1
- o INSERVICE INSPECTION EXAMINATION REPORT i
)
of SEABROOK STATION for j
l NORTH ATLANTIC ENERGY SERVICE CORPORATION P.O. Box 300 Seabrook,NH 03874 Commercial Service Date:
August 19,1990 Refueling Outage:
4 Period:
2 Intenal:
1 l
Prepared By:
ad I F
Date a <27- %
ISI Coordinator [/
Approved By:
Date c@~J7-fd Component Performance Supervisor 9603120505 960307 PDR ADOCK 05000443 G
t.
TABLE OF CONTENTS j
P_ age i
' INTRODUCTION 1
DETAILED
SUMMARY
1.0 Nondestructive Examination Procedures 2
2.0 Summary Report 3
j APPENDIX A Form NIS-1 Owner's Report for Inservice Inspections 25 APPENDIX B Repair / Replacement Summary Index.
32 l
i
i
- - t TABLE OF CONTENTS Eage INTRODUCTION 1
DETAILED
SUMMARY
1.0 Nondestructive Examination Procedures 2
2.0 Summary Report 3
APPENDIX A Form NIS-1 Owner's Report for Inservice Inspections 25 APPENDIX B Repair / Replacement Summary Index 32 i
l I
- f 2
INTRODUCTION l
Inservice Inspection Examinations of ASME Class 1,2, and 3 piping welds and components were conducted at Seabrook Station in accordance with ASME Section XI, 1983 Edition through Summer 1983 Addenda and the ISI Program Plan. This report summarizes ISI examinations completed just prior to and during the fourth refueling outage which concluded on December 11,1995. ISI Period 2 is complete with approximately 58% of the Interval 1 examinations completed.
i 1of35
r.
t DETAILED ISI
SUMMARY
1.0 NONDESTRUCTIVE EXAMINATION PROCEDURES The following procedures were used during refueling outage #4 inservice inspection. Three procedures utilized (VT, PT, and MT) were North Atlantic Energy Service Corporation (NAESCO) procedures. The remaining procedures used were Yankee Atomic Electric Company (YAEC) procedures approved for use by NAESCO Station Operation Review Commitee (SORC). YAEC serves as the certifying agent in NDE for NAESCO.
ESI807.001 Visual Examination Procedure ESI807.002 Liquid Penetrant Examination - Solvent Removable ES1807.003 Magnetic Particle Examination YA-G-IS Preparation of Welds For Nondestructive Examination YA-UT-IS Ultrasonic Testing - General Requirements -
YA-UT-2S Ultrasonic Testing of Welds YA-UT-4S Ultrasonic Testing of Nozzle Inner Radii YA-UT-5S Ultrasonic Testing of Materials YA-UT-100S Ultrasonic Sizing ofID Connected Planar Flaws YA-UT-112S Ultrasonic Thickness Measurement The following techniques were used for the subject examinations:
YA-UT-2S S2-95-01 Rev. I S2-95-12 Rev. O S2-95-02 Rev.1 S2-95-13 Rev. O S2-95-03 Rev. O S2-95-14 Rev. O i
S2-95-04 Rev. 0 S2-95-15 Rev. 0 i
S2-95-05 Rev. O S2-95-16 Rev. O S2-95-06 Rev. O S2-95-17 Rev. O S2-95-07 Rev. O S2-95-18 Rev. O S2 95-08 Rev. O S2-95-19 Rev. 0 YA-UT-4S S4-95-01 Rev. 0 YA-UT-SS S5-95-01 Rev. 0 2 0f 35
4.
2.0
SUMMARY
REPORT The following is a summary of all examinations performed, conditions noted, and corrective measures taken during the fourth refueling inservice inspection.
Code Category B-B Pressure Retain:ng Welds in Veccels Other Than Reactor Vessel Steam Generator "C" tubesheet to head weld, RC E-11C SEAM-1 was examined by UT with no recordable indications.
Code Category B-D Full Penetration Welds of Nozzles in Vessels Two pressurizer nozzles, RC E-10 B-NZ and RC E-10 C-NZ, and their associated inner radii, RC E-10 B-IR and RC E-10 C-IR were examined by UT with no recordable indications. The two nozzle examinations could not achieve full ASME Code required volume. Relief will be pursued.
