MONTHYEARML20134P3811996-11-25025 November 1996 Application for Amend to License DPR-4,submitting Decommissioning TSs ML20112A6771996-05-17017 May 1996 Application for Amend to License DPR-4,consisting of TS Change Request 58,revising Decommissioning TS ML20100F4851996-02-0202 February 1996 Application for Amend to License DPR-4,proposing Expansion of Permitted Principal Activities within the Exclusion Area Beyond Those Allowed by Current TS ML20094Q0551995-11-21021 November 1995 Application for Amend to License DPR-4,transferring All mgt- Related Responsibilities for Plant from SNEC to Gpun.Revised TS Encl ML20086A5681995-06-23023 June 1995 Addendum to TS Change Request 56 to License DPR-4,revising TS Pages 1,2 & 3 to Change Organization Performing Remainder of Characterization Activities & Future Decommissioning Activities to Assure Linkage W/Licensee Maintained ML20084J3061995-06-0202 June 1995 Application for Amend to License DPR-4,proposing Changes to App a of TSs ML20078A2171995-01-12012 January 1995 Rev to TS Change Reqest 55 to License DPR-4,including Addl Text Resulting from Matl Provided in Response to Questions in NRC 950103 RAI ML20072C2341994-08-0808 August 1994 Application for Amend to License DPR-4,revising Content & Format of Existing TS & Analysis Applying Stds of 10CFR50.92 in Making Significant Hazards Considerations Determination ML20045G7011993-06-23023 June 1993 TS Change Request 54 to License DPR-4,including Facility Characterization as Activity Permissible in TS ML20094P0301992-04-0202 April 1992 TS Change Request 53,Rev 3 to License DPR-4,removing Reactor Support Bldgs & Structures from TSs ML20235H0391987-09-22022 September 1987 Application for Amend to License DPR-4,consisting of Tech Spec Change 53 Re Removing Outbuildings & Structures ML20085H6591969-12-0202 December 1969 Amend 2 to Change Repts 15 & 16 to License DPR-4,describing Installation of Water Seal on Pressurizer Safety Valves & Spilled Coolant Recirculation Sys ML20085H6371969-11-24024 November 1969 Amend 9 to Change Request 32 to License DPR-4,clarifying Info Re Engineering Hot Channel Factors ML20085H6061969-11-20020 November 1969 Amend 8 to Change Request 32 to License DPR-4,revising Emergency Preparedness Plan.Plan Encl ML20085H5951969-10-27027 October 1969 Amend 7 to Change Request 32 to License DPR-4 Re LOCA Prevention & Protection ML20085H4981969-10-0303 October 1969 Amend 6 to Change Request 32 to License DPR-4,revising Limiting Condition for Operations Re Concentration of Radioactivity in Refueling Water Storage Tank ML20085H4681969-07-0808 July 1969 Amend 1 to Change Rept 16 to License DPR-4,describing Mods to Safety Injection Sys & Installation of Automatic Long Term Coolant Recirculation Sys ML20085H3751969-07-0808 July 1969 Amend 1 to Change Request 15 to License DPR-4,describing Changes to Pressurizer Safety Relief Valves Installation ML20085G2311969-04-29029 April 1969 Application for Interim Amend to License DPR-4 & Change Request 33,authorizing Low Power Operation ML20085G1111969-04-0101 April 1969 Amend 2 to Change Request 32 to License DPR-4,requesting Interim Authority to Load Core III Fuel ML20085G2081969-04-0101 April 1969 Amend 3 to Change Request 32 to License DPR-4,submitting Rept Entitled, Summary Rept on Buckling of Saxton Core II Fuel Assemblies & Prevention of Buckling in Core III ML20085G0911969-03-19019 March 1969 Application for Amend to License DPR-4,requesting Interim Authority to Load Core III Fuel ML20085G0711969-03-12012 March 1969 Amend 1 to Change Request 32 to License