^ ^ - - - - -
e UND,A L,RtA04 l
cc, mm
.l Notwy Pubilocalsforth 3
ORANGE COUNTY My comm. expres IMA W,H06 1
4
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION l
Application of SOUTHERN CALIFORNIA
)
Docket No. 50-362 EDISON COMPANY, ET AL.
for a Class 103
)
License to Acquire, Possess, and Use
)
a Utilization Facility as Part of
)
Amendment Application Unit No. 3 of the San Onofre Nuclear
)
No. 134 Generating Station
)
SOUTHERN CALIFORNIA EDIS0N COMPANY, ET AL. pursuant to 10 CFR 50.90, hereby submit Amendment Application No. 134.
This amendment application consists of Proposed Change Number (PCN)-453 to Facility Operating License No. NPF-15.
PCN-453 is a request to revise Unit 3 post PCN-299 (Technical Specification Improvement Program) Technical Specification (TS) 3.8.1, "AC Sources-0perating," to 1) extend the Offsite Circuit Allowed Outage Time (A0T) from "72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND 6 days from discovery of failure to meet LC0" to "72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND 10 days from discovery of failure to meet LC0" and 2) extend the Emergency Diesel Generator (EDG) A0T from "72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND 6 days from discovery of failure to meet LC0" to "7 days AND 10 days from discovery of failure to meet LCO."
Additionally, PCN-453 proposes to further extend the EDG A0T to "10 days AND 10 days from discovery of failure to meet LC0" on a once-per-refueling cycle frequency.
l Subscribed on this 2nd day of November
,1995.
Respectfully submitted, SOUTHERN CALIFORNIA EDIS0N COMPANY By:
p e
l Richard M! Rosenblum Vice President l
State of California County of San Diego on Nov. 2, 1995 before me, Linda L. Rulon/ Notary Public personally appeared Richard M. Rosenblum
, personally known to i
l me to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument.
WITNESS my hand and official seal.
Signature 1
- uuu=
t
[
Notary PutbCaslande ORANGE COUNTY M comm. expres MAR 04,1998 lf l
l
l DESCRIPTION AND SAFETY ANALYSIS l
0F PROPOSED CHANGE NPF-10/15-453 This is a request to revise the San Onofre Units 2 and 3 post PCN-299 (Technical Specification Improvement Program) Technical Specification (TS) 3.8.1, "AC Sources - Operating,"
Post PCN-299 (Technical Specification Improvement Proaram) Specifications Unit 2:
See Attachment "A" Unit 3:
See Attachment "B" l
Proposed Specifications Unit 2:
See Attachment "C" i
Unit 3:
See Attachment "D" DESCRIPTION OF PROPOSED CHANGES In post PCN-299 TS 3.8.1, "AC Sources-Operating:"
o Extend the Second Completion Time in Required Action A.2 for an inoperable Offsite Circuit from "6 days from discovery of failure to meet LC0" to "10 days from discovery of failure to meet LCO."
o Extend the Allowed Outage Time (A0T) in Required Action B.4 for a single inoperable Emergency Diesel Generator (EDG) from "72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND 6 days from discovery of failure to meet LC0" to "7 days AND 10 days from discovery of failure to meet LCO."
o Add a Note in Condition B to further extend the EDG A0T in Required i
Action B.4 to "10 days AND 10 days from discovery of failure to r,1eet l
LC0" on a "once-per-refueling cycle" frequency.
Included in Attachment "C" for Unit 2 and Attachment "D" for Unit 3, respectively, are revised post PCN-299 LC0 pages 3.8-1 and 3.8-2, and revised Bases pages B3.8-6, B3.8-9, and B3.8-29.
Due to text overflow, Bases pages B3.8-10 through B3.8-21 are included for completeness.
BACKGROUND San Onofre Units 2 and 3 are each equipped with two seismically qualified, i
Class 1E, diesel engine driven generators which supply backup electrical power to the 4160 volt vital AC busses.
Each EDG is connected to the 4160 volt bus of a load group.