Two steam generator nozzles, RC E-11C 2A-NZ and RC E-11C 2B-NZ, and their associated inner radii, RC E-11C 2A-IR and RC E-11C 2B-IR were examined by UT with no recordable indications.
Code Category B-G-1 Pressure Retnining Bolting. Greater Than 2 in. In Diameter RC RPV STUD UT and MT (no unacceptable indications)
No's 16,17,18,19, 20,21,22,23,24,42, 43,44,45,46,47,48, 49, & 50 RC RPV NUT VT-1 (no unacceptable indications)
No's 16,17,18,19, 20,21,22,23,24,42 43,44,45,46,47,48, 49, & 50 RC RPV WASHER VT-1 (no unacceptable indications)
No's 16,17,18,19, 20,21,22,23,24,42, 43,44,45,46,47,48, I
49, & 50 3 of 35 4
2.0
SUMMARY
REPORT (continued)
Code Category B-G-2 Pressure Retnining Bolting. 2 in. and Less In Diameter The following components had bolting visually examined (VT-1) in place and under tension.
RC 0013-01 V23-B No unacceptable conditions noted.
RC 0058-01 V88-B No unacceptable conditions noted.
RC 0074-01 VI15-B No unacceptable conditions noted.
RC 0075-01 V116-B No unacceptable conditions noted.
RC 0076-01 VI17-B No unacceptable conditions noted.
RC 0080-02 PCV456A-B No unacceptable conditions noted.
j RC 0080-02 V122-B Failed VT-1 examination. A loose bonnet nut was discovered. Bonnet nuts were retorqued and valve i
successfully re-examined. A sample expansion of 13 were examined with no unacceptable conditions noted.
i RC 0080-06 PCV456B-B No unacceptable conditions noted.
RC 0080-06 V124-B No unacceptable conditions noted.
RC 0094-01 V51-B No unacceptable conditions noted.
RC 0096-01 V80-B No unacceptable conditions noted.
RC 0097-01 LCV459-B No unacceptable conditions noted.
RC 0097-01 V81-B No unacceptable conditions noted.
RH 0162-02 V31-B No unacceptable conditions noted.
RH 0163-02 V30-B No unacceptable conditions noted.
RH 0163-02 V65-B No unacceptable conditions noted.
SI 0201-02 V3-B No unacceptable conditions noted.
SI 0201-02 V6-B No unacceptable conditions noted.
SI 0202-02 V17-B No unacceptable conditions noted.
SI 0202-02 V20-B No unacceptable conditions noted.
SI 0202-02 V21-B No unacceptable conditions noted.
i S10203-02 V32-B No unacceptable conditions noted.
SI 0203-02 V35-B No unacceptable conditions noted.
SI 0203-02 V36-B No unacceptable conditions noted.
SI 0204-02 V47-B No unacceptable conditions noted.
SI 0204-02 V51-B No unacceptable conditions noted.
SI 0273-01 FE-925-B No unacceptable conditions noted.
SI 0273-01 V147-B No unacceptable conditions noted.
4 of 35
t
./
i 2.0
SUMMARY
REPORT (continued)
Code Category B-J Pressure Retnining Welds in Piping The following Reactor Coolant System piping welds were examined as follows:
RC 0006-0104B Liquid penetrant examination was performed with no unacceptable indications.
RC 0009-0106B Liquid penetrant examination was performed with no unacceptable indict.tions.
i RC 0012-0105B Liquid penetrant examination was performed with no unacceptable indications.
RC 0048-02 21 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
)
RC 0048-03 01 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RC 0048-03 04 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RC 0048-03 05 Ultrasonic and liquid penetrant examinations were perfonned with no unacceptable indications.
RC 0048-03 06 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RC 0074-0101 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RC 0074-0102 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RC 0074-0103 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RC 0075-0101 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RC 0075-0102 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
5 of 35
.~
t
/
2.0
SUMMARY
REPORT (continued)
Code Category B-J Pressure Retnining Welds in Piping (continued)
RC 0075-0103 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RC 0080-02 01 Liquid penetrant examination was performed with no unacceptable indications.
