ISI Exam Rept of Seabrook Station for Refueling Outage 3, Period 1,Interval 1
ML20076H355
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 10/04/1994
From: Whitney K
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
To:
Shared Package
ML20076H354 List:
References
NUDOCS 9410210172
Download: ML20076H355 (25)


Text

_ - . _ _ . - . - - . - -. ._ _ - _ - . .

INSERVICE INSPECTION EXAMINATION REPORT of 4

SEAllROOK STATION for NORTII ATLANTIC ENERGY SERVICE CORPORATION P.O. Ilox 300 Scabrook, NII 03874 Commercial Service Date: August 19,1990 Refueling Outage: 3 Period: 1 Intenal: 1 1

Prepared By: b'A / ) F- Date /O!'//7#/

ISI Coordinator 8  !

Approved By: <

((/2[aweI Lead Engineer - ISI Date /d/'///</

I l

9410210172 c141018 PDR ADOCK 05000443 i D PDR

TABLE OF CONTENTS P2gs INTRODUCTION 1 .

DETAILED

SUMMARY

1.0 Nondestructive Examination Procedures 2 2.0 Summary Report 3 APPENDIX A Form NIS-1 Owner's Report for Inservice Inspections 13 APPENDIX B Repair / Replacement Summary Index 18 l

i

1 INTRODUCTION Inservice Inspection Examinations of ASME Class 1,2, and 3 piping welds and components were conducted at Seabrook Station in accordance with ASME Section XI,1983 Edition through Summer 1983 Addenda and the ISI Program Plan. This report summarizes ISI examinations completed during the third refueling outage encompassing the period from April 9,1994 through July 25,1994. ISI Period 1 is complete with approximately 34% of the Interval 1 examinations completed.

Iof23

DETAILED ISI

SUMMARY

1.0 NONDESTRUCTIVE EXAMINATION PROCEDURES The following procedures were used during refueling outage #3 inservice inspection.

Four procedures utilized (VT Vessel Visual, PT, & MT) were North Atlantic Energy Service Corporation (NAESCO) procedures. The remaining procedures used were Yankee Atomic Electric Company (YAEC) procedures approved for use by NAESCO Station Operation Review Committee (SORC). YAEC serves as the certifying agent in NDE for NAESCO.

ES1807.001 Visual Examination Procedure ESI807.002 Liquid Penetrant Examination - Solvent Removable ES1807.003 Magnetic Particle Examination . 1 ES1807.007 Reactor Vessel Interior Visual Inspection Procedure YA-UT-1 S Ultrasonic Testing - General Requirements YA-UT-2S Ultrasonic Testing of Welds YA-UT-5S Ultrasonic Testing of Materials YA-UT-112S Ultrasonic Thickness Measurement l

The following techniques were used for the subject examinations:

]

l YA-UT-2S l

S2-94-01 Rev. O S2-94-02 Rev. 0 YA-UT-5S S5-94-11 Rev. O SS-94-14 Rev. O S5-94-12 Rev. 0 S5-94-15 Rev. 0 l SS-94-13 Rev. O SS-94-16 Rev. O I l

2 of 23

2.0

SUMMARY

REPOI{I The following is a summary of all examinations performed, conditions noted, and corrective measures taken during the third refueling inservice inspection.

Code Category B-A Pressure Retaining Welds in Reactor Vessel The following examinations were performed on the reactor vessel head. Two thirds of these welds were examined from the centerline of stud hole #50 clockwise to the centerline of stud hole #33. This completes the examination on these two welds as one third was conducted during the first refueling outage.

RC RPV 103-101 UT examination was perfonned on this upper head circumferential weld with no recordable indications. Scan limitations and geometric reflectors from CRD penetrations were verified by previous outage and preservice data.

RC RPV 101-101 UT and MT examinations were performed on this head-to-flange weld with no recordable indications. UT scan limitations and geometric reflectors from CIU) penetrations were verified by previous outage and preservice data. Magnetic particle examination was performed with no unacceptable indications.

Code Cateeorv B-F Pressure Retaining Dissimilar Metal Welds RC E-10 A-SE Ultrasonic examination revealed an indication at varying amplitudes for 360* around the safe end. Evaluation determined that the indication was caused by beam redirection due to columnar grain structure of the weld metal. Full ASME Code coverage was not achievable. Calculated coverage for this weld was 63%. Relief will be pursued. Liquid penetrant examination was conducted during the first refueling outage with no unacceptable indications.

