MONTHYEARML20210P5931999-08-11011 August 1999 Amend Application Number 189 for License NPF-10 & Amend Application Number 174 for License NPF-15,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Calculation E4C-098 ML20195E5061999-06-0808 June 1999 Application for Amends to Licenses NPF-10 & NPF-15, Consisting of Proposed Change Number 495,which Revises TS 3.5.2,3.1.9,3.7.1 & 5.1.7.5 ML20205T2841999-04-24024 April 1999 Amend Application 187 to License NPF-10,consisting of Proposed Change Number 504,requesting NRC Approval to Repair Degraded But Operable Shutdown Cooling Sys Check Valves at Unit 2 in Normal Operation (Mode 1) ML20204B9731999-03-12012 March 1999 Application for Amends to Licenses DPR-13,NPF-1 & NPF-15, Revising SONGS Physical Security Plan & Safeguards Contingency Plan Tactical Response Plan for Defending Site Against Safeguards Emergencies.Details of Amend Withheld ML20199D0331999-01-13013 January 1999 Suppl 1 to Amend Applications 157 & 141 to Licenses NPF-10 & NPF-15,respectively,restricting Required Action Completion Time to Close All Containment Penetrations Providing Direct Access from Containment Atmosphere to Outside Atmosphere ML20206R2761999-01-11011 January 1999 Amends Applications 185 & 171 to Licenses NPF-10 & NPF-15, Consisting of Proposed TS Change Number 499,requesting Rev to TS 3.7.6 & Associated Bases to Increase Required Water Volume in CST T-120 from 280,000 to 360,000 Gallons ML20198L6131998-12-31031 December 1998 Amend Applications 184 & 170 to Licenses NPF-10 & NPF-15, Consisting of Proposed Change 501,requesting Rev of TS 3.3.5, ESFAS Instrumentation ML20198G3741998-12-22022 December 1998 Proposed TS Change Number 489 to Amend Applications 176 & 162 to Licenses NPF-10 & NPF-15,changing TS 5.5.2.11, SG Tube Surveillance Program ML20196J1681998-12-0808 December 1998 PCN-493 to Amends 183 & 169 to Licenses NPF-10 & NPF-15, Revising Units 2 & 3 Tech Specs 3.4.10, Pressurizer Safety Valves, Consistent with Certain UFSAR Chapter 15 Events Recently Reanalyzed ML20195J9461998-11-23023 November 1998 Amends 178 & 164 to Licenses NPF-10 & NPF-15,consisting of Proposed Tech Specs Change Number (PCN-494),revising UFSAR Pages Necessary to Identify Programs Which Govern Test Intervals for Turbine ML20195J8961998-11-23023 November 1998 Amends 182 & 168 to Licenses NPF-10 & NPF-15,consisting of Proposed Tech Spec Change Number 498,revising TS 3.3.1, RPS Instrumentation - Operating ML20155B8631998-10-20020 October 1998 Application for Amends to Licenses NPF-10 & NPF-15, Respectively.Proposed Change Number 485 Adds SR to TS 3.3.9, CR Isolation Signal ML20153G7471998-09-22022 September 1998 Amends 181 & 167 to Licenses NPF-10 & NPF-15,respectively, Revising TS 3.3.1, RPS Instrumentation - Operating, Re Rt Operating Bypass Removal Process Variable ML20151W6751998-09-10010 September 1998 Application for Amends 180 & 166 to Licenses NPF-10 & NPF-15,eliminating Requirements for Hydrogen Control Sys from Low Power Plant License Condition 2.C(19)i & from TSs 3.3.11 & 3.6.7 ML20151T6521998-09-0404 September 1998 Application for Amends to Licenses NPF-10 & NPF-15,revising TS 3.4.10 by Increasing as-found Psv Setpoint Tolerances ML20236S6221998-07-22022 July 1998 Suppl 2 to Applications for Amend to Licenses NPF-10 & NPF-15,revising TS 3.8.1 by Extending Offsite Circuit Completion Time from 72 Hr & 6 Days from Discovery of Failure to Meet LCO ML20249B4271998-06-19019 June 1998 Application for Amends to Licenses NPF-10 & NPF-15,reducing Minimum Primary RCS Cold Leg Temp from 544 F to 535 F Between 70% & 100% Rated Thermal Power Levels & Eliminating Max RCS Flow Rate Limit ML20249A6511998-06-12012 June 1998 Application for Amends 178 & 164 to Licenses DPR-10 & DPR-15,revising Turbine Missile Protection Calculation Methodology,Per UFSAR Section,3.5, Missile Protection. Rev 1 to GEC-Alsthom Analysis Rept Encl.Subj Rept Withheld ML20216B6051998-05-11011 May 1998 Suppl 1 to Application for Amends 161 & 145 to Licenses NPF-10 & NPF-15,respectively,requesting Changes to Surveillance Requirements (Srs) 3.6.1.1,3.6.2.1 & 3.6.3.6 & Creating New TS 5.5.2.14 ML20216B4031998-05-0707 May 1998 Applications for Amend to Licenses NPF-10 & NPF-15,revising TS Section 1.1, Definitions, to Change Reference Used for Obtaining Dose Conversion Factors for Calculating Dose Equivalent I-131 