RC 0080-02 02 Liquid penetrant examination was performed with no unacceptable indications.
RC 0080-02 03 Liquid penetrant examination recorded one linear indication which was corrected by surface conditioning and successfully re-examined.
RC 0080-02 04 Liquid penetrant examination recorded one linear indication which was corrected by surface conditioning and successfully re-examined.
j RC 0080-02 05 Liquid penetrant examination was perfonned with no unacceptable indications.
RC 0080-02 06 Liquid penetrant examination was performed with no unacceptable indications.
RC 0080-02 07 Liquid penetrant examination was performed with no unacceptable indications.
RC 0080-02 08 Liquid penetrant examination was performed with no unacceptable indications.
l RC 0080-02 09 Liquid penetrant examination was performed with no unacceptable indications.
RC 0080-0210 Liquid penetrais examination was performed with no unacceptable indiations.
RC 0080-0211 Liquid penetrant examination was performed with no unacceptable indications.
RC 0080-06 01 Liquid penetrant examination was performed with no unacceptable indications.
6of35
}
t
/
I I
l 2.0
SUMMARY
REPORT (continued) i l
Code Category B-J Pressure Retaining Welds in Pining (continued)
RC 0080-06 02 Liquid penetrant examination was performed with no unacceptable indications.
RC 0080-06 03 Liquid penetrant examination was performed with no unacceptable indications.
RC 0080-06 04 Liquid penetrant examination was performed with no l
unacceptable indications.
RC 0080-06 05 Liquid penetrant examination was performed with no unacceptable indications.
RC 0080-06 06 Liquid penetrant examination was performed with no unacceptable indications.
RC 0080-06 07 Liquid penetrant examination was performed with no unacceptable indications.
RC 0080-06 08 Liquid penetrant examination was performed with no unacceptable indications.
RC 0080-0610 Liquid penetrant examination was performed with no unacceptable indications.
RC 0080-0611 Liquid penetrant examination was performed with no unacceptable indications.
RC 0094-0104 Liquid penetrant examination was performed with no unacceptable indications.
RC 0094-0105 Liquid penetrant examination was performed with no unacceptable indications.
RC 0096-0101 Liquid penetrant examination was performed with no unacceptable indications.
RC 0096-0102 Liquid penetrant examination was performed with no unacceptable indications.
7 of 35
i t
/
j 2.0
SUMMARY
REPORT (continued)
Code Category B-J Pressure Retaining Welds in Piping (continued)
RC 0097-0128 Liquid penetrant examination was performed with no unacceptable indications.
j 1
l RC 0097-0129 Liquid penetrant examination was performed with no unacceptable indications.
RC 0097-0130 Liquid penetrant examination was performed with no unacceptable indications.
The following Residual Heat Removal System welds were examined as follows:
RH 0162-02 02 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RH 0163-02 07 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RH 0163-02 08 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RH 0163-02 09 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RH 0180-02 02 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RH 0180-02 03 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
The following Safety Injection System piping welds were examined as follows:
SI 0201-02 05 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
SI 0201-02 06 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
S1 0202-02 17 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
8 of 35 l
.t e'
i 2.0
SUMMARY
REPORT (continued)
Code Category B-J Pressure Retaining Welds in Piping (continued)
SI 0251-05 06 Liquid penetrant examination was performed with no unacceptable indications.
S1 0258-02 02 Liquid penetrant examination was performed with no j
unacceptable indications.
SI 0258-02 03 Liquid penetrant examination was performed with no unacceptable indications.
SI 0272-04 04 Liquid penetrant examination was performed with no unacceptable indications.
SI 0272-04 05 Liquid penetrant examination was performed with no unacceptable indications.
SI 0272-04 08 Liquid penetrant examination was performed with no unacceptable indications.
SI 0272-04 09 Liquid penetrant examination was performed with no unacceptable indications.
SI 0273-01 07 Liquid penetrant examination was performed with no unacceptable indications.
S1 0273-01 08 Liquid penetrant examination was performed with no unacceptable indications.
SI 0273-01 10 Liquid penetrant examination was performed with no unacceptable indications.