RC E-10 B-SE Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications. Full ASME Code UT coverage was not achievable. Calculated coverage for this weld was 56%. Relief will be pursued.

RC E-10 C-SE Ultrasonic examination revealed an indication at varying amplitudes fbr 360' around the safe end. Evaluation determined that the  ;

indication was caused by beam redirection due to columnar grain ,

structure of the weld metal. Full ASME Code coverage was not j achievable. Calculated coverage for this weld was 71%. Relief will l be pursued. Liquid penetrant examination was performed with no unacceptable indications.

3 of 23 l

\

)

2.0

SUMMARY

REPORT (continued)

Code Category B-F Pressure Retaining Dissimilar Metal Welds (continued)

RC E-10 D-SE Ultrasonic examination revealed an indica o at varying amplitudes for 360* around the safe end. Evaluation mined that the indication was caused by beam redirectie- to colunmar grain

, structure of the weld metal. Full ASME le coverage was not achievable. Calculated coverage for this seld was 64%. Relief will be pursued. Liquid penetrant examination was performed with no unacceptable indications.

RC E-10 S-SE Ultrasonic and liquid penetrant examinations were perfomled with no unacceptable indications. Full ASME Code UT coverage was achieved on this weld.

RC E-10 SP-SE Ultrasonic examination recorded two indications at varying amplitudes for 360* around the safe end. Indication #1 was a geometric reDector from the ID which was seen with the 27' shear wave component of the 60* refracted L-wave. Indication #2 was also a geometric reflector from the ID which was seen with the 22* shear wave component of the 45' refracted L-wave. Both were verified with an ID profile and beam plot. Full ASME Code coverage was not achievable. Calculate covetage for this weld was 61%. Relief will be pursued. Liquid penetrant examination was conducted during the first refueling outage with no unacceptable indications. i Code Category B-G-1 Pressure Retaining Bolting. Greater Than 2 in. In Diameter RC RPV STUD UT and MT (no unacceptable indications) l No.'s 01,02,03,04, 05,06,33,34,35,36, 37,38,39,40,41,52, 53, & 54 RC RPV NUT UT and MT (no unacceptable indications)

No.'s 01,02,03,04, 05,06,33,34,35,36, 37,38,39,40,41,52, 53, & 54 4 of 23

\

l l

2.0

SUMMARY

REPORT (continued)

Code Category B-G-1 Pressure Retaining Bolting. Greater Than 2 in. In Diameter (continued)

RC RPV WASilER VT-1 (no unacceptable indications)

No.'s 01,02,03,04, 05,06,33,34,35,36, 37.38,39,40,41,52, 53, & 54 RC RC-P-1 A S-11516 UT (no unacceptable indications)

RC RC-P-1 A S-11521 UT (no unacceptable indications)

RC RC-P-1 A S-11529 UT (no unacceptable indications)

RC RC-P-1 A S-11535 UT (no unacceptable indications)

RC RC-P-1 A S-11706 UT (no unacceptable indications)

RC RC-P-1 A S-11709 UT (no unacceptable indications)

RC RC-P-1 A S-11710 UT (no unacceptable indications)

RC RC-P-1 A S-11712 UT (no unacceptable indications)

RC RC-P-1 A S-11722 UT (no unacceptable indications)

RC RC-P-1 A S-1 l' N UT (no unacceptable indications)

RC RC-P-1 A S-11726 UT (no unacceptable indications)

RC RC-P-1 A S-11727 UT (no unacceptable indications)

RC RC-P-1 A S-11728 UT (no unacceptable indications)

RC RC-P-1 A S-11730 UT (no unacceptable indications)

RC RC-P-1 A S-11731 UT (no unacceptable indications)

RC RC-P-1 A S-11733 UT (no unacceptable indications)

RC RC-P-1 A S-11734 UT (no unacceptable indications)

RC RC-P-1 A S-11736 UT (no unacceptable indications)

RC RC-P-1 A S-11738 UT (no unacceptable indications)

RC RC-P-1 A S-1l'/43 UT (no unacceptable indications)

RC RC-P-1 A S-12385 UT (no unacceptable indications)

RC RC-P-1 A S-12386 UT (no unacceptable indications)

RC RC-P-1 A S-12411 UT (no unacceptable indications)

RC RC-P-1 A S-12427 UT (no unacceptable indications)

RC RC-P-1B FLANGE VT-1 (no unacceptable conditions noted)

Code Category B-L-2 Pumn Casings RC RC-P-1B IS VT-3 (no unacceptable conditions noted) 5 of 23

2.0

SUMMARY

REPORT (continued) l Code Category B-N-1 Interior of Reactor Vessel A remote visual examination was conducted using a mini-rover submarine. No unacceptable conditions were noted. ,

1 Code Category B-P All Pressure Retaining Comnongats A final system leakage test was conducted on the Reactor Coolant System prior to plant startup from refueling. Visual examination noted no unacceptable conditions.

