Forwards Rev 41 to Security Plan,Revising Chapter 3 to Reflect Update of Station Organizational Structure & App B, Establishing Age Requirement for Unarmed Security at 18 Years of Age.Encl Withheld (Ref 10CFR73.21)
ML20077M380
Person / Time
Site: Byron  Constellation icon.png
Issue date: 12/28/1994
From: Johnson I
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TAC-M65282, TAC-M65283, NUDOCS 9501120346
Download: ML20077M380 (2)


Text

.- - -.

CommonwIcith Edison

[

_m

- 125 south Clark Street. Chcaco. Hhncea

\\

f Address Reply to Post OHee Box 767

~

V Chicago. Ilhnois CO690-0767 i

December 28,1994 CERTIFIED Mall U.S. Nuclear Regulatory Commission t

ATTN: Document Control Desk 1

Washington, DC 20555

Subject:

Bvron Nuclear Power Stations Units 1 and 2 Byron Station Security Plan 4

1 NRC Docket Nos. 50-454 & 50-455 1

TAC Nos. 65282/65283 j

Enclosed are the original and three (3) copies of Revision 41 of the Byron Nuclear Power Station Security Plan. This revision ident. 3s the generic security changes being implemented at Comed's six (6) nuclear generating stat, ions. The changes allow for the implementation of our watchmen program and have been approved as 50.54(p) changes in previous submittals.

in addition, the following changes are being submitted:

1 4

Chapter 3 -

The current station organizational structure as it applies to the security department has been updated.

Appendix B -

The age requirement for unarmed i

security is being established at 18 i

years of age.

1 The requirement for a polygraph i

examination is being repositioned to include only our armed personnel.

j The model of shotgun is being j

expanded to include the 1187 model.

i The ability to use simulated j~

equipment, i.e., handgun and radio, when performing the agility test.

1 1

Prerequisites of Job Analysis 8.0; l

Security Control Center, has been i

expanded to include successful completion of Job Analysis 1.0 i

through 7.0.

THE ENCLOSURE CONTAINS SAFEGUARDS INFORMATION Uoon separation, this oaoe is decontrolled

-) l o

3(,

L s v 4

D i

U.S. Nuclear Regulatory Commission Page Two Pursuant to 10CFR 50.54(p), the signed original and three copies of the l

Security Plan revisions are being provided to your office. A copy of this letter and two copies of the Security Plan revisions are being sent to Region Ill.

We have concluded that these changes to not decrease the safeguards effectiveness of the plan. These enclosures contain Safeguards Information which i

must be protected from public disclosure pursuant to 10CFR 73.21.

Sincerely, n,L 2 / 5 A. irene M. Johnson i

('

Licensing Operations Manager i

Enclosures cc:

J. B. Martin (w/two encts.)

i THE ENCLOSURE CONTAINS SAFEGUARDS INFORMATION Uoon seosration. this oaoe is decontrolled

{