SI 0273-01 11 Liquid penetrant examination was performed with no unacceptable indications.
SI 0274-01 11 Liquid penetrant examination was performed with no unacceptable indications.
SI 0274-01 12 Liquid penetrant examination was performed with no unacceptable indications.
9 of 35
i 2.0
SUMMARY
REPORT (continued)
Code Catenorv B-J Pressure Retninino Welds in Pinino (continued)
SI 0275-04 10 Liquid penetrant examination was performed with no unacceptable indications.
SI 0275-04 11 Liquid penetrant examination was performed with no unacceptable indications.
SI 0275-06 01 Liquid penetrant examination recorded an acceptable linear indication.
SI 0275-% 02 Liquid penetrant examination was performed with no unacceptable indications.
i Code Category B-P All Pressure Retaining Comnonents A final system leakage test was conducted on the Reactor Coolant System prior to plant startup from refueling. Visual examination noted no unacceptable conditions.
Code Category C-A Pressure Retaining Welds in Pressure Vessels i
RC E-11 A SEAM-2 Ultrasonic examination was performed with no unacceptable indications. Full ASME Code required volume could not be achieved. Relief will be pursued.
i i
RC E-11 A SEAM-5 Ultrasonic examination was performed with no i
unacceptable indications.
RC E-11 A SEAM 6 Ultrasonic examination was performed with no unacceptable indications. Full ASME Code required volume could not be achieved. Relief will be pursued.
RC E-11 A SEAM-8 Ultrasonic examination was performed with no unacceptable indications.
CS E-3 C Ultrasonic examination recorded two indications.
Evaluation determined that the indications were caused by internal baffle plate attachment geometry. This was verified by review of the heat exchanger drawing. Also, full ASME Code required volume could not be achieved.
Relief will be pursued.
10 of 35
(
i a
l l
2.0
SUMMARY
REPORT (continued)
J Code Category C-B Pressure Retainino Nozzle Welds in Vessels i
1 RC E-11 A 16-NZ Ultrasonic examination was performed with no unacceptable indications. Full ASME Code required volume could not be achieved. Relief will be pursued.
4 Magnetic particle examination was performed with no -
unacceptable indications.
RH E-9B NZB-B Visual examination (VT-2) was performed with no i
unacceptable conditions noted.
RH E-9B NZA-B Visual examination (VT-2) was performed with no unacceptable conditions noted.
4 Code Category C-C Integral Attachments For Vessels. Piping. Pumns. and Valves CBS 1214-00 A-1-L Liquid penetrant examination was performed with no unacceptable indications.
CBS 1216-00 A-1-L Liquid penetrant examination was performed with no unacceptable indications.
Code Category C-F-1 Pressure Retaining Welds in Austenitic Stainless Steel or-High Allov Piping CBS 1202-03 03 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
CBS 1202-03 LU39 Ultrasonic and liquid penetrant exuninations were performed with no unacceptable indications.
CBS 1207-0108 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
CBS 1207-01 LU14 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
CBS 1207-01 LD15 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
11 of 35
t o
2.0
SUMMARY
REPORT (continued)
Code Category C-F-1 ' Pressure Retnining Welds in Austenitic Stainless Steel or High Allov Piping (continued)
CBS 1207-01 LD16 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
CBS 1207-02 02 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
CBS 1207-02 LUl7 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
CBS 1209-0102 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
CBS 1209-01 LD4 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
CBS 1213-0102 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
CBS 1213-02 03 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
CBS 1213-02 09 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
CBS 1213-03 02 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
I CBS 1213-03 LU4 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
CBS 1214-0102 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
CBS 1214-01 LD1 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
)
CBS 1214-01 LD2 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
12 of 35
t 2.0
SUMMARY
REPORT (continued)
Code Category C-F-1 Pressure Retnining Welds in Austenitic Stainless Steel or High Allov Piping (continued)
CBS 1214-01 LD3 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
CBS 1214-01 LU4 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
CBS 1214-0219 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
CBS 1214-02 21 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
t CS 0328-01 10 Liquid penetrant examination was performed with no unacceptable indications.