Each EDG is designed to automatically start in the event of l
a bus undervoltage condition on the 4160 volt Class 1E bus to which it is connected (loss of voltage signal-LOVS) or upon receipt of a Safety Injection Actuation Signal (SIAS).
I 1
1
Each EDG is designed to start automatically so that within 10 seconds following receipt of a start signal it is operating at rated speed and ready to begin load sequencing.
The EDG is sized to supply reliable power to all safety-related loads in its respective load group, as well as specific nonsafety related loads. Loads supplied by each EDG are determined on the basis of nameplate or service factor rating, pump pressure and flow conditions, or pump runout conditions.
Each EDG has a continuous load rating of 4700 KW.
For emergency standby duty, the manufacturer allows specific overload values up to 116.1% of continuous duty rating based on the total hours the EDG is operated per year.
The EDGs may be contro: led or placed within their specific operating modes from the mimic bus panel in the control room or from a local panel within each EDG room.
These prov'sions allow EDG operation for surveillance testing and manual start and load operations, as well as l aal operations.
The EDGs are described in Section 8.3.1 of the _s, Onofre Units 2 and 3 Updated Final Safety Analysis Report (UFSAR).
DISCUSSION OF CHANGE The San Onofre Units 2 and 3 post PCN-299 (Technical Specification Improvement Program) Technical Specification (TS) 3.8.1 requires if an EDG is declared inoperable for any reason, the EDG must be restored to operable status within "72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND 6 days from discovery of failure to meet LC0" or place the plant in Hot Standby within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Cold Shutdown within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
The proposed amendment would allow up to "7 days AND 10 days from discovery of failure to meet LC0" to restore EDG operability. The proposed change also makes provisions for "10 days AND 10 days from discovery of failure to meet LC0" A0T for a single inoperable EDG based on a "once-per-refueling cycle" frequency for the purpose of performing corrective or preventive maintenance necessary to restore EDG operability or improve its reliability.
The proposed amendment also extends the Second Completion Time for an inoperable Offsite Circuit from "6 days from discovery of failure to meet LC0" to "10 days from discovery of failure to meet LC0" to be consistent with the change in the EDG A0T.
The Second Completion Time in the A0Ts for the EDG and Offsite Circuit provides a limit on the maximum time allowed for any combination of required alternating current power sources to be inoperable during any single contiguous occurrence of failing to meet the Limiting Condition for Operation.
Implementation of this proposed A0T extension will:
o Allow increased flexibility in the scheduling and performance of preventive maintenance o
Reduce the number of individual entries into LCO action statements by providing sufficient time to perform related maintenance tasks with a single entry o
Allow better control of resource allocation.
During outage maintenance windows, plant personnel and resources are spread across a large number 2
-. - -. ~. - -
)
i and wide variety of maintenance tasks. Allowing on-line preventive maintenance (including overhauls) gives the flexibility to focus more quality resources on any required or elected EDG maintenance.
l Avert unplanned plant shutdowns and minimize the potential for requests o
for Notice of Enforcement Discretions (N0EDs).
Risks incurred by unexpected plant shutdowns can be comparable to and often exceed those associated with continued power operation.
o Improve EDG availability during shutdown modes.
o Permit scheduling of EDG overhauls of up to 10 days on-line.
CE NPSD-996, CEOG " Joint Applications Report for Emergency Diesel Generators A0T Extension," provided detailed results of an integrated assessment of the overall risk associated with the adoption of the proposed EDG A0T extension.
This evaluation includes an assessment considering the risk associated with "at power," " transition," and " shutdown" operations and utilized Probabilistic Safety Analysis (PSA) methodology to fully evaluate the effect of the EDG A0T extension. The results of the evaluation are summarized below, l
Assessment of At Power Risk i
The evaluation of "at power risk" change resulting from the extended A0T was performed using plant specific information from each of the participating CE0G members.
The results for San Onofre Units 2 and 3 show that the proposed A0T changes could increase the average core damage frequency (CDF) by 4%.
Assessment of Transition Risk Transition risk represents the risk associated with reducing power and going to hot shutdown or cold shutdown modes.