ML20217P8391998-04-0606 April 1998 Application for Amends to Licenses NPF-10 & NPF-15,revising Containment Isolation Valves Completion Times ML20216B9991998-03-0606 March 1998 Application for Amends 175 & 161 to Licenses NPF-10 & Proposed Change 490,eliminating Ref to Inverters in TS 3.4.12.1 ML20198H6651998-01-0909 January 1998 Suppl 1 to Application to Amends 152 & 136 to Licenses NPF-10 & NPF-15,revising TS 3.5.1, Safety Injection Tanks, to Extend,In General,Completion Time for Single Inoperable Safety Injection Tank from 1 H to 24 H ML20199K6371998-01-0909 January 1998 Corrected Suppl 1 to Application for Amends 152 & 136 to Licenses NPF-10 & NPF-15,respectively ML20198H7441998-01-0909 January 1998 Suppl 1 to Application for Amends 150 & 134 to Licenses NPF-10 & NPF-15,revising TS 3.8.1, AC Sources - Operating, to Extend Offsite Circuit Completion Time from 72 H & 6 Days from Discovery of Failure to Meet LCO to 72 H & 17 Days ML20198H8381998-01-0909 January 1998 Suppl 1 to Application for Amends 151 & 135 to Licenses NPF-10 & NPF-15,revising TS 3.5.2, ECCS-Operating, to Extend Allowed Outage Time from 72 H to 7 Days for Single Low Pressure Safety Injection Train ML20198E5941998-01-0505 January 1998 Proposed Change Number 482 to Application for Amends 174 & 160 to Licenses NPF-10 & NPF-15.Amends Revise TS 3.7.5, AFW Sys & Bases to Indicate Turbine Driven AFW Pump Is Operable When Running in Manual Mode to Shutdowns & Testing ML20197C7001997-12-19019 December 1997 Application for Amends to Licenses NPF-10 & NPF-15,reducing Pressurizer Water Level Required for Operability to Be Consistent W/Certain Updated FSAR Chapter 15 Events Which Were Recently Reanalyzed ML20199H9441997-11-25025 November 1997 Supplemental Application for Amend to Licenses NPF-10 & NPF-15,respectively,revising License Condition 2G to Replace Region V W/Region IV ML20199C6191997-11-14014 November 1997 Suppl 1 to Application for Amends 138 & 122 to Licenses NPF-10 & NPF-15,revising Ufsar,Section 3.5 to Allow Use of Probability of Damage to Critical Components in Evaluating tornado-generated Missile Protection Barriers ML20217J9491997-10-17017 October 1997 Application for Amends to Licenses NPF-10 & NPF-15, Requesting Permission of Radiation Monitoring Sys Upgrade ML20148R3751997-06-30030 June 1997 Applications 165 & 149 to Licenses NPF-10 & NPF-15, Consisting of Proposed TS Change NPF-10/15-475 (PCN-475),to Delete SONGS Unit 2 License Condition 2.C.(19)b & Revise SONGS Units 2 & 3 TS ML20141B4421997-06-18018 June 1997 Applications 168 & 154 for Amends to Licenses NPF-10 & NPF-15,respectively,requesting Revision to TS 3.8.1, AC Sources - Operating & Applicable Bases ML20137V2251997-04-15015 April 1997 Application for Amends to Licenses NPF-10 & NPF-15, Requesting Rev of SR 3.8.1.8 & Applicable Bases to TS 3.8.1, AC Sources - Operating. Proposed Change Allows Credit Overlap Testing ML20134P9841997-02-21021 February 1997 Application for Amend to License NPF-15,which Would Clarify in Note Which Relays Will Not Be Response Time Tested Until Next Songs,Unit 3 Refueling Outage to Satisfy SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation ML20138L1011997-02-18018 February 1997 Application for Amend to License NPF-15,to Defer Implementation of SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation, for 30 Subgroup Relays Until Next Refueling Outage on Songs,Unit 3 ML20134J6921997-02-0707 February 1997 Application for Amend to License NPF-15,consisting of PCN-479,revising TS SR 3.1.5.4, CEA Alignment ML20134A9861997-01-24024 January 1997 Application for Amends to Licenses NPF-10 & NPF-15,to Revise SR 3.8.1.9 to TS 3.8.1, AC Sources - Operating, Which Will More Accurately Reflect Safety Analysis Conditions ML20133G9061997-01-14014 January 1997 Application for Amends to License NPF-15,requesting Rev to TSs 3.8.1.14 & 3.8.1.15, AC Sources - Operating, Surveillance Requirements ML20128P3441996-10-11011 October 1996 Application for Amends to Licenses NPF-10 & NPF-15, Requesting Change to Reinstate Provisions of SONGS Unit 2 & 3 TS Revised as Part of NRC Amendment 127 & 116 ML20117K9851996-08-30030 August 1996 Application for Amends 153 & 137 to Licenses NPF-10 & NPF-15,respectively,clarifying Figures 3.7.18-1 & 3.7.18-2 by Adding Line at 4.8 Weight % Initial U-235 Enrichment to Show Acceptable Zone of Operation Ends Maximum 4.8 