CS 0328-02 04 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
CS 0328-02 21 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
CS 0329-0107 Liquid penetrant examination was performed with no.
unacceptable indications.
CS 0358-0101 Liquid penetrant examination was performed with no I
unacceptable indications.
I CS 0358-02 01 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
CS 0363-0101 Liquid penetrant examination was performed with no unacceptable indications.
CS 0369-02 53 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
CS 0369-03 08 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
J l
13 of 35 I
1 t.
l 2.0
SUMMARY
REPORT (continued) l Code Category C-F-1 Pressure Retnining Welds in Austenitic Stainless Steel or l
High Allov Piping (continued) 1 CS 0371-0101 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
i CS 0371-03 08 Ultrasonic and liquid penetrant examinations were.
performed with no unacceptable indications.
RC 0013-02 LU9 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RC 0013-02 LD12 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RC 0013-02 LU12 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RC 0013-0215 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RC 0013-0216 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
l RC 0013-02 21 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RC 0013-03 01 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RC 0013-03 04 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RC 0013-03 LU7 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
1 RC 0013-03 LD8 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RC 0013-0410 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
14 of 35
l t
d 2.0
SUMMARY
REPORT (continued)
Code Category C-F-1 Pressure Retaining Welds in Austenitic Stainless Steel or i
High Alloy P.ip.ing (continued) l RC 0013-04 LUl Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RH 0151-0102 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RH 0151-10 03 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RH 0151-10 04 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RH 0151-10 LDS Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RH 0151-10 LU5 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
RH 0152-0103 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
SI 0250-02 07 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
SI 0250-02 14 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
SI 0250-03 01 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
SI 0250-03 03 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
SI 0250-03 04 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
SI 0250-04 02 Liquid penetrant examination was performed with no unacceptable indications.
15 of 35
l
/
l 2.0
SUMMARY
REPORT (continued)
Code Category C-F-1 Pressure Retaining Welds in Austenitic Stainless Steel or High Alloy Piping (continued)
SI 0251-03 09 Ultrasonic and liquid penetrant examinations were I
performed with no unacceptable indications.
SI 0251-04 07 Liquid penetrant examination was performed with no unacceptable indications.
SI 0258-01 02 Liquid penetrant examination was performed with no unacceptable indications.
SI 0258-02 01 Liquid penetrant examination was performed with no unacceptable indications.
SI 0259-01 01 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
SI 0272-02 10 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
l SI 0272-03 03 Ultrasonic and liquid penetrant examinations were performed with no unacceptable indications.
Code Category C-F-2 Pressure Retnining Welds in Carbon Steel or Low Alloy Steel Pinino l
FW 4606-03 03 Ultrasonic and magnetic particle examinations were performed with no unacceptable indications.
FW 4606-03 04 Ultrasonic examination was performed with no unacceptable indications. Magnetic particle examination recorded several linear indications which were corrected by surface conditioning and successfully re-examined.
l FW 46%-03 07 Ultrasonic examination was performed with no l
unacceptable indications. Magnetic particle examination recorded a linear indication which was corrected by surface conditioning and successfully re-examined.
16 of 35 l
-~.
t
?
s 2.0
SUMMARY
REPORT (continued)
Code Category C-F-2 Pressure Retnining Welds in Carbon Steel or Low Alloy Steel Piping (continued)
FW 4606-0311 Ultrasonic and magnetic particle examinations were performed with no unacceptable indications.
FW 4606-0312 Ultrasonic and magnetic particle examinations were performed with no unacceptable indications.
FW 4606-04 01 Ultrasonic and magnetic particle examinations were performed with no unacceptable indications.
FW 4606-04 21 Ultrasonic and magnetic particle examinations were j
performed with no unacceptable indications.
FW 4609-03 01 Ultrasonic examination was performed with no unacceptable indications. Magnetic particle examination recorded two linear indications which were corrected by surface conditioning and successfully re-examined.
FW 4609-03 02 Ukrasonic and magnetic particle examinations were performed with no unacceptable indications.
FW 4609-03 03 Ultrasonic and magnetic particle examinations were performed with no unacceptable indications.
FW 4609-03 04 Ultrasonic and magnetic particle examinations were performed with no unacceptable indications.