I ISI Sunnorts (NF) )

i The following supports received a VT-3 / VT-4 visual examination. Problem sheet number refers to supports that failed visually (i.e. clearances, gaps, etc.). Evaluations were performed and the supports were determined to be operable, and did not fall within IWF-3410A.

Support No. System Class Status Problem Sh. No.

1-0013-SG-002 RC 1 Accept 1-0013-SG-005 RC 1 Accept 1-0049-RG-005 A RC 1 Accept 1-0049-RG-005B RC 1 Accept 1-0049-SG-001 RC 1 Accept 1-0058-SG-002 RC 1 Accept 1-0058-SG-004 RC 1 Eval / Accept 08 1-0058-SG-005 RC 1 Accept 1-0058-SG-008 RC 1 Accept 1-0094-SV-001 RC 1 Accept 1-0097-SG-003 RC 1 Accept 1-0097-SG-006 RC 1 Accept 1-0098-SV-001 RC 1 Accept 1 -0159-RG-003 RIl 2 Accept 1-0159-SG-002 Ril 2 Accept 1-0159-SG-004 Ril 2 Accept 1-0159-SG-005 Ril 2 Accept 1-0163-SG-001 Ril 2 Accept 1-0163-SG-007 RIl 1 Accept 1-0179-RG-002 Ril 2 Accept 1-0179-RG-003 Ril 2 Accept i 1-0250-RG-013 SI 2 Accept 1-0250-RG-017 SI 2 Accept 1-0250-RG-018 SI 2 Accept l

6 of 23 i l

J

2.0

SUMMARY

REPORT (continued)

ISI Supports (NF)(continued)

Support No. System Class Status Problem Sh. No.

1-0250-SG-001 SI 2 Accept 1-0250-SG-008 SI 2 Accept 1-0250-SG-010 SI 2 Accept 1-0250-SG-011 SI 2 Accept 1-0250-SG-012 SI 2 ' Accept 1-0250-SG-014 SI 2 Accept 1-0256-RG-010 SI 2 Accept 1-0256-RG-015 SI 2 Accept 1-0256-RG-017 SI 2 Accept 1-0272-A-009 SI 1 Accept 1-0272-SG-010 SI 1 Accept 1-0272-SG-011 SI 1 Accept 1-0272-SG-012 SI 1 Eval / Accept 10 1-0272-SG-013 SI 2 Accept 1-0274-SG-007 SI 2 Eval / Accept 12 1-0274-SG-008 SI 1 Accept 1-0274-SG-010 SI 1 Accept 1-0274-SG-011 SI 1 Accept 1-0274-SG-012 SI 1 Eval / Accept 13 l-0327-SG-008 CS 2 Accept 1-0327-SG-009 CS 2 Accept 1-0327-SG-010 CS 2 Accept 1-0327-Sil-012 CS 2 Accept 1-0343-RG-002 CS 1 Accept 1-0343-RG-009 CS 1 Accept 1-0343-RG-014 CS 1 Eval / Accept 09 l-0343-RG-023 CS 1 Accept 1-0343-SG-001 CS 1 Reject / Accept 1-0343-SG-005 CS 1 Accept 1-0362-SV-002 CS 2 Accept 1-0362-SV-006 CS 2 Accept 1-0363-A-005 CS 2 Accept 1-0363-RG-002 CS 2 Accept 1-0363-RG-003 CS 2 Accept 1-0363-RG-007 CS 2 Accept 1-0363-RG-008 CS 2 Accept 1-0363-SG-006 CS 2 Accept 1-0363-SG-012 CS 2 Accept 1-0363-SG-013 CS 2 Accept 7 of 23

2.0

SUMMARY

REPORT (continued)

ISI Supports (NF) (continued)

Support No. System Class Status Problem Sh. No.

