ML20091F189
| ML20091F189 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 08/24/1983 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Jackie Cook CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML17198A223 | List:
|
| References | |
| CON-BOX-06, CON-BOX-6, FOIA-84-96 NUDOCS 8406020049 | |
| Download: ML20091F189 (2) | |
Text
. - _ _ _ _ - -.
=-
..~ ___.
u
.a, 4
T. =
f l
\\
AU8 2 41983 i
b
(
Docket No. 50-329 f.
Docket No. 50-330 Consumers Power Company ATIN: Mr. Janos W. Cook i
Vice President Midland Project 1945 West Parnall Road Jackson, MI 49201 t
Gentleasa This refers to a telephone discussion between Mr. D. Miller of your staff and as on August 24, 1983, and documents the matters discussed.
Region III has begun a special inspection of the Eack Company's present and past construction activities at Midland and included in this effort is a review of concerns brought to out attention by former Eack employees. This special inspection effort is intended to provide us additional confidence that the installed HVAC eystems and components at the Midised plants are acceptable and that you are implementing an adequate Q& program with regard
~
j to ongoing RVAC activities.
One facet of this effort involves a materials sampling progran covering installed RVAC ductwork and hangers from six safety-related systems and free stock materials. Although out sampling program is still being developed, we espect that approximately 60 samples will be taken. These samples will be i
taken under our direction and will be sent to an independent laboratory for analysis to verify chemical compositions and strength in accordance with the
]
i I
esterial specification requirements. The cost of these analyses will be i
funded by the NRC.
l I
For your information, and to help you coordinate your efforts in assisting us during the sampling process, we plan to implement this program at Midland during the week of August 29, 1983. Please contact Mr. Duane Danielson of I
my staff (312/932-2610) if you have further questions regarding this matter.
l-We appreciate your cooperation.
L I
sincerely, i
R. I, 5 pts M d bY l
pq p)nni UC Da er i'
B406020049 840517 R Le 8pessard, Director 8-J.p:83 83 i
PDR FOIA RICE 84-96 PDR Division of Engineering hl,g.,..8.gr......g.y....;....;;.;.w.....;g......;;.ag...g.g
?
p..........
- n....
.8 1...... a u.........e46n.......e.e.u....... o f.-o......... a-
+.u....... e.fu....4 p ~+
f l==c ronn aio no,soiwacu es4o OFF. ICIAL RECORD COPY
.gse,
- ""-** h
.....s
..... v.s.-
,g y-a w w...
.. ~ ~ <
,,...e.
.-4 I
j s
l 1,,
-.:. P.
9 i
Consumers Power Company AUG 2 4 983 DISTRIBUTIONT s
i ces EMB/ Document Control Desk (RIDS)
Basident Inspector, RIII The Bonorable Charles Bechhoefer, ASLB i
The Honorable Jerry Barbour, ASLB The Honorable Frederick P. Cowan, ASLB The Honorable Ralph 5. Deckor, ASLB William Faton, ILD Micheel Miller Ronald Callen, Michigan Public Service Commission Myron M. Cherry Barbara Stamiris
'"~.
Mary Sinclair Wendell Marshall i
colonel Steve J. Cadler (P.B.)
Howard Levin (TERA)
Billie F. Carde, Government Assountability Project Lynne Bernabei, Government Accountability Project t
,i i
i i
I i
omee)
- evenant)
OAft h 7
- juncronua........................................................................................................
ie no,eoe==cu oa o OFFICIAL RECORD COPY
- "' * * * 'I
}
.s.
_