FW 4609-03 05 Ultrasonic and magnetic particle examinations were performed with no unacceptable indications.
FW 4609-03 07 Ultrasonic and magnetic particle examinations were performed with no unacceptable indications.
FW 4609-03 08
. Ultrasonic examination was performed with no unacceptable indications. Magnetic particle examination recorded two linear indications which were corrected by surface conditioning and successfully re-examined.
17of35
i s
2.0
SUMMARY
REPORT (continued).
Code Category C-F-2 Pressure Retaining Welds in Carbon Steel or Low Allov Steel Piping (continued)
FW 4609-0312 Ultrasonic and magnetic particle examinations were performed with no unacceptable indications.
FW 4609-0313 Ultrasonic and magnetic particle examinations were.
performed with no unacceptable indications.
FW 4609-04 01 Ultrasonic and magnetic particle examinations were performed with no unacceptable indications.
FW 4609-04 21 Ultrasonic and magnetic particle examinations were performed with no unacceptable indications.
MS 4000-02 04 Ultrasonic and magnetic particle examinations were performed with no unacceptable indications.
MS 4000-0210 Ultrasonic and magnetic particle examinations were performed with no unacceptable indications.
MS 4003-02 02 Ultrasonic and magnetic particle examinations were performed with no unacceptable indications.
MS 4003-02 04 Ultrasonic and magnetic particle examinations were performed with no unacceptable indications.
MS 4003-0212 Ultrasonic and magnetic particle examinations were performed with no unacceptable indications.
MS 4003-36 08 Ultrasonic and magnetic particle examinations were performed with no unacceptable indications.
MS 4003-36 LU8 Ultrasonic and magnetic particle examinations were j
performed with no unacceptable indications.
ISI Suonorts (NF)
The following supports received a VT-3 / VT-4 visual examination. Problem sheet number refers to supports that required evaluations (i.e. clearances, gaps, etc.). Evaluations were performed and the supports were determined to be operable, and did not fall within IWF-3410A.
18 of 35
d l
2.0
SUMMARY
REPORT (continued)
ISI Sunnorts (NF) (continued) i Support No.
System Class Status Problem Sh. No.
RC Pump Supt. (4)
RC 1
Eval / Accept 1-0013-SG-004 RC 1
Accept 1-0013-SG-007 RC 1
Accept 1-0021-SG-003 RC 2
Accept 1-0021-SG-005 RC 1
Accept l-0048-RG-017 RC 1
Eval / Accept OR04-9 1-0048-RG-018 RC 1
Accept 1-0048-SG-002 RC 1
Accept 1-0048-SG-009 RC 1
Accept 1-0048-SG-011 RC 1
Eval / Accept OR04-8 1-0048-SG-012 RC 1
Accept 1-0048-SG-016 RC 1
Accept 1-0048-SV-026 RC 1
EvalAccept 1-0151-RG-006 RH 2
Accept 1-0151-RG-007 RH 2
Accept 1-0151-RG-013 RH 2
Accept 1-0151-SG-003 RH 2
Accept l-0151-SV-014 RH 2
Accept 1-0152-SV-001 RH 2
Accept 1-0155-A-012 RH 2
Eval / Accept 1-0155-RG-023 RH 2
Accept 1-0155-RG-026 RH 2
Eval / Accept OR04-3 1-0155-RG-028 RH 2
Accept 1-0155-SG-003 RH 1
Accept 1-0155-SG-009 RH 2
Accept 1-0155-SG-015 RH 2
Eval / Accept 1-0155-SG-022 RH 2
Accept 1-0155-SG-024 RH 2
Accept 1-0155-SH-030 RH 2
Accept 1-0155-SV-020 RH 1
Accept 1-0157-RG-004 RH 2
Accept 1-0157-RG-Oll RH 2
Eval / Accept OR04-1 1-0157-SG-001 RH 2
Accept 1-0157-SG-002B RH 2
Accept 1-0157-SG-010 RH 2
Accept 10157-SH-017 RH 2
Accept 1-0157-SV-016 RH 2
Accept 1-0158-RG-001 RH 2
Accept 19 0f 35
t 2.0
SUMMARY
REPORT (continued)
ISI Supoorts (NF) (continued)
Support No.