W/O ML20116C6741996-07-29029 July 1996 Application for Amends 146 & 130 to Licenses NPF-10 & NPF-15 Consisting of Change Request 443,permitting Increase in Licensed Storage Capacity of Spent Fuel Pools,By Allowing Fuel to Be Consolidated After Required Time in SFP ML20113C2541996-06-25025 June 1996 Application for Amends 159 & 143 to Licenses NPF-10 & NPF-15 Revising TS 3.3.11, Pami, & TS 5.5.2.13, Diesel Fuel Oil Testing Program ML20112D4511996-06-0303 June 1996 Applications 159 & 143 for Amend to Licenses NPF-10 & NPF-15,consisting of Change Number 466,reinstating Provisions of Current SONGS TS Revised as Part of NRC Amends 127 & 116 ML20117J8371996-05-30030 May 1996 Applications for Amends 161 & 145 to Licenses NPF-10 & NPF-15,consisting of Change Number 468,requesting Changes to SR 3.6.1.1,SR 3.6.2.1 & SR 3.6.3.6 Which Allows Implementation of Option B to 10CFR50,App J ML20117J4431996-05-29029 May 1996 Amends 162 & 146 to Licenses NPF-10 & NPF-15,respectively, Consisting of Proposed Change Number 465,changing Unit 2 Amend 127 & Unit 3 Amend 116 Approved TS 3.5.1, Safety Injection Tanks ML20112D0231996-05-29029 May 1996 Application for Amends to Licenses NPF-10 & NPF-15, Consisting of PCN-454,revising Acceptance Criteria for Agastat Time Delay Relays Used in ESF Load Sequencer in TS 3.8.1.18, A.C. Sources - Operating ML20117D7991996-05-0909 May 1996 Amend Applications 160 & 144 to Licenses NPF-10 & NPF-15, Consisting of Proposed TS Change Number 467,adding Section 5.5.2.14, Barrier Control Program ML20108E3251996-05-0808 May 1996 Application for Amends to Licenses NPF-10 & NPF-15, Consisting of Change Number 458,revising Unit 2 Amend 127 & Unit 3 Amend 116 Changing TS 3.9.4 & 3.9.5 ML20107B9781996-04-11011 April 1996 Application for Amends 158 & 142 to Licenses NPF-10 & NPF-15,respectively,revising TS 3.6.3, Containment Isolation Valves, to Resolve Inconsistency in TSs 1999-08-11
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20210P5931999-08-11011 August 1999 Amend Application Number 189 for License NPF-10 & Amend Application Number 174 for License NPF-15,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Calculation E4C-098 ML20195E5061999-06-0808 June 1999 Application for Amends to Licenses NPF-10 & NPF-15, Consisting of Proposed Change Number 495,which Revises TS 3.5.2,3.1.9,3.7.1 & 5.1.7.5 ML20205T2841999-04-24024 April 1999 Amend Application 187 to License NPF-10,consisting of Proposed Change Number 504,requesting NRC Approval to Repair Degraded But Operable Shutdown Cooling Sys Check Valves at Unit 2 in Normal Operation (Mode 1) ML20204B9731999-03-12012 March 1999 Application for Amends to Licenses DPR-13,NPF-1 & NPF-15, Revising SONGS Physical Security Plan & Safeguards Contingency Plan Tactical Response Plan for Defending Site Against Safeguards Emergencies.Details of Amend Withheld ML20199D0331999-01-13013 January 1999 Suppl 1 to Amend Applications 157 & 141 to Licenses NPF-10 & NPF-15,respectively,restricting Required Action Completion Time to Close All Containment Penetrations Providing Direct Access from Containment Atmosphere to Outside Atmosphere ML20206R2761999-01-11011 January 1999 Amends Applications 185 & 171 to Licenses NPF-10 & NPF-15, Consisting of Proposed TS Change Number 499,requesting Rev to TS 3.7.6 & Associated Bases to Increase Required Water Volume in CST T-120 from 280,000 to 360,000 Gallons ML20198L6131998-12-31031 December 1998 Amend Applications 184 & 170 to Licenses NPF-10 & NPF-15, Consisting of Proposed Change 501,requesting Rev of TS 3.3.5, ESFAS Instrumentation ML20198G3741998-12-22022 December 1998 Proposed TS Change Number 489 to Amend Applications 176 & 162 to Licenses NPF-10 & NPF-15,changing TS 5.5.2.11, SG Tube Surveillance Program ML20196J1681998-12-0808 December 1998 PCN-493 to Amends 183 & 169 to Licenses NPF-10 & NPF-15, Revising Units 2 & 3 Tech Specs 3.4.10, Pressurizer Safety Valves, Consistent with Certain UFSAR Chapter 15 Events Recently Reanalyzed ML20195J8961998-11-23023 November 1998 Amends 182 & 168 to Licenses NPF-10 & NPF-15,consisting of Proposed Tech Spec Change Number 498,revising TS 3.3.1, RPS Instrumentation - Operating ML20195J9461998-11-23023 November 1998 Amends 178 & 164 to Licenses NPF-10 & NPF-15,consisting of Proposed Tech Specs Change Number (PCN-494),revising UFSAR Pages Necessary to Identify Programs