This risk identifies the tradeoff between shutting the plant down and restoring EDG operability while the plant continues to operate.
The results of this risk assessment indicate that performing a 7-day A0T corrective maintenance at power, as compared to shutting down the plant to perform the work, would be risk beneficial.
Assessment of Shutdown Risk Shutdown risk is associated with removing an EDG from service while the plant is in a shutdown mode of operation.
The results of this risk assessment indicate that performing corrective or preventive maintenance at power would:
1) be risk neutral when compared with early outage maintenance, and 2) result in a slight increase in risk when compared with late outage maintenance.
However, performing EDG maintenance at power will provide greater EDG reliability upon entering shutdown modes than if maintenance had been performed at the end of a refueling outage.
3
=. -
The CE NPSD-996 report evaluated the impact of the proposed A0T extension on large early release scenarios.
Large early release scenarios are releases arising from 1) containment bypass events (e.g., interfacing system LOCAs, steam generator tube ruptures with concomitant loss of steam generator isolation), 2) severe accidents accompanied by loss of containment isolation, and 3) containment failure associated with energetic events in containment.
The evaluation concluded that the increased unavailability of one EDG will result in a negligible impact on large early release probability.
The CE NPSD-996 report concludes that an EDG A0T extension from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 7 days with a once-per-refueling cycle 10-day A0T may potentially result in a small increase in the "at power" risk.
However, when full scope of plant risk j
is considered, the risks incurred by extending the A0T for either corrective or preventive maintenance will be substantially offset by plant benefits associated with avoiding unnecessary plant transitions, reducing risks during plant shutdown operations and improved EDG reliability upon entering shutdown.
The data and risk results in CE NPSD-996 pertaining to the San Onofre units were supplied and endorsed by Southern California Edison.
SAFETY ANALYSIS The proposed change described above shall be deemed to involve a significant hazards consideration if there is a positive finding in any one of the following areas:
1.
Will operation of the facility in accordance with this proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response
No The Emergency Diesel Generators (EDGs) are backup alternating current power sources designed to power essential safety systems in the event of a loss of offsite power.
EDGs are not accident initiators in any accident previously evaluated.
Therefore, this change does not involve an increase in the probability of an accident previously evaluated.
The EDGs provide backup power to components that mitigate the consequences of accidents. The proposed changes to the Allowed Outage Times (A0Ts) do not affect any of the assumptions used in the deterministic safety analysis.
To fully evaluate the effect of the EDG A0T extension, Probabilistic Safety Analysis (PSA) methods were utilized.
The results of these analyses show no significant increase in the core damage frequency. As a result, there would be no significant increase in the consequences of accidents previously evaluated.
Therefore, this change does not involve a significant increase in the probability or consequences of any accident previously evaluated.
4
2.
Will operation of the facility in accordance with this proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No This proposed change does not alter the design, configuration, or method of operation of the plant. Therefore, this change does not create the possibility of a new or different kind of eccident from any previously evaluated.
3.
Will operation of the facil!ty in accordance with this proposed change involve a significant reduction in a margin of safety?
Response: No The proposed changes do not affect the Limiting Conditions for Operation or their Bases that are used in the deterministic analyses to establish the margin of safety.
PSA evaluations were used to evaluate these changes, and these evaluations determined that the changes are either risk neutral or risk beneficial.
Therefore, this change does not involve a significant reduction in the margin of safety.
Safety and Sionificant Hazards Determination Based on the above Safety Analysis, it is concluded that: 1) the proposed change does not constitute a significant hazards consideration as defined by 10 CFR 50.92 and 2) there is reasonable assurance that the health and safety of the public will not be endangered by the proposed change. Moreover, because this action does not involve a significant hazards consideration, it will also not result in a condition which significantly alters the impact of the station on the environment as described in the NRC Final Environmental Statement.
5
. ~.
4 4
ATTACHMENT "A" POST PCN-299 (TECHNICAL SPECIFICATION IMPROVEMENT PROGRAM) SPECIFICATIONS UNIT 2