Confirms 630221 Meeting to Discuss Operating Experience Rept Per Paragraph 3D(4) of License DPR-4
ML20085D171
Person / Time
Site: Saxton File:GPU Nuclear icon.png
Issue date: 03/08/1963
From: Rees D
SAXTON NUCLEAR EXPERIMENTAL CORP.
To: Lowenstein R
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20083L048 List: ... further results
References
FOIA-91-17 NUDOCS 9110150319
Download: ML20085D171 (2)


Text

- - - _ - - - . - _ - - - - . - - _ - - - . . -

A 4 w SAXf0N NUCLEAR EXPEPJMENTAL CORPORATK)N I m GENERAL P U B LIC UTILITIES SYSTEM p s,ec m .. c ...u .. . v..,e ..

.. m ... .... u..,c......

.. .. m.... sac,... c......

pe JC .. % .... s... e......

- I P.O. tem $42. Reedias, Po. Tenghone. Res&g WAher 9.H01 March 8, 196)

Doeket 50-146 Lisease LFR4 0," M Cem%

Mr. Robert Lowenstein, Director Division of Lioensing and taplatiec jg n i-ac3--,- 4,' 'f]if~

U.S. Atomic hargy w= ion Wahingtem f5, D.C.

]W{yll- --

--[-77.p . .I SL

Dear Kr. lovensteins -- J II __l_,

[Qo '

This letter will confirm a meeting held in ths ABC hee 6 quarters at Oemaatoon os Thereday, February 21, he'We~en Masare. D. R. Maller, M. C. Gaske, and R. W. Petrie and Dr. S. Bartmoff of W Westinghouse Atcads Power Divisiou and streel.f for the purpose et disoassing an operating supericase repart to be filed in accordance w$th paragraph 3D(b) of the Sexton Provisional Operating License No. DMt4. It was reported to Mr. Haller and his associates at his meeting ht boeause of failure of mome of the in-oore instrtussatatise Omnmo-l coagdes and flow treammitters that it would not be possible to report as l accurate (ag hot chaemel factor at this time. It was further reported at his j meetiag that the in-core thermococples and W flaw transmitters had been ripaired or were in W process of bedag repaired during the currect sold shot-l deus, whiah is for 2e purpose of inserting new test subas#Has and omrrying out planned modi.fications and amintenname work, and ht fur %er test data at

%e Osll poser lweel of PC Wt was plammed for the purpose of obtM= data from idukah an aneurate F45 het ahannel fanter could be eeuyuted.

I advised Mr. Maller ht we were mmrtans to film this report is ocuplianee uita the requirement ta the provistenal operating liceses. We nyeed though that there did not appear to be any urgomsy for filing tAis operating experiamos report and ht it would be prefarable to wait until fether posse ::peration end test data had been obt.aiaad so tha^, it woule. he poe61ble to present a more oemplete and accurate report. Mr. Huller requested ht, in addition to the storial that we proported to inclu6e in the report, we include scene main ocelant radioebanistry data and calculated burnout factors.

The carrent oold shatdova of W Saxtra reactor has been delayed due to sans mimw moshanical problaas that wes a encountered '<1th %e test subassesMies and due to a higher than deairt.ble conosmtration of suspended material is the asia coolast. A ww fi.lter, whic.h sill be reported under the change report posedare, hu besa installed and the main ooolant vJ.ll be circulated through this filter for several- days as required in order to clean up the system.

olio 150314 010424 PDR FOIA {pm 5 gth DEMOK91 -17 PDR ,

[

1'- lli.

.m m 9 7 1963 _._ ___

WW _ _ . _ _ .

Nr. Robert lowenstain March 8, 1963 trdstag and licensiag of SE!EI operasere and s&iitional low power teeting wiD twbr dalay the resumption of power operation, which is not sapected

% ecaer estil W week of .treh 18. Based on this schedule it should be

nsible W tile the operating expe-iaace report su==tias ditring the month et Aprn 1963.

Simoorely, o -

taRtD6 h eral manapr cci Messrs s.Dartnott o.r.trewtr14,.