Which Govern Test Intervals for Turbine ML20155B8631998-10-20020 October 1998 Application for Amends to Licenses NPF-10 & NPF-15, Respectively.Proposed Change Number 485 Adds SR to TS 3.3.9, CR Isolation Signal ML20153G7471998-09-22022 September 1998 Amends 181 & 167 to Licenses NPF-10 & NPF-15,respectively, Revising TS 3.3.1, RPS Instrumentation - Operating, Re Rt Operating Bypass Removal Process Variable ML20151W6751998-09-10010 September 1998 Application for Amends 180 & 166 to Licenses NPF-10 & NPF-15,eliminating Requirements for Hydrogen Control Sys from Low Power Plant License Condition 2.C(19)i & from TSs 3.3.11 & 3.6.7 ML20151T6521998-09-0404 September 1998 Application for Amends to Licenses NPF-10 & NPF-15,revising TS 3.4.10 by Increasing as-found Psv Setpoint Tolerances ML20236S6221998-07-22022 July 1998 Suppl 2 to Applications for Amend to Licenses NPF-10 & NPF-15,revising TS 3.8.1 by Extending Offsite Circuit Completion Time from 72 Hr & 6 Days from Discovery of Failure to Meet LCO ML20249B4271998-06-19019 June 1998 Application for Amends to Licenses NPF-10 & NPF-15,reducing Minimum Primary RCS Cold Leg Temp from 544 F to 535 F Between 70% & 100% Rated Thermal Power Levels & Eliminating Max RCS Flow Rate Limit ML20249A6511998-06-12012 June 1998 Application for Amends 178 & 164 to Licenses DPR-10 & DPR-15,revising Turbine Missile Protection Calculation Methodology,Per UFSAR Section,3.5, Missile Protection. Rev 1 to GEC-Alsthom Analysis Rept Encl.Subj Rept Withheld ML20216B6051998-05-11011 May 1998 Suppl 1 to Application for Amends 161 & 145 to Licenses NPF-10 & NPF-15,respectively,requesting Changes to Surveillance Requirements (Srs) 3.6.1.1,3.6.2.1 & 3.6.3.6 & Creating New TS 5.5.2.14 ML20216B4031998-05-0707 May 1998 Applications for Amend to Licenses NPF-10 & NPF-15,revising TS Section 1.1, Definitions, to Change Reference Used for Obtaining Dose Conversion Factors for Calculating Dose Equivalent I-131 ML20217P8391998-04-0606 April 1998 Application for Amends to Licenses NPF-10 & NPF-15,revising Containment Isolation Valves Completion Times ML20216B9991998-03-0606 March 1998 Application for Amends 175 & 161 to Licenses NPF-10 & Proposed Change 490,eliminating Ref to Inverters in TS 3.4.12.1 ML20199K6371998-01-0909 January 1998 Corrected Suppl 1 to Application for Amends 152 & 136 to Licenses NPF-10 & NPF-15,respectively ML20198H8381998-01-0909 January 1998 Suppl 1 to Application for Amends 151 & 135 to Licenses NPF-10 & NPF-15,revising TS 3.5.2, ECCS-Operating, to Extend Allowed Outage Time from 72 H to 7 Days for Single Low Pressure Safety Injection Train ML20198H6651998-01-0909 January 1998 Suppl 1 to Application to Amends 152 & 136 to Licenses NPF-10 & NPF-15,revising TS 3.5.1, Safety Injection Tanks, to Extend,In General,Completion Time for Single Inoperable Safety Injection Tank from 1 H to 24 H ML20198H7441998-01-0909 January 1998 Suppl 1 to Application for Amends 150 & 134 to Licenses NPF-10 & NPF-15,revising TS 3.8.1, AC Sources - Operating, to Extend Offsite Circuit Completion Time from 72 H & 6 Days from Discovery of Failure to Meet LCO to 72 H & 17 Days ML20198E5941998-01-0505 January 1998 Proposed Change Number 482 to Application for Amends 174 & 160 to Licenses NPF-10 & NPF-15.Amends Revise TS 3.7.5, AFW Sys & Bases to Indicate Turbine Driven AFW Pump Is Operable When Running in Manual Mode to Shutdowns & Testing ML20197C7001997-12-19019 December 1997 Application for Amends to Licenses NPF-10 & NPF-15,reducing Pressurizer Water Level Required for Operability to Be Consistent W/Certain Updated FSAR Chapter 15 Events Which Were Recently Reanalyzed ML20199H9441997-11-25025 November 1997 Supplemental Application for Amend to Licenses NPF-10 & NPF-15,respectively,revising License Condition 2G to Replace Region V W/Region IV ML20199C6191997-11-14014 November 1997 Suppl 1 to Application for Amends 138 & 122 to Licenses NPF-10 & NPF-15,revising Ufsar,Section 3.5 to Allow Use of Probability of Damage to Critical Components in Evaluating tornado-generated Missile Protection Barriers ML20217J9491997-10-17017 October 1997 Application for Amends to Licenses NPF-10 & NPF-15, Requesting Permission of Radiation Monitoring Sys Upgrade ML20148R3751997-06-30030 June 1997 Applications 165 & 149 to Licenses NPF-10 & NPF-15, Consisting of Proposed TS Change NPF-10/15-475 (PCN-475),to Delete SONGS Unit 2 License Condition 2.C.