ML20085G222
| ML20085G222 | |
| Person / Time | |
|---|---|
| Site: | Saxton File:GPU Nuclear icon.png |
| Issue date: | 04/29/1969 |
| From: | Cindy Montgomery SAXTON NUCLEAR EXPERIMENTAL CORP. |
| To: | Skovholt D NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20083L048 | List:
|
| References | |
| FOIA-91-17 NUDOCS 9110240192 | |
| Download: ML20085G222 (1) | |
Text
-
_ __a. oAn TON NUCLEAR EXPERIM g
)SNEC GCNERAL PU B LIC U TILITI E S sy g,
A.ssy can, at powin e L.ow, cow..=,
i New steste Ponte 6 Liewt Couramy Pawwt.tvania Ettetnic Cowaame F. O. Bcx 542, Reading, Po.
pivnomoutaw Coiso% cewmany
/[
19603 P. O. Box 99, Snxion, Pa.
16578
., rp Telephonei Area
}
Area 49(
\\/<g*..'
r C90 i^
e r.fw/
Ob April 29, 1969 s '
i C9(
. O t. i License DPR-4 pocket No. 50.
c'9 C 6C O. 9 ( m
/;
Mr. Donald J. skovholt N
il.'
Division of Reactor LicensingAssistant Ditecto 2(
ons U.S. Atomic Energy Commission
~
Washington, D.C.
20545 9
Dear Mr. Skovholt:
5 s
interim authorityThree signed copies and 40 conformed for low power operation of the Saxtocopies of a enclosed.
i n ter.ctor are operation of the Saxton reactor with CP2nding re No.
equest for full power loading the core components authoriz d b5 e fuel.
y this amendmant.We have now urgent need for the use of the Saxton e
commitments we a Because of interim measure. re requesting low power operation a seconi of Change Report Nas.Also enclosed are three signed ccpie 17, 18, 19 fuel and non-fuel bearing rods in C s at.d 40 conformed copies
, 20. 21, 22 and 23 releting to remov ore III fuel assemblies and sub C
Very truly yours, c-i.d' s
(
,/ ' lL Q~
(
(/
C. R. Montgomery /
g cc:
L G. F. Trowbridge, Esquire Genarcl llanager i.3 24 s.-
c,t[0240192 910424
/'}
1 DEMOK91-17 PDR yd POR FOIA t
I/
_