System Class Status Problem Sh. No.
1-0158-RG-003 RH 2
Eval / Accept OR04-2 1-0158-RG-011 RH 2
Accept 1-0158-SG-004 RH 2
Accept 1-0158-SG-007 RH 2
Accept 1-0158-SG-009 RH 2
Accept 1-0158-SG-012 RH 2
Accept 1-0158-SH-008 RH 2
Accept 1-0158-SH-010 RH 2
Accept 1-0158-SV-002 RH 2
Accept 1-0160-RG-002 RH 2
Accept 1-0160-RG-023 RH 2
Accept 1-0160-SG-009 RH 1
Accept 1-0160-SG-010 RH I
Accept 1-0163-SG-009 RH 1
Eval / Accept 1-0163-SG-010 RH I
Accept 1-0250-RG-009 S1 2
Accept 1-0250-SG-015 SI 2
Accept 1-0250-SG-016 SI 2
Accept 1-0250-SG-020 SI 2
Accept 1-0256-A-021 SI 2
Eval / Accept 1-0256-RG-020 SI 2
Eval / Accept 1-0256-SG-001 SI 2
Accept 1-0256-SG-002 SI 2
Accept 1-0256-SG-003 SI 2
Eval / Accept 1-0256-SG-004 SI 2
Accept i
1-0256-SG-005 SI 2
Accept 1-0256-SG-006 SI 2
Eval / Accept 1-0256-SG-007 SI 2
Eval / Accept 1-0256-SG-008 SI 2
Accept 1-0256-SG-014 SI 2
Accept 1-0256-SG-016 SI 2
Accept 1-0256-SG-022 SI 2
Eval / Accept OR04-11 1-0272-A-017 SI 2
Accept l-0272-RG-002 SI 1
Accept 1-0272-SG-014 SI 1
Accept 1-0272-SG-015 SI 1
Accept 1-0272-SG-016 SI 1
Eval / Accept OR04-13 1-0272-SG-018 SI 1
Eval / Accept OR04-7 200f35
i 2.0
SUMMARY
REPORT (continued)
ISI Supports (NFT (continued)
Support No.
System Class Status Problem Sh No.
1-0272-SG-020 SI 2
Accept 1-0273-SG-002 SI 1
Accept 1-0273-SG-003 SI 1
Accept 1-0273-SG-004 SI 2
Accept 1-0327-RG-006 CS 2
Accept 1-0327-RG-007 CS 2
Accept 1-0327-SG-017 CS 2
Accept 1-0364-RG-001 CS 2
Accept 1-0364-SG-005 CS 2
Accept 1-0364-SV-002 CS 2
Accept 1-0365-SG-009
'CS 1
Accept 1-0365-SG-010 CS 1
Eval / Accept l-0365-SG-012 CS 1
Accept 1-0365-SG-014 CS 1
Accept 1-0365-SH-006 CS 1
. Accept 1-0365-SH-008 CS 1
Accept 1-0369-SG-019 CS 2
Eval / Accept OR04-6 1-0371-RG-006 CS 2
Accept 1-0371-SG-001 CS 2
Accept 1-0371-SG-002 CS 2
Accept 1-0371-SG-003 CS 2
Accept 1-0371-SV-004 CS 2
Accept 1-0751-SG-005 CS 2
Accept 1-0777-RG-004 CC 3
Accept 1-0777-RG-007 CC.
3 Accept 1-0777-SG-001
.CC 3
Accept 1-0777-SG-011 CC 3
Accept 1-0777-SG-012 CC 3
Accept 1-0777-SG-020 CC 3
Accept 1-0777-SG-021 CC 3
Accept 1-0777-SH-002 CC 3
Accept 1-0797-SG-005 CC 3
Accept 1-1207-RG-006 CBS 2
Accept 1-1207-SG-005 CBS 2
Accept 1-1207-SG-007 CBS 2
Accept 1-1216-A-001 CBS 2
Accept 1-1216-RG-002 CBS 2
Accept 1-1216-SG-055 CBS 2
Accept 21 of 35
~'.