1-0363-SG-014 CS 2 Accept 1-0365-RG-004 CS 1 Accept 1-0365-RG-011 CS 1 Accept 1-0365-RG-013 CS 1 Accept 1-0365-RG-015 CS I Accept 1-0365-SG-002 CS 1 Accept 1-0365-SG-005 CS 1 Accept 1-0375-RG-008 CS 2 Accept 1-0375-RG-009 CS 2 Accept 1-0375-SV-010 CS 2 Accept 1-1207-RG-003 CBS 2 Accept 1-1207-RG-007A CBS 2 Accept 1-1207-RG-009 CBS 2 Accept 1-1207-SG-001 CBS 2 Accept 1-1207-SG-002 CBS 2 Accept 1-1207-SG-004 CBS 2 Accept 1-1207-SV-008 CBS 2 Accept 1-1216-RG-052 CBS 2 Eval / Accept 14 1-1216-RG-053 CBS 2 Accept 1-1216-RG-054 CBS 2 Accept 1-1216-SG-057 CBS 2 Accept 1-1216-SG-064 CBS 2 Eval / Accept 17 Sunnort Examination Problem Sheets i

Problem No. Component ID Disposition ,

08 1-0058-SG-004 Rejected due to unacceptable measured gap. l

. Accepted based on review of support j displacement calculation which indicates measured gap will not restrict themial pipe movement in the X direction yet will provide seismic restraint in the Y direction.

09 l-0343-RG-014 Rejected due to unacceptable measured gap.

Accepted based on review of support calculation which indicates adequate movement in the Y directions.

8 of 23 i

l 1

2.0

SUMMARY

REPORT (continued) l Sunnort Examination Problem Sheets (continued)

Problem No. Component ID Disposition l l

10 1-0272-SG-012 Rejected due to clearances exceeding drawing j tolerances. Accepted based on review of pipe '

movements given in the support calculation.

12 1-0274-SG-007 Rejected due to unacceptable measured gap.

Accepted based on review of support calculation which indicates adequate movement.

13 1-0274-SG-012 Rejected due to unacceptable measured gap.

Accepted based on review of support calculation which indicates adequate movement.

14 1-1216-RG-052 Rejected due to unacceptable measured gap.

Accepted based on review of support calculation which indicates adequate movement.

17 1-1216-SG-064 Rejected due to unacceptable measured gap.

Accepted based on review of support calculation which indicates adequate movement.

Class 2 and 3 ISI Pressure Tests Procedure No. Code Category Title EX1810.101 B-P Class 1 RCS ISI Functional Test EX1810.203 C-II, D-A RWST and SAT ISI Functional Test EX1810.204 C-Il Volume Control Tank and Piping ISI Functional Test l

l I

l 9 0f 23

2.0

SUMMARY

REPORT (continued)

Class 2 and 3 ISI Pressure Tests (continued)

Procedure No. Code Category Title EX1810.207 C-II RilR Train A ISI Functional Test 1

EX1810.208 C-II RIIR Train B ISI Functional Test l l

EX1810.209 C-II Spent Fuel Cleanup ISI Functional Test l

EX1810.214 C-II Instrument Air System Penetration Functional Test EX1810.215 C-II Vent Gas System Penetration Functional Test EX1810.216 C-Il Low IIcad injection Functional Test EX1810.217 C-Il Service Air System Penetration Functional Test EX1810.218 C-Il RMW System Penetration Functional Test EX1810.221 C-II FP System Penetration Functional Test EX1810.2N C-II CGC System Functional Test EX 1810.22. 7 C-II Main Steam Loops A & D System Functional Test EX1810.224 C-Il Main Steam Loops B & C System Functional Test EX1810.225 C-Il Steam Generator Blowdown Functional Test EX1810.226 C-II WLD - RC Dra'mTank Pump Penetration Functional Test

. EX1810.227 C-Il WLD System Sump Penetration Functional Test 10 of 23

2.0

SUMMARY

REPORT (continued)

Class 2 and 3 ISI Pressure Tests (continued)

Procedure No. Code Category Title EX1810.229 C-Il CS System Letdown Functional Test -

