Confirms Actions Discussed in 820924 Telcon Re Problems in Remedial Soils QC Requalification Program
ML20091G505
Person / Time
Site: Midland
Issue date: 09/24/1982
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML17198A223 List: ... further results
References
CON-BOX-09, CON-BOX-9, FOIA-84-96 NUDOCS 8406040302
Download: ML20091G505 (2)


Text

i

.s C0hTIEMATORY ACTION LETIER

.# "88&g UNITED STATES j

fg NUCLEAR REGULATORY COMMISSION s c.( *g RE4toMlli d ' \\ ' ".;

E 709 RoostVELT MQAD d [

GLsN ELLYN,ILUNols 80137 SEP 2 4 562 Docket No. 50-329 Docket No. 50-330 Consunwrs Power Company ATTN: Mr. James W. Cook Vice President Midland Project 1945 West Parnall Road

" ~ ~ 3ackson, MI 49201 Gentlemen:

This 1 cuter confirr.a the telephone discussion on September 24, 1982 between Messrs. Warnick and Shafer of this offica and Mr. D. Miller and others of 1

, you staff regarding the problems in the remedial soils QC requalification program identified by Messrs. Gardner and Landsman.-

The purpose of this latter is to document our understanding of the actions you have taken or plan to taka.

~ ~ ~ ~ " ~

As a result of our discussion, we understand that you have initiated or plan to initiate the following actions:

(1) All von ou remedial soils has been stopped with the exception of those continuous activities such as maintaining the freeze wall and well pumping.

(2) All exa=1 nations related to remeMm1 soils QC requalification have stopped and all QC personnel previously certified have been decertified.

(3) A retraining program will be established and conducted for all QC personnal who failed and for future failures.

(4) A written examination will be developed fo'r all QC requalification examinations in the area of remedial. soils.

/

+

8406040302'840517

~"

l PDR FOIA j.

RICE 84-96 PDR l

L t.

.__gDNF_IRMATORY ACTION LETTER

]

5,'

m s

7 CONTIRMATORY ACTION LETIER consumers Power Company 7-

.~

6.

We also understand that you'will meet with our staff on_Saptember 29, 1982,'

to describe what measures you will establish to accelerate the requalification i

and certificat1un of t.be QC personnel involved in the balance of plant quality program.

If our understanding of your actions is not in accordance with the above, please contact this office imediately.

Sincerely, T

..-/ p.9 James C. Kepple Regional Administrator cc: DMB/ Document Control Desk (RIDS)

Resident Inspector,.RIII The Honorable Charlew Sechhoefer, ASLB_.

The Honorable Jerry Harbour, ASLB J

The Honorable Frederick P. Cowan ASLB

.. _, _. _ _ ' _ " _ The Honorable Ralph S. Docker. ASLB

' ~ ~ ~ "

Michael Miller Ronald Callen, Michigan Public service Commission Myron M. Cherry Barbara Stamiriu Mary Sinclair Wendell Marshall Colonel Steve J. Cadler (P.E.)

William Paton. ELD.

M o

...MO

_M 4

=:___

6 N

G_

a*

CONFIRMATORY ACTION LETTER

~

w A.

b

' %q$,..

f p

UNilL D s Tf,iES

/7[g

.( g) y g

NUCLEAR REGULATORY COMMISSION 3e WASHING 1 ON, D. C. 70555 March 23, 1983 PRINCIPAL STAFF' '

RA ENF I

/

Docket Nos: 50-329 OM, OL g$A o

s v

and 50-330 OM, OL 9 PAP sto DRNA RC D%15P

{V MEMORANDUM FOR:

The Atomic Safety and Licensin Board for the Midland Plant, Unit and 2 0L FILE /

FROM:

Thomas M. Nova'k, Assistant Director

$dflOL')h.fic/ AT,/

Div io o ensing b d DVhld b

SUBJECT:

NOTIFICATION OF CONSTRUCTION EVAL.UATION BY 1%NAGEMENT ANALYSIS COMPANY (BN-83-39)

In accordance with present NRC procedures regarding Board Notifications, the enclosed report entitled " Construction Project Evaluation of Consumers Poser Company Midland Energy Center Project Units 1 and 2", Revision 1 dated March 2, 1983, is being provided as infomation material and relevant to safety issues in the Midland OM/0L proceeding. The report presents the results of a self-initiated construction evaluation performed for Consumers Fc er Company (CPCo) by Management Analysis Company, with respect to the Midland Plant, Units 1 and 2.

The evaluation was conducted using the format developed by the Insti-tute of Nuclear Power Operation as described in CPCo's letter of October 5,1982.

The report also includes corrective actions for each finding as provided by CPCo with irput from Sechtel.

}7' Y, W Thomas M. Novak, Assistant Director for Licensing

. Division of Licensing

Enclosures:

As stated i

1 l

MAR 2819g3 iVHVSTW)6&

y A

~S s

M'IDLAND (Fer BNs) l l

Mr. J. W. Cook i

Vice President Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201 cc:

Stewart H. Freeman James G. Keppler, Regional Administrator Assistant Attorney General U.S. Nuclear Regulatory Commission, State of Michigan Enviornmental Region III Protection Division 799 Roosevelt Road 720 Law Building Glen Ellyn, Illinois 60137 Lansing, Michigan 48913 Mr. Ron Callen Mr. Roger W. Huston Michigan Public Service Commission Suite 220 6545 Mercantile Way 7910 Woodmont Avenue P.O. Box 30221 Bethesda, Maryland 20814 Lansing, Michigan 48909 Mr. R. B. Borsum Mr. Paul Rau Nuclear Power Generation Division Midland Daily News Babcock & Wilcox 124 Mcdonald Street 7910 Woodmont Avenue, Suite 220 Midland, Michigan 45640 Bethesda, Maryland 20814 Billie Pirner Garde Mr. Don van Farrowe, Chief Director, Citizens Clinic Division of Radiological Health for Accountable Government Department of Public Health Government Accountability Project P.O. Box 33035 Institute for Policy Studies Lansing, Michigan 48909 1901 Que Street, N.W.