DPR-4,reevaluating Core III LOCA ML20085G0471969-01-0707 January 1969 Application for Amend to License DPR-4,extending Expiration Date to 721231 ML20085F9891968-11-13013 November 1968 Change Rept 15 to License DPR-4,describing Mods to Pressurizer Safety Relief Valve Installation ML20091D1381968-08-30030 August 1968 Addendum to Change Request 32 to License DPR-4,submitting WCAP-7219 Rept Re Addendum to License Application ML20085F6241968-04-19019 April 1968 Amend 1 to Change Request 31 to License DPR-4 Re Fuel Bearing Rods ML20085F6011968-03-0404 March 1968 Change Request 31 to License DPR-4 Re Test Fuel Assemblies ML20085F5671968-02-0202 February 1968 Change Request 30 to License DPR-4 Re Test Fuel Assemblies ML20085F5571967-11-21021 November 1967 Amend 3 to Change Request 25 to License DPR-4 Re Testing of Safety Valves ML20085F5341967-10-10010 October 1967 Amend 2 to Change Request 25 to License DPR-4 Re Permissive Switch,Variable Frequency Motor Generator Set Mods & Safety Injection Sys Flow Totalizer ML20085F5271967-10-10010 October 1967 Change Rept 14 to License DPR-4,revising Supercritical Technology Program ML20085F5191967-09-20020 September 1967 Change Request 13 to License DPR-4 Re New Rod Oscillator ML20085F5121967-09-0606 September 1967 Amend 1 to Change Request 27 to License DPR-4 Re Ph Range During Testing ML20085F5011967-08-31031 August 1967 Change Request 29 to License DPR-4 Re Test Fuel Subassemblies ML20085F4871967-08-28028 August 1967 Change Request 28 to License DPR-4 Re Test Fuel Subassemblies ML20085F4611967-08-0303 August 1967 Change Request 27 to License DPR-4 Re Test Fuel Subassemblies ML20085F4181967-06-27027 June 1967 Amend 1 to Change Request 25 to License DPR-4 Re Upper Limit Accident Results Calculations ML20085F2781967-04-24024 April 1967 Change Request 26 to License DPR-4,lowering Settings of PSV-1 & PSV-2 to Max Value of 3,980 Psig ML20085F1741966-07-28028 July 1966 Change Request 24 to License DPR-4 Re Two Test Fuel Subassemblies ML20085F1411966-06-22022 June 1966 Change Request 23 to License DPR-4 Re Test Fuel Subassemblies ML20085E9341966-02-24024 February 1966 Change Request 22 to License DPR-4 Re Two Test Fuel Subassemblies for Testing ML20085E8711965-08-0202 August 1965 Change Request 21 to License DPR-4,changing Control Rods ML20085E6861965-05-0707 May 1965 Change Request 18 to License DPR-4 Re Fuel & Cladding Development ML20085E6941965-05-0707 May 1965 Change Request 20 to License DPR-4 Re Composition of Fuel Assemblies ML20085E6691965-04-0202 April 1965 Change Request 17 to Tech Specs & Amend 16 to License DPR-4, Authorizing Receipt,Possession & Use of Plutonium Fueled Subassemblies ML20085E6651965-04-0202 April 1965 Change Request 19 to Tech Specs & Amend 17 to License DPR-4, Authorizing Receipt,Possession & Use of Plutonium as Fuel in Partial Loading of Reactor ML20085D9231965-03-0505 March 1965 Rev 1 to Change Request 16 to Application for Amend to License DPR-4,revising Safeguards Rept ML20085D8661964-11-10010 November 1964 Change Rept 12 to Application for Amend to License DPR-4, Replacing Experimental Fuel Subassembly W/Subassembly Containing Nine Std Fuel Rods ML20085D7561964-10-0808 October 1964 Change Request 16 to Application for Amend to License DPR-4, Revising Supercritical Technology Program.Safeguards Rept Encl 1996-05-17