(19)b & Revise SONGS Units 2 & 3 TS ML20141B4421997-06-18018 June 1997 Applications 168 & 154 for Amends to Licenses NPF-10 & NPF-15,respectively,requesting Revision to TS 3.8.1, AC Sources - Operating & Applicable Bases ML20137V2251997-04-15015 April 1997 Application for Amends to Licenses NPF-10 & NPF-15, Requesting Rev of SR 3.8.1.8 & Applicable Bases to TS 3.8.1, AC Sources - Operating. Proposed Change Allows Credit Overlap Testing ML20134P9841997-02-21021 February 1997 Application for Amend to License NPF-15,which Would Clarify in Note Which Relays Will Not Be Response Time Tested Until Next Songs,Unit 3 Refueling Outage to Satisfy SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation ML20138L1011997-02-18018 February 1997 Application for Amend to License NPF-15,to Defer Implementation of SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation, for 30 Subgroup Relays Until Next Refueling Outage on Songs,Unit 3 ML20134J6921997-02-0707 February 1997 Application for Amend to License NPF-15,consisting of PCN-479,revising TS SR 3.1.5.4, CEA Alignment ML20134A9861997-01-24024 January 1997 Application for Amends to Licenses NPF-10 & NPF-15,to Revise SR 3.8.1.9 to TS 3.8.1, AC Sources - Operating, Which Will More Accurately Reflect Safety Analysis Conditions ML20133G9061997-01-14014 January 1997 Application for Amends to License NPF-15,requesting Rev to TSs 3.8.1.14 & 3.8.1.15, AC Sources - Operating, Surveillance Requirements ML20132B9051996-12-13013 December 1996 Revised TS Pages D6.1-1,D6.2-1 & D6.5-4 for Amend 158 to License DPR-13 ML20128P3441996-10-11011 October 1996 Application for Amends to Licenses NPF-10 & NPF-15, Requesting Change to Reinstate Provisions of SONGS Unit 2 & 3 TS Revised as Part of NRC Amendment 127 & 116 ML20128L7141996-10-0303 October 1996 Amend 158 to License DPR-13,revising Section 2.D of Plant, Unit 1 Operating License to Remove Reporting Requirement Redundant to Reporting Requirements in 10CFR50.72 & 50.73 ML20117K9851996-08-30030 August 1996 Application for Amends 153 & 137 to Licenses NPF-10 & NPF-15,respectively,clarifying Figures 3.7.18-1 & 3.7.18-2 by Adding Line at 4.8 Weight % Initial U-235 Enrichment to Show Acceptable Zone of Operation Ends Maximum 4.8 W/O ML20116C6741996-07-29029 July 1996 Application for Amends 146 & 130 to Licenses NPF-10 & NPF-15 Consisting of Change Request 443,permitting Increase in Licensed Storage Capacity of Spent Fuel Pools,By Allowing Fuel to Be Consolidated After Required Time in SFP ML20113C2541996-06-25025 June 1996 Application for Amends 159 & 143 to Licenses NPF-10 & NPF-15 Revising TS 3.3.11, Pami, & TS 5.5.2.13, Diesel Fuel Oil Testing Program ML20112D4511996-06-0303 June 1996 Applications 159 & 143 for Amend to Licenses NPF-10 & NPF-15,consisting of Change Number 466,reinstating Provisions of Current SONGS TS Revised as Part of NRC Amends 127 & 116 ML20117J8371996-05-30030 May 1996 Applications for Amends 161 & 145 to Licenses NPF-10 & NPF-15,consisting of Change Number 468,requesting Changes to SR 3.6.1.1,SR 3.6.2.1 & SR 3.6.3.6 Which Allows Implementation of Option B to 10CFR50,App J ML20117J4431996-05-29029 May 1996 Amends 162 & 146 to Licenses NPF-10 & NPF-15,respectively, Consisting of Proposed Change Number 465,changing Unit 2 Amend 127 & Unit 3 Amend 116 Approved TS 3.5.1, Safety Injection Tanks ML20112D0231996-05-29029 May 1996 Application for Amends to Licenses NPF-10 & NPF-15, Consisting of PCN-454,revising Acceptance Criteria for Agastat Time Delay Relays Used in ESF Load Sequencer in TS 3.8.1.18, A.C. Sources - Operating ML20117D7991996-05-0909 May 1996 Amend Applications 160 & 144 to Licenses NPF-10 & NPF-15, Consisting of Proposed TS Change Number 467,adding Section 5.5.2.14, Barrier Control Program 1999-08-11
[Table view] |
Text
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Application of SOUTHERN CALIFORNIA EDIS0N COMPANY, H .A_L. for a Class 103 Docket No. 50-361 License to Acquire, Possess, and Use a Utilization Facility as Part of Amendment Application Unit No. 2 of the San Onofre Nuclear No. 160 Generating Station SOUTHERN CALIFORNIA EDISON COMPANY, H R . pursuant to 10 CFR 50.90, hereby submit Amendment Application No. 160. This amendment application consists of Proposed Change Number No. NPF-10-467 to Facility Operating License NPF-10.