EX1810.301 D-A Service Water System Train A Functional Test EX1810.304 D-A,D-B,D-C,C-Il Primary Component Cooling Loop A Functional Test EX1810.305 D-A PCCW Thermal Barrier System Functional Test EX1810.306 D-A Charging System - Boric Acid Transfer Piping Functional Test EX1811.311 D-R Service Water Train A 10 Year ISI Ilydrostatic Test EX1811.319 D-B CC System Loop B Containment Enclosure 10 Year Ilydrostatic Test EX1811.320 C-II,D-A,D-B PCCW System Loop A 10 Year ISI Ilydrostatic Test EX1811.321 D-B CC System Loop A Containment Enclosure 10 Year Ilydrostatic Test EX1811.322 D-A,D-B DG Fuel Oil Train A Piping ISI 10 Year Pneumatic Test EX1811.323 D-A,D-B DG Fuel Oil Tank Fill Line ISI 10 Year Pneumatic Test l

1 EX1811.325 D-A,D-B DG Fuel Oil Train B Piping ISI 10 Year j Pneumatic Test i

EX1811.328 D-A,D-B DG System Train B Starting Air Piping 10 Year ISI Ilydrostatic Test 11 of 23

l l

2.0

SUMMARY

REPOl(( (continued) h Class 2 and 3 ISI Pressure Tests (continued) 1 Procedure No. Code Category Title EX1811.330 D-A,D-B DG System Train A Starting Air Piping 10 l Year ISI Ilydrostatic Test EX1811.335 D-A CS System - Boric Acid Transfer Pumps Piping 10 Year ISI Ilydrostatic Test EX1811.337 D-B CS System Boric Acid Tanks and Attached Piping 10 Year ISI llydrostatic Test [

The above tests successfully underwent a VT-2 visual examination. With the exception of minor packing and flange leaks at test pressure, the inspections were completed with no leakage present. The minor packing and flange leaks were corrected via the station work I control program and satisfactorily retested.

l t

i L

l 12 of 23 ,

1 i

i

l 1

APPENDIX A FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS -

f t

i 13 cf 23

FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As Required by the Provisions of the AS%1E Code Rules North Atlantic Energy Service Corporation

1. Owner P.O. Ilox 300, Scabrook, Nil 03874 (Name and Address of Owner)

I

2. Plant Seabrook Nuclear Power Station, Seabrook, Nil 03874 (Name and Address of Plant)
3. Plant Unit Seabrook Unit 1
4. Owner Certificate of Authcrization (if required) N/A
5. Commercial Service Date 8/19/90
6. National floard Number for Unit N/A
7. Components inspected See Abstract item No.13
8. Examination Dates 4!9/94 to 7/25/94
9. Inspection Period identification End of First Period
10. Inspection Interval identification First Ten Year Interval
11. Applicable Edition of Section XI 1983 Addenda Summer 1983
12. Date: Revision of Inspection Plan Sept. 30,1993 Rev.0 (SilR) l
13. Abstract of Examinations and Tests. Include a list of examinations and tests and a statement concerning status of work required for the inspection Plan.

See attached Abstract, Page 16. Statement concerning status of work required for the inspection Plan is included in the introduction.

14 Abstract of Results of Examinations and Tests.

See attached Abstract, Page 17.

15. Abstract of Coirective Measures.

See attached Abstract, Page 17.

14 of 23

FORM NIS-1 (Page 2)

We certify titat a) the statements made in this report are correct, b) the examinations and tests meet the inspection Pieri as required by the ASME Code,Section XI, and c) corrective measures taken conform to the rules of the ASME Code,Section XI.

Certificate of Authorization N/A (irapplicable)

Expiration Date N/A Signed *A/ .-- Date / d[W O

(owner) b CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of New Hampshire and employed by llanford Steam Boiler Inspection and Insurance Co. of liartford, CT have inspected the components described in the Owner's Report during the period 4*'/t#75'/to #vu/fW , and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owner's Report in accordance with the Inspection Plan and as required by the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report. Furthermore, neitha i Inspector nor his employer shall be liable in any manner for any personal injury or property dr. mage or a loss of any kind arising from or connection with this inspection.

/WATW - _

spector's Signature)

Commissions A '// 20 7._ N" National floard, State, Pros ince, and Endorsements Date Wf /99Y 15 of 23