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217A9761998-04-20020 April 1998 Amend 15 to License DPR-4,allows Decommissioning of Saxton Nuclear Experimental Corp Facility ML20134P3811996-11-25025 November 1996 Application for Amend to License DPR-4,submitting Decommissioning TSs ML20112A6771996-05-17017 May 1996 Application for Amend to License DPR-4,consisting of TS Change Request 58,revising Decommissioning TS ML20100F4851996-02-0202 February 1996 Application for Amend to License DPR-4,proposing Expansion of Permitted Principal Activities within the Exclusion Area Beyond Those Allowed by Current TS ML20094Q0551995-11-21021 November 1995 Application for Amend to License DPR-4,transferring All mgt- Related Responsibilities for Plant from SNEC to Gpun.Revised TS Encl ML20086A5681995-06-23023 June 1995 Addendum to TS Change Request 56 to License DPR-4,revising TS Pages 1,2 & 3 to Change Organization Performing Remainder of Characterization Activities & Future Decommissioning Activities to Assure Linkage W/Licensee Maintained ML20084J3061995-06-0202 June 1995 Application for Amend to License DPR-4,proposing Changes to App a of TSs ML20078A2171995-01-12012 January 1995 Rev to TS Change Reqest 55 to License DPR-4,including Addl Text Resulting from Matl Provided in Response to Questions in NRC 950103 RAI ML20072C2341994-08-0808 August 1994 Application for Amend to License DPR-4,revising Content & Format of Existing TS & Analysis Applying Stds of 10CFR50.92 in Making Significant Hazards Considerations Determination ML20045G7011993-06-23023 June 1993 TS Change Request 54 to License DPR-4,including Facility Characterization as Activity Permissible in TS ML20094P0301992-04-0202 April 1992 TS Change Request 53,Rev 3 to License DPR-4,removing Reactor Support Bldgs & Structures from TSs ML20235H0391987-09-22022 September 1987 Application for Amend to License DPR-4,consisting of Tech Spec Change 53 Re Removing Outbuildings & Structures ML20085H6591969-12-0202 December 1969 Amend 2 to Change Repts 15 & 16 to License DPR-4,describing Installation of Water Seal on Pressurizer Safety Valves & Spilled Coolant Recirculation Sys ML20085H6371969-11-24024 November 1969 Amend 9 to Change Request 32 to License DPR-4,clarifying Info Re Engineering Hot Channel Factors ML20085H6061969-11-20020 November 1969 Amend 8 to Change Request 32 to License DPR-4,revising Emergency Preparedness Plan.Plan Encl ML20085H5951969-10-27027 October 1969 Amend 7 to Change Request 32 to License DPR-4 Re LOCA Prevention & Protection ML20085H4981969-10-0303 October 1969 Amend 6 to Change Request 32 to License DPR-4,revising Limiting Condition for Operations Re Concentration of Radioactivity in Refueling Water Storage Tank ML20085H4681969-07-0808 July 1969 Amend 1 to Change Rept 16 to License DPR-4,describing Mods to Safety Injection Sys & Installation of Automatic Long Term Coolant Recirculation Sys ML20085H3751969-07-0808 July 1969 Amend 1 to Change Request 15 to License DPR-4,describing Changes to Pressurizer Safety Relief Valves Installation ML20085G2311969-04-29029 April 1969 Application for Interim Amend to License DPR-4 & Change Request 33,authorizing Low Power Operation ML20085G2081969-04-0101 April 1969 Amend 3 to Change Request 32 to License DPR-4,submitting Rept Entitled, Summary Rept on Buckling of Saxton Core II Fuel Assemblies & Prevention of Buckling in Core III ML20085G1111969-04-0101 April 1969 Amend 2 to Change Request 32 to License DPR-4,requesting Interim Authority to Load Core III Fuel ML20085G0911969-03-19019 March 1969 Application for Amend to License DPR-4,requesting Interim Authority to Load Core III Fuel ML20085G0711969-03-12012 March 1969 Amend 1 to Change Request 32 to License DPR-4,reevaluating Core III LOCA ML20085G0471969-01-0707 January 1969 