Proposed Change Number No. NPF-10-467 is a request to change Unit 2 Amendment No.127 approved Technical Specifications by adding section 5.5.2.14, Barrier 1 Control Program.
Subscribed on this V day of b , 1996.
% l l
Respectfully Submitted, SOUTHERN CALIFORNIA EDIS 1 COMPANY By , ,
W 9605140366 960509
~
DwightE.N\nn i PDR ADOCK 05000361 P PDR Vice President State of California ,
county A 1A 0 y b LN)
C On O f h@ before me,! ,
persona"ly appeared h [b [ b UAJA) , personally known to me to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument.
.m j
WITNE. my hand and official seal. MANMNE SANCHEZ
~
- 4 - COVM f 1*J U63 h "(f ' No+ory Ptt,fic -- Cc"ferrdo Signat e j My comm x t h4.1998
{( , . - c+ T , .- n
I UNITED STATES OF AMERICA l
NUCLEAR REGULATORY COMMISSION Application of SOUTHERN CALIFORNIA EDISON COMPANY, H R. for a Class 103 Docket No. 50-362 i License to Acquire, Possess, and Use a Utilization Facility as Part of Amendment Application Unit No. 3 of the San Onofre Nuclear No. 144 Generating Station 1
1 SOUTHERN CALIFORNIA EDIS0N COMPANY, H R . pursuant to 10 CFR 50.90, hereby submit Amendment Application No. 144. This amendment application consists of Proposed Change Number NPF-15-467 to Facility Operating License NPF-15.
l Proposed Change Number NPF-15-467 is a request to change the Unit 3 Amendment j No. 116 approved Technical Specifications by adding section 5.5.2.14, Barrier )
Control Program. l l Subscribed on this day of , 1996.
j j Respectfully Submitted, SOUTHERN CALIFORNIA EDISONg COMPANY B - .1-- -
DwightE.Nbn Vice President state of Ca}jforni .
County 1 /k/N On 6f f h(B before me, J [ bMO 1/D, personakly appeared bl0(Mtb b b(Ltt A) , personally known to me to be the personwhosenameissubscribedtothewithininstrumentandacknowledgedtomethathe executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument.
WITNESS and and official sea MA M signature s I ~
Notcry Public - C# iod
%. oW4GE COL'd j
My Comm. Eoros Od R W n n
ENCLOSURE 1 DESCRIPTION AND SAFETY ANALYSIS OF PROPOSED CHANGE NPF-10/15-467 l
l l
l l
l l
DESCRIPTION AND SAFETY ANALYSIS OF PROPOSED CHANGE NPF-10/15-467 Pro)osed Change Number (PCN) 467 is a request to add Section 5.5.2.14 to the Tec1nical Specifications for San Onofre Nuclear Generating Station (SONGS)
Units 2 and 3 to maintain a Barrier Control Program.
Units 2 and 3 Technical Specifications Unit 2 Amendment No. 127 and Unit 3 Amendment No. 116 Approved Technical Specifications Unit 2: See Attachment "A" Unit 3: See Attachment "B"
-Proposed Technical Specifications Unit 2: See Attachment "C" Unit 3: See Attachment "0" DESCRIPTION OF CHANGES:
This amendment request is to add the following section 5.5.2.14 to the '
Technical Specifications (TSs) to control barriers:
" Barrier Control Program This program provides controls for plant barriers which protect structures, systems, and components from 1) missiles from internal sources and adjacent buildings, 2) flooding from tsunami, internal sources, and adjacent buildings, and 3) environmental hazards (such as steam and radiation). The normal configuration of these plant barriers is closed and functional. Barrier impairments are allowed if:
- a. The average annual cumulative risk of fuel damage from design basis events attributable to barrier impairments does not exceed 1.0E-6.