1 1

d

13. Abstract of Examinations ASME Class 1 ASME Code l Categorv & Comnonents Examined Method !

B-A (2) Reactor Vessel llead Circumferential Weld UT,MT B-F (4) Pressurizer Safe End UT,PT (2) Pressurizer Safe End UT B-G-1 (18) RPV Stud UT,MT (18) RPV Nut UT,MT (18) RPV Washer VT-1 (24) RC Pump Bolt UT (1) RC Pump Flange Mating Surface VT-1 B-L-2 (1) RC Pump Casing VT-3 B-N-1 (1) Reactor Vessel Interior VT-3 B-P (1) System Leakage Test Conducted on all VT-2 Class 1 Systems ASME Class 2. 3. and NF ASME Code Category bh Comnonents Examined Method C-II (19) Class 2 System Functional Test VT-2 (1) Class 2 System Ilydroctatic Test VT-2 D-A (4) Class 3 System Functional Test VT-2 (7) Class 3 System Ilydrostatic Test VT-2 D-B (1) Class 3 System Functional Test VT-2 (10) Class 3 System Ilydrostatic Test VT-2 D-C (1) Class 3 System Functional Test VT-2 16 of 23

14. ' Abstract of Results of Examinations and Tests ASME Class 1 B-A Two thirds of two reactor vessel head circumferential welds were examined. This completes these two welds as one third of their area was examined during the first refueling outage.

B-F All six Pressurizer safe ends were examined. Full ASME Code UT coverage could not be achieved on five of the six welds. Relief will be pursued. Three of the welds exhibited beam redirection due to columnar grain structure of the weld metal.

One safe end weld had two indict.tions which were evaluated as geometric reflection from the ID.

ASME Class NF Several component supports were identified as having minor problems (i.e. clearances, gaps, etc.). Evaluations were performed and the supports were detennined operable, and did not fall within IWF-3410.

15. Abstract of Corrective Measures Welds and Bolted Comnonents No corrective measures were required as a result of UT examinations. All recorded indications were evaluated and deermined to be related to geometry and weld metal structure. Surface and visual examinations also did not warrant corrective measures.

k Pressure Testing .

No corrective measures were required as a result of pressure testing. Minor packing and  ;

flange leakage was corrected via the station work control program.

Component Sunnorts No corrective measures were required as a result of component support visual examinations. Clearance and gap discrepancies were evaluated by Engineering as acceptable.

17 of 23

APPENDIX B REPAIII / IIEPLACEMENT

SUMMARY

INDEX (From the end of the Second Refueling through the Third Refueling) 18 cf 23

ASME Section XI Renairs/Reclacements l Work Reauest No. Descrintion 92W000355 Replacement of bolting on valve MS-V22 92W000856 Installation of new IA supply to containment 92W002425 Attach support 4633-SG-23 to 4000-TG-13 per DCR 86-420 92W004663 Replacement of DG-V4A 92W005307 Replacement of nuts on pump SF-P10A 92W005635 Replacement of column on pump SW-P-41C 93W000401 Reinstall CAP-V2 93W000478 Replacement of bowl and column on pump SW-P-41D 93W001151 Replacement of bowl and columns on pump SW-P-41B 93W001338 Attachment of non ASME support to 458-SG-4 93W001386 Installation of dropout spool on SW train A. ,

93W001406 Attachment of access platfonn to ASME supports 4000-SG-72, 45S-SG-1, & 457-SG-1 93W001455 Replacement ofintemals on valve MS-PV-3001 93W001456 Replacement ofinternals on valve MS-PV-3002 93W001457 Replacement ofinternals on valve MS-PV-3003 93W001458 Replacement ofinternals on valve MS-PV-3004 93W001532 Repair of bonnet and replacement of bolting on valve SB-V9 93W001603 End bracket rotation on snubber 202-RM-10 93W001604 End bracket rotation on snubber 203-RM-9 93W001605 End bracket rotation on snubber 4002-RM-5 93W001606 End bracket rotation on snubber 4001-RM-6 93W001608 End bracket rotation on snubber 4607-RM-5B 93W001609 End bracket rotation on snubber 204-RM-9 93W0016!1 Replacement of snubber 201-RM-10 93W001612 ud bracket rotation on snubber 180-RM-3 93W001652 Replacement of casing nuts on pump SF-P10B 93W001750 Attachment of support 4629-SG-12 per DCR 86-420 93W001752 Attachment of supports 4629-SG-14,4000-TG-13, and 4606-SG-10 per DCR 86-420 93W001792 Cut end bracket to allow removal ofload pin 93 WOO 1796 Replacement of snubber 21-RM-12 93W001850 End bracket rotation on snubber 261-RM-8 93W001851 End bracket rotation on snubber 58-RM-1 93W001852 End bracket rotation on snubber 162-RM-8 93W001853 End bracket rotation on snubber 202-RM-15 93W001854 End bracket rotation on snubber 203-RM-10 l 93W001981 Bolting replacement on A S/G handhole j i

l 19 0f 23

ASME Section XI Repairs / Replacements (continued)