Application for Amend to License DPR-4,extending Expiration Date to 721231 ML20085F9891968-11-13013 November 1968 Change Rept 15 to License DPR-4,describing Mods to Pressurizer Safety Relief Valve Installation ML20091D1381968-08-30030 August 1968 Addendum to Change Request 32 to License DPR-4,submitting WCAP-7219 Rept Re Addendum to License Application ML20085F6241968-04-19019 April 1968 Amend 1 to Change Request 31 to License DPR-4 Re Fuel Bearing Rods ML20085F6011968-03-0404 March 1968 Change Request 31 to License DPR-4 Re Test Fuel Assemblies ML20085F5671968-02-0202 February 1968 Change Request 30 to License DPR-4 Re Test Fuel Assemblies ML20085F5571967-11-21021 November 1967 Amend 3 to Change Request 25 to License DPR-4 Re Testing of Safety Valves ML20085F5341967-10-10010 October 1967 Amend 2 to Change Request 25 to License DPR-4 Re Permissive Switch,Variable Frequency Motor Generator Set Mods & Safety Injection Sys Flow Totalizer ML20085F5271967-10-10010 October 1967 Change Rept 14 to License DPR-4,revising Supercritical Technology Program ML20085F5191967-09-20020 September 1967 Change Request 13 to License DPR-4 Re New Rod Oscillator ML20085F5121967-09-0606 September 1967 Amend 1 to Change Request 27 to License DPR-4 Re Ph Range During Testing ML20085F5011967-08-31031 August 1967 Change Request 29 to License DPR-4 Re Test Fuel Subassemblies ML20085F4871967-08-28028 August 1967 Change Request 28 to License DPR-4 Re Test Fuel Subassemblies ML20085F4611967-08-0303 August 1967 Change Request 27 to License DPR-4 Re Test Fuel Subassemblies ML20085F4181967-06-27027 June 1967 Amend 1 to Change Request 25 to License DPR-4 Re Upper Limit Accident Results Calculations ML20085F2781967-04-24024 April 1967 Change Request 26 to License DPR-4,lowering Settings of PSV-1 & PSV-2 to Max Value of 3,980 Psig ML20085F1741966-07-28028 July 1966 Change Request 24 to License DPR-4 Re Two Test Fuel Subassemblies ML20085F1411966-06-22022 June 1966 Change Request 23 to License DPR-4 Re Test Fuel Subassemblies ML20085E9341966-02-24024 February 1966 Change Request 22 to License DPR-4 Re Two Test Fuel Subassemblies for Testing ML20085E8711965-08-0202 August 1965 Change Request 21 to License DPR-4,changing Control Rods ML20085E6941965-05-0707 May 1965 Change Request 20 to License DPR-4 Re Composition of Fuel Assemblies ML20085E6861965-05-0707 May 1965 Change Request 18 to License DPR-4 Re Fuel & Cladding Development ML20085E6691965-04-0202 April 1965 Change Request 17 to Tech Specs & Amend 16 to License DPR-4, Authorizing Receipt,Possession & Use of Plutonium Fueled Subassemblies ML20085E6651965-04-0202 April 1965 Change Request 19 to Tech Specs & Amend 17 to License DPR-4, Authorizing Receipt,Possession & Use of Plutonium as Fuel in Partial Loading of Reactor ML20085D9231965-03-0505 March 1965 Rev 1 to Change Request 16 to Application for Amend to License DPR-4,revising Safeguards Rept ML20085D8661964-11-10010 November 1964 Change Rept 12 to Application for Amend to License DPR-4, Replacing Experimental Fuel Subassembly W/Subassembly Containing Nine Std Fuel Rods 1998-04-20
[Table view] |
Text
_
l SAXTON NUCLEAR EXPatIMENTAL CORP 0}tATION
' DOCKET No. 50-lh6 CHANGE REQUESTS #5 and #6
- 1. Applicant hereby subnits change requests #5 and #6 in compliance with paragraph 3 of License DPR-h.
9 ie g <
\ \
SAXTON N'JCLEAR EXPEitlKENTAL CORPOIMTION 9 FEBB N"S t
ay /s/ R. E. Neidig ITesident k u.MomitlED M# 7 y s m .- a Attests b m d (S E A L)
/s/ R. E. Sypher Secretary Sworn and subscribed to before me this 'Ith day of February 1963.