Barrier allowed outage times are based on typical times needed to restore the barrier, implement alternate barriers, remove the hazard (s),orimplementcompensatorymeasures. Barrier allowed outage times with compensatory measures in place are based on typical times needed to perform plant maintenance, or
- b. Justified by a 10CFR50.59 safety evaluation, or
- c. The protected equipment is declared INOPERABLE, or is not required to be OPERABLE."
BACKGROUND:
i In September 1993, certain watertight doors, hatches, and penetration seals 1 l were removed from the Unit 3 Safety Equipment Building (SE) to support I pre-outage construction activities. The watertight doors, hatches, and l L penetration seals are part of the barriers separating redundant trains of safety related equipment. An NRC inspector noticed this configuration and questioned whether these barriers, with the doors, hatches, and seals open, ,
were abh to perform their design functions and whether the effects of 1 design a @ ovents ha6 been fully evaluated. j In response to the NRC inspector inquiry, Southern California Edison (Edison) initiated an investigation of the expected plant response to i design basis events with the altered barrier configuration. An engineering evaluation concluded that potential design basis scenarios existed which could have adversely affected the ability to achieve and maintain cold shutdown. At this point, Edison restored all SE barriers to their original configurations.
Edison reported the Unit 3 condition to the NRC in Licensee Event Report 2-93-009 dated November 24, 1993. Subsequently, Edison committed to maintain interim administrative controls for the Units 2 and 3 plant barrier configurations, in accordance with 10 CFR 50.59 requirements, until a long-tem barrier control program would be established (Letter from R. M. Rosenblum to B. H. Faulkenberry dated December 23,1993).
The long-term barrier control program was to include appropriate. control 1 measures for each hazard barrier and' eliminate the need to evaluate hazard i barrier. impairments on a case-by-case basis. The strategy to address this l concern for the long-term program is to request a TS amendment that would decouple barrier functiontlity from equipment operability for a limited time. This is similar to the decoupling of safety system: operability from that of some support systens (e.g., fire doors and snubbers) in the l existing TSs.
l l DISCUSSION:
1 The long-term barrier control program addresses passive devices required to mitigate and protect the plant against the consequences of specific design basis hazard events defined in the U) dated Final Safety Analysis Report (UFSAR). Currently, the onlj way a aarrier may be opened is by the l successful completion of a 10CFR50.59 safety analysis or by declaring
!. " inoperable" the equipment protected by the barrier.-
This amendment is to decouple equipment operability from barrier operability by a conservative Allowed Outage Time (A0T). The A0T for barrier impairments without compensatory actions is based on the lesser of
- 1) typical times needed to restore the barrier, implement alternate l barriers, remove the hazard (s), or implement compensatory measures, or i 2) average annual cumulative increase in fuel damage risk of <1.0E-6. The
! A0T for barrier impairments with compensatory actions is based on the
- lesser of 1) typical times needed to perform plant maintenance, or 2) j average annual cumulative increase in fuel damage risk of <1.0E-6. This 2-
[
l change will facilitate maintenance and reduce the costs of the existing program by reducing the number of 10CFR50.59 evaluations for opening barriers.
i Basing the A0T on fuel damage rather than core damage will extend the controls of the barrier control program to the spent fuel pool and the fuel handling building. Minimal impact on plant safety will be ensured by limiting the average annual cumulative risk of fuel damage due to barrier impairments to <1.0E-6, even though some barriers may affect both trains of safety systems simultaneously.
! Edison intends to implement the long-term program through a Licensee Controlled Specification (LCS). An in-depth discussion, including the program description, scope, methodology, and draft Licensee Controlled Specification for Unit 2 are attached, for information only, as Enclosure 2 to this submittal.
The probabilistic risk assessment (PRA) supporting the LCS will calculate the fuel damage likelihood attributable to barrier impairment by multiplying the frequency of initiating events by the unavailability of one or more barriers required to ensure the operability of proximate ,
risk-significant components and then by the ccnditional fuel damage I probability given those components subsequently fail.
Initiating event frequencies are conservatively derived from generic industry data bases. Conditional fuel damage probabilities are calculated i using the San Onofre probabilistic risk assessment models for at-power and I shutdown conditions. Barrier unavailabilities assumed in the risk l assessment were based on 1) frequencies of barrier impairments derived from historic records, and 2) durations of barrier impairments (i.e., allowed l outage time) based on estimated future needs and risk-significance. A !
description of the probabilistic risk assessment (PRA) methodology l supporting the LCS will be sent to the Document Control Desk by June 28, 1996.
1 NRC CONCERNS l A meeting was held on September 28, 1994, between members of the NRC staff and Edison to discuss Edison's methodology for the long-term barrier l program. The barriers under consideration are located in all the buildings I that contain equipment important to safety, with the exception of the containment buildings. The hazards discussed during this meeting were limited to internal missiles, internal floods, and equipment qualification hazards (steam and radiation). The other hazards controlled by barriers '
within the plant (e.g., fire and security hazards) are managed by separate established programs and would not be affected by the long-term barrier control program. The NRC staff noted three concerns as a result of this meeting.
l l
l l
- 1. The results of the pilot program showed that many of the barriers -
could be inoperable for significant periods of time without exceeding the acceptance criteria chosen by the licensee, which is reflected by the lengthy allowable outage times (unlimited for some barriers) in the proposed administrative procedures. The licensee should select l the allowable outage times based on the length of time these barriers '
are needed to be open, by applying the operating experience of the ;
plant, and use the probabilistic acceptance criteria to support these outage times.