Washington, D. C.

20009 U.S. Nuclear Regulatory Commission Resident Inspectors Office Commander, Naval Surface Weapons Center Route 7 ATTN: P. C. Huang Midland, Michigan 48540 White Oak Silver Spring, Maryland Mr. Paul A. Perry, Secretary 20910 Consumers Power Company Mr. L. J. Auge, Manager 212 W. Michigan Avenue facility Design Engir.eering Jackson, Michigan 49201 Energy Technology Engineering Center P.O. Box 1449 Mr. Walt Apley Canoga Park, Califorr.ia 91304 c/o Mr. Max Clausen Battelle Pacific-North West Labs (PUWL)

Mr. Neil Gahring Battelle Blvd.

U.S. Corps of Engineers SIGMA IV Building NCEED - T Richland, Washington 99352 7th floor 477 Michigan Avenue Mr. I. Charak, Manager Detroit, Michigan 45226 NRC Assistance Project Argonne National Laboratory Geotechnical Engineers, Inc.

9700 South Cass Avenue ATTN: Dr. Steve J. Pculos Argonne, Illinois 60439 1017 Main Street Winchester, Massachusetts 01890 i

O DISTRIBUTION LIST FOR BOARD NOTIFICATION Hidland Units 1&2, Docket Nos. 50-329/330 ACRS Members Charles Bechhoefer, Esq.

Dr. Robert C. Axtmann Lee't. Bishop, Esq.

Mr. Myer Bender James E. Brunner, Esq.

Dr. Max W. Carbon Dr. John H. Buck Mr. Jesse C. Ebersole Myron M. Cherry, P.C.

Mr. Harold Etherington Dr. Frederick P. Ccwan Dr. William Kerr 4

T. J. Creswell Dr. Harold W. Lewis Steve J. Galder, P.E.

Dr. J. Carson Mark Dr. Jerry Harbour Mr. William M. Mathis Mr. Wayne Hearn Dr. Dade W. Moeller Mr. James R. Kates Dr. Milton S. Plesset Frank J. Kelley, Esq.

Mr. Jeremiah J. Ray Christine N. Kohl, Esq.

Dr. David Okrent Mr. Wendell H. Marshall Dr. Paul C. Shewman Michael I. Miller, Esq.

Dr. Chester P. Siess Thomas S. Moore, Esq.

Mr. David A. Ward Mr. Paul Rau Ms. Mary Sinclair Ms. Barbara Stamiris Frederick C. Williams, Esq.

Atomic Safety and Licensing Soard Panel Atomic Safety and Licensing Appeal Panel Docketing and Service Section l

Document Management Branch er r m r.n...=. s e.,.

1. u. y

.m.

1 c-

.-t.

s D

ns.

.... ;.t c..

6 i ;iJ.. e,.

i u n w co.

. L{LQ s

Vice President - Projects, Engineen sg and Construction General offices: 1945 West Pernell Road, Jackson, MI 49201 = (517) 788 0453 PRINCIPAL STAFF I

March 9, 1983 p MvRA /d EF

'/

D/RA SCS V htdfh 3fRA

AO

()

DPRP

30

?MA C

I O.74SF 4

DE l

i j

Mr J G Keppler dL 1

l l

Regional Administrator O!-

IFI LEtMb US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glenn Ellyn, IL 60137 MIDLAND ENERGY CENTER PROJECT -

MIDLAND DOCKET NOS 50-329, 50-330 MIDLAND PLANT INPO TYPE EVALUATION -

FILE 0485.16 SERIAL 21769 In an October 5, 1982 letter to you and Mr H R Denton we enclosed details describing the proposed Midland Plant Independent Review Program. Based upon subsequent discussions with NRR and Region III we agreed to a program consisting of separate efforts by MAC to conduct the INPO Construction Program Evaluation and by Tera to conduct the Independent Design Verification.

As indicated in the October 5,1982 letter, "the final report will be submitted to the NRC and an auditable rec'ord will be maintained of all comments on any draft or final reports, any changes made as a result of such comments and the reasons for such changes." In compliance with this commitment and in keeping with industry's practice, we are submitting to you as the NRC Regional Administrator for the Midland Nuclear Plant three copies of the Self-Initiated Final Report by MAC entitled " Construction Project Evaluation of Consumers Power Company Midland Energy Center." The draft report was reviewed by INPO and changes were incorporated in the attached Final Report in response to the INPO rev!.ew.

v i

MAR 101983 l

oc0383-3938all2 j

,,,, > -i n f h.6 p '[ FM I<

.)

SERIAL 2

CC Atomic Safety & Licensing Appeal Board, (w/o)

CBechhoefer, ASLB, (w/o)

LLBishop, Esq, (w/o)

MMCherry, Esq, (w/o)

RJCook, Midland Resident Inspector, (w/o)

FPCowan, ASLB, (w/o)

RSDecker, ASLB, (w/o)

DGEisenhut, NRR, (w/o)

SGadler, Esq, (w/o)

JHarbour, ASLB, (w/o)

GHarstead, Harstead Engineering, (w/o)

DSHood, NRC, (w/o)

FJKelley, Esq, (w/o)

WHMarshall,(w/o)

WDPatton, Esq, (w/o)

WDShafer, NRC, (w/o)

BStamiris, (w/o)

MSinclair, (w/o) 4 oc0383-3938a112