(S A L) /s/ Martin A. Kohr Notary Public Huhlenberd Townsaip, Berks County My Cornission Expires Feb. h,19,5 931o15o309 910C4 PDR FOIA PDh.
DEKOg91-17 1C24 f
4 February 7. 1963 Docket No. 30-lh6 DPR-b Technical Specifications Change Request #5
- 1. , Description of Change Change paragraph (7) on page 13 of the Saxton Technical Specifica-t2cns under item 18," Administrative and Procedural Safeguards," to read as follows:
"Before any major circuit breaker or critical valve can be operated for maintenance or any najor piece of equipment, control, or instrumentation can be taken out of service fcr maintenance, a written order must be issued and signed by or on authority of the Reactor Plant Superviser on duty."
?. Purpose of Change As paragraph 18(7) of the Technical Specifications r.ow reads, it :
would be necessary for the Reactor Plant Supervisor on duty to issue a written order for the operation of many of the electrical breakers and system valves during nornal operation. It was the intent of this paragraph that only written orders would be issued for breakers and valves operated to take equipment or syster.s ut of service for maintenance. Therefore the words "for maintenance" have been added to this paragraph for clarification.
- 3. Safety Considerations In our opinion this proposed-change does not present hazards con-siderations.
- h. Health and Safety It is our conclusion that the health and safety of the public will not be endangered by this change.
5 Schedule Approval is requested as soon as possible.
f
_______.m___ . _ _ _ _ _ . . - -___
February 7, 196)
Docket No. 50-lh6 DPR-b Technical Specifications Chance hequest #6
- 1. Description of Chango Change iten 12 on page 11 of the Saxton Technical Specifications as anended on October 9,1962 to read as follows:
"A charging systen consisting of two motor-driven horisontal, triplex, reciprocating pumps, each having an adjustable capacity of 3 to 15 cpm at a total dynamic head of 2500 psig, is provided t; charge degasified, 4 demineralized make-up water, concentrated borated water, and water from the purification system back into the main coolant system. These pumps will be in operational condition during power optration of the reactor, except that one pump may be rendered inoperative for the purpose of per-forming ninor maintenance, such as replacing packing. One or both of '
these pumps will operate intermittently as required for the purification systen, and for volume control of the main coolant systen."
- 2. Purpose of this Change This change is being renuested in order to make it porsible to main-tain these nunps during experiments requiring extended periods of power operation.
Based on operating experience to date, it has been observed that the leakage .
through the high pressure packing glands of the reciprocating piston shaft extensions on these pumps becomes. excessive after short periods of operation and will require. frequent replacement of the packing. As item 12 of the l
Technical Specifications presently reads, it will be necessary to shut the reactor down in order to perform any minor maintenance such as replacement of the shaft packing. This restriction will make it difficult, if not impossible, to obtain extended power operation runs of four ta six weeks as required for come of the experiments planned for the five-year research and development program. .
l
- 3. Safety Considerations The only potential safety consideration resulting from this proposed #
I change would be that if a failure of the one operable charging pump occurred l
during a tine when the other charging pump was out of service for maintenance, .
j it might be _necessary to inject borated water into the main coolant system as.
l a result of a failure of the main coolant pump and a resulting decrease in the i
main coolant temperature.
The probability of two failures of this type occurring at the same time seems remote and in the event thic'did occur it still would be possible to inject borated water directly into the reactor vessel by means of the safety injection system pumps. If the one charging pump is operable at the time of a nain coolant punp failure or a main system cool-down, a charging rate of 15 gpm of borated water is sufficient to maintain the reactor subcritical. 3 In our opinion the proposed _ change does not present significant hazards considerations not described or implicit in the Final Safeguards Report.
t February 7, 1963 l
Docket No. 50-lL6 f PR-h Technical Specifications Change hequest #6 Page 2 of 2
- h. Health and Safety It is our conclusion that the health and safety of the public will not be endangered by this change.
5 Schedule Approval of this change is requested by March 1,1963
..