Resolution:
The allowed outage times were re-evaluated using new criteria. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> A0T (without compensatory measures) is based on typical barrier repair time (e.g., water-tight doors), and the 7 day A0T (with compensatory measures) is based on major equipment overhaul time.
There is also a more restrictive 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> A0T (without compensatory measures), which applies to critical circulating water system (CWS) flood barriers. The 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> A0T for these barriers-is based on the time required to implement the applicable compensatory measures (e.g.,
Turbine Building flood watch and a berm).
- 2. It would be more appropriate to apply the concept of a small increment in core damage frequency (i.e.,1.5% increase) to the entire proposed administrative controls program, rather than to each hazard's effect on each of the barriers. This more conservative approach would provide a clear understanding of the risks associated with the proposed changes.
Resolution:
The risk associated with impaired barriers was re-evaluated to assess the cumulative effect of open barriers.
The PRA model has two barrier categories: a) locked /securedmovable barriers, and b) unlocked / unsecured movable barriers. Separate impairment frequencies were used for each category based on historical.
data. Impairment frequencies were further separated into shutdown and power operations. The effects of barrier impairments were evaluated during all modes of operation. Barrier allowed outage times were selected to limit the average annual cumulative probability of fuel damage from all barrier impairments to 1.0E-6. This acceptance criterion is an average value. While the contribution to fuel damage probability due to barrier impairments could exceed 1.0E-6 in a given year (although unlikely due to conservatism used in the PRA models),
on average this contribution will be less than 1.0E-6/ year.
A permanent increase of 1.0E-6/ year in San Onofre's fuel damage frequency would be characterized by the PSA Applications Guide (EPRI'TR-105396) as "non-risk significant." The SONGS 2/3 Individual Plant Examination submitted April 29, 1993 reported a total core i damage frequency 3.0E-5/yr. I I
r ;
- j. 1 i ;
l l
- 3. The use of allowed outage times in the technical specifications is an established method for permitting temporary devtotions from the design basis of the plant. The use of this concept in administrative controls for this situatlon, and the passible implications of compliance with specific regulations (i.e.,10 CFR 50.49, environmental qualification of electrical equipment) needs to be carefully reviewed by both the licensee and the staff.
Resolution:
As noted in the NRC concern, technical specifications are an established method for permitting temporary deviations from the design basis of the plant. Edison has therefore chosen this method to implement the long-term barrier program.
l SAFETY ANALYSIS:
The proposed- change described above shall be deemed to involve a significant hazards consideration if there is any positive finding in any one of the following areas.
- 1. Will operation of the facility in accordance with this proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No The proposed change will allow a passive support system, plant barriers, to be taken out of service for a specific allowed outage time. Since the allowed outage times are to' limit the average annual cumulative increase in fuel damage risk to less than 1.0E-6, there will not be a significant increase in either the probability or consequences of any accident previously evaluated.
Additionally, the proposed change will allow barrier impairments if allowed by a 10CFR50.59 evaluation and also if the equipment is declared inoperable or is not needed. Since these two conditions are already a part of the i San Onofre Units 2 and 3 Licensing Basis, there will be no change in the I probability or consequences of an accident previously evaluated. i 1
- 2. Will operation of the facility in accordance with this proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No Barriers have been analyzed for specific hazards. The nature of these hazards will not change due to this amendment, and therefore no new or different kind of accident will be created from any accident previously evaluated.
I l
I
- 3. Will operation of the facility in accordance with this proposed change l involve a significant reduction in a margin of safety?
Response: No l Since allowing barrier impairments in accordance with 10CFR50.59 or declaring affected equipment inoperable is part of the SONGS Units 2 and 3 l Licensing Basis, there will be no reduction in the margin of safety from l these two criteria. l Allowing allowed outage times for barrier impairments does not have a 1 significant effect on a margin of safety because the average annual cumulative increase in fuel damage risk is limited to less than 1.0E-6/yr.
This small increase is about 3% of the San Onofre Units 2 and 3 core damage risk as reported in the Individual Plant Examination (IPE).
l SAFETY AND SIGNIFICANT HAZARDS DETERMINATION-l Based on the above Safety Analysis, it is concluded that: (1) the proposed change does not constitute a significant hazards consideration as defined by l 10 CFR 50.92; and (2) there is reasonable assurance that the health and safety I of the public will not be endangered by the proposed change. Moreover, because this action does not involve a significant hazards consideration, it will also not result in a condition which significantly alters the impact of the station on the environment as described in the NRC Final Environmental ;
Statement.