Work Reauest No. Descrintion 93W001982 Bolting replacement on D S/G handhole 93 WOO 2087 Replacement of seals on pump FW-P-37B 93W002413 Attachment to supports 783-RG-3 and 58-SV-20 93W002455 Replacement of bolting and helicoil thread insert on the B S/G ,

primary manway 93 WOO 2456 Replacement of bolting and helicoil thread insert on the C S/G primary manway 93 WOO 2473 Replacement / machining of primary manway bolting on S/G B 93 WOO 2474 Machining of studs on S/G C 93 WOO 2503 Replacement of channel head bolts and repair of the flange on heat exchanger DG-E-42A 93W002544 Replacement of secondary manway bolting on S/G D 93 WOO 2763 Replacement of trim on valve MS-V394 93 WOO 2776 Replacement of valve MS-V96 93W002898 Replacement of disc and stem on valve CS-V122 93W002899 Replacement of disc and stem on valve CS-V123 93 WOO 2900 Replacement of disc and stem on valve CS-V126 93W002901 Replacement of disc and stem on valve CS-V127 93 WOO 3014 Replacement of plug assembly cap screws on valves MS-PV-3001, ,

MS-PV-3002, and MS-PV-3003 93W003315 Modification of support 1802-SV-10 93 WOC 3316 Modification of support 1806-RG-1 93W003317 Modification of support 1806-SG-2 93 WOO 3318 Modification of support 1806-SG-3 93 WOO 3319 Modification of support 1806-SG-5 93W003320 Replaced bolting on support 1808-RG-1 ,

93 WOO 3322 Modification of support 1811-RG-1 93W003323 Modification of support 1811-SG 2 93 WOO 3324 Modification of support i811-SG-3 93 WOO 3325 Modification of support 1811-RG-5 93 WOO 3326 Deleted snubber per DCR 93-0003 93 WOO 3328 Modification of support 1812-RM-24 93 WOO 3329 Modification of support 1813-SG-1 l 93W003330 Modification of support 1813-RG-2 93 WOO 3331 Modification of support 1813-SG-3 93W003332 Modification of support 1813-RG-4 20 of 23 l

1

)

. _ . . _ i

ASME Section XI Renairs/ Replacements (continued)

Work Reauest No. Descrintion 93W003333 Modification of support 1813-SG-6 93 WOO 3553 Attachment to support 1811-RG-5 for 1-SW-FT-6181 93W003554 Attachment to support 1811-RG-5 for 1-SW-FT-6191 93 WOO 3608 Replacement of safety valve RC-V115 93 WOO 3609 Replacement of safety valve RC-V116 93 WOO 3610 Replacement of safety valve RC-V117 93W003750 Repair of flange on SW line 1801. Replacement of flange on discharge piping. Replacement of bolting on valve SW-V48.

93 WOO 3838 Repair of nozzle and subsequent replacement of valve CC-V840 93W004004 Replacement of nuts on the containment equipment hatch 93 WOO 4040 Replacement of valve SW-V1 93 WOO 4076 Deleted snubber 81-RM-33 93 WOO 4369 Replacement of bolting on heat exchanger CC-E-11 B.

Replacement of bolting on support 1832-RG-1.

94W000078 Replacement of piping on SW DG B 94W000079 Replacement of piping on SW DG A 94W000099 Replacement of bolting on heat exchanger CS-E-4 94W000167 Install snubber 1310-RM-52 and install support 1M0-RG-21 per DCR 86-0420 94W000168 Delete snubber 1301-RM-20 94W000281 Modification of support 1813-RG-2 94W000292 Modification of support 1811-SG-2 94W000293 Remove support item 4 on support 1806-RG-5 and reinstall when '

completc 94W000295 Replacement of bolting on support 1813-RG-2 94W000296 Replacement of bolting on support 1808-RG-2 94W000352 Installation of sleeve in SW-EP-48 94W000353 Installation of sleeve in SW-EP-46 94W000418 Installation of sleeve in SW. EP-47 94W000945 Attach ASCV transducer to support 4003-RG-29 94W000947 Attach ASCV transducer to support 4002-RG-29 94W000948 Attach ASCV transducer to support 4001-RG-28 94W000949 Attach ASCV transducer to support 4000-RG-28 94 N001087 Replacement of pump SW-P-41B 94W001088 Replacement of pump SW-P-41C 94W001377 Replacement of studs on heat exchanger DG-E-42B 94 WOO 1460 Replacement ofinternals on valve CS-FCV-121 21 of 23

ASME Seq 11gn XI Renairs/ Replacements (continued)

Work Reauest No. Description 94W001493 Replace snubber 49-RM-2. Replace U-bolt on pipe clamp.

Replace nuts on pipe clamp.

94W001523 Replace snubber 4000-RM-10 TOP 94W001664 Replacement of bolting on Alternate Cooling flange 94W001720 Replacement of bolting on heat exchanger CC-E-17A 94W001721 Replacement of bolting on heat exchanger CC-E-17B 94W001789 Replacement of flange and bolting on valve SW-VI14 94W001790 Repair of weld-o-let 94W001807 Relocate strut 1810-SG-14 per DCR 93-003 94W001834 Repair field weld on support 329-RG-24 94W001840 Replacement of flange bolting on valve SW-V130 94W001843 Replacement of flange and bolting on valve SW-VI19 94W001844 Replacement of flange and bolting on valve SW-V117 94W001845 Replacement of flange, bolting, and weld-o-let base metal repair associated with valve SW-V49 94W001846 Replacement of bolting on valve SW-V129 94W001847 Replacement of bolting on valve SW-V126 94W001848 Replacement of bolting on valve SW, V125 94W001849 Replacement of bolting on valve SW-V37 94W001878 Replacement ofload stud bolts on support 4417-RM-11 94W001916 Installation of flow baffles on heat exchanger CC-E-17A 94W001917 Installation of flow baffles on heat exchanger CC-E-17B 94W001959 Modify support 1304-RM-46 per DRR 94-128 94W001986 Replacement of flange and bolting on valve SW-V103 94W001987 Replacement of bolting on valve SW-V73 94W001988 Replacernent flange and bolting on valve SW-V104 94W001991 Replacement of flange bolting, and base metal repair of flange associated with now element SW-FE-6151 94W001993 Replacement of flange bolting on temp. element SW-TE-6115 94 WOO 2017 Replacement of flange bolting on valve SW-V102 94 WOO 2018 Replacement of flange bolting on valve SW-V101 94W002019 Replacement of flange bolting on valve SW-V32 94W002020 Replacement of flange bolting on valve SW-V120 94W002021 Replacement of flange bolting on temp. element SW-TE-6105 94 WOO 2022 Replacement of flange bolting on flow element SW-TE-6150 94 WOO 2023 Replacement of flange bolting on flow element SW-TE-6150 94 WOO 2037 Replacement of flange bolting on valve SW-V65 22 of 23 m - , -- -

ASME Section XI Renairs/Renlacements (continued)

Work Reouest Na Descrintion 94W002038 Replacement of flange bolting on vahe SW-V67 94W002039 Replacement of nuts on SW-1802-JTR-1501. Base metal repair on welds SW-F1201,F1212, and F1401.

94 WOO 2148 Removal and reinstallation of support 703-A-14 for RCP removal 94 WOO 2150 Removal and reinstallation of support 819-A-13 for RCP removal 94 WOO 2152 Replacement of bolting on pump RC-P-1D 94W002153 Replacement of main Dange bolt on pump RC-P-1 A 94 WOO 2154 Replacement of bolting on supports 333-SG-l&2 94W002167 Replacement of flange bclting on valve SW-VI11 94 WOO 2168 Replacement of flange bolting on valve SW-V62 94 WOO 2169 Replacement of flange bolting on valve SW-V121 94W002170 Replacement of flange bolting on flow element SW-FE-6163 94 WOO 2171 Replacement of flange bolting on flow element SW-FE-6163 94 WOO 2172 Replacement of flange bolting on temp element SW-FE-6184 94 WOO 2173 Replacement of bolting on valve SW-V68 94W002174 Replacement of bolting on valve SW-V70 94W002243 Replacement of flange nats on SW-EP-40 94RM21132 Replacement of seals on pump CS-P-2A 94RM22682001 Replacement of seal cartridge on pump RCP-1B 94RM22683600 Replacement of seal cartridge on pump RCP-1C 94RM22684001 Replacement of seal cartridge on pump RCP-1 D PO# 83009 Repair Service Water pump serial # NG2532 PO# 88280 Repair Service Water pump serial # NG2533 Various Base metal repair of welds / piping on Service Water train A Various Replacement of flanges on Service Water train A l

1 l

23 of 23