2.0
SUMMARY
REPORT (continued)
ISI Supports (NFT (continued)
Support No.
System Class Status Problem Sh. No.
1-1216-SG-056 CBS 2
Accept
)
1-4000-RG-003 MS 2
Accept i
1-4000-SG-023 MS 2
Accept 1-4000-SG-072 MS 3
Accept 1-4001-A-027 MS 2
Accept 1-4001-RG-003 MS 2
Accept 1-4001-RG-028 MS 2
Accept 1-4001-RG-062 MS 2
Accept 1-4001-SG-014 MS 2
Accept j
1-4001-FG-023 MS 2
Accept 1-4002-A-028 MS 2
Accept 1-4002-RG-003 MS 2
Eval / Accept j
1-4002-SG-007 MS 2
Accept 1-4002-SG-008 MS 2
Accept 1-4003-SG-008 MS 2
Accept l-4003-SG-014 MS 2
Accept I
l-4003-SG-022 MS 2
Accept 1-4606-SG-004A MS 2
Accept 1-4606-SG-011 MS 2
Accept 1-4606-SV-005A MS 2
Eval / Accept t A04-17 j
1-4606-SV-012 MS 2
Accept l-4608-RG-003A MS 2
Accept 1-4608-RG-006A MS 2
Eval / Accept l-4608-RG-014 MS 2
Accept 1-4608-SG-004A MS 2
Eval / Accept OR04-16 J
1-4608-SG-012 MS 2
Accept Rx Nozzle Suppt.(4)
RC 1
Accept S/G Supports (4)
MS 1
Accept Supnort Examination Problem Sheets l
Problem sheets OR04-1 through OR04-16 evaluated gap descrepancies.
Evaluations were acceptable based on review of support calculations which indicated adequate movements.
)
Problem sheet OR04-17 evaluated the skewed angularity of a spring can assembly. The condition was acceptable based on the angle being within 4 degrees.
22 of 35
)
r-2.0
SUMMARY
REPORT (continued)
Clace 2 and Clau 3 ISI Pressure Tests Procedure No.
Code Category Title j
EX1810.101 B-P Class 1 RC System Functional Test EX1810.201 C-H CBS Train A Functional Test EX1810.202 C-H CBS Train B Functional Test EX1810.203 C-H,D-A RWST & SAT Functional Test EX1810.204 C-H VCT & Piping Functional Test EX1810.206 C-H CS-Charging Pump Discharge Functional Test EX1810.207 C-H RHR Train A Functional Test EX1810.208 C-H RHR Train B Functional Test EX1810.209 C-H SF Cleanup Functional Test EX1810.210 C-H SI System Train A Functional Test EX1810.211 C-H SI System Train B Functional Test i
EX1810.213 C-H Feedwater System Functional Test EX1810.214 C-H IA System Penetration Functional Test EX1810.215 C-H Vent Gas System Penetration Functional Test i
EX1810.216 C-H Low Head Injection Functional Test
)
EX1810.217 C-H Service Air System Penetration
]
Functional Test EX1810.218 C-H RMW System Penetration Functional Test l
EX1810.221 C-H FP System Penetration Functional Test EX1810.222 C-H CGC System Functional Test j
EX1810.223 C-H Loops A & D Main Steam Functional Test EX1810.224 C-H Loops B & C Main Steam System Functional Test EX1810.225 C-H SB System Functional Test EX1810.226 C-H RC Drain Tank Pump Penetration Functional Test EX1810.227 C-H WLD System Sump Penetration Functional Test EX1810.229 C-H CS System Letdown Functional Test EX1810.301 D-A Service Water System Train A Functional Test EX1810.302 D-A Service Water System Train B Functional Test 23 of 35
,c 2.0
SUMMARY
REPORT (continued)
Clacc 2 and Clace 3 ISI Pressure Tests (continued)
Procedure No.
Code Category Title EX1810.303 D-A,D-B,D-C,C-Il Primary Component Cooling Loop B Functional Test
. EX1810.304 D-A,D-B,D-C,C-H Primary Component Cooling Loop A Functional Test EX1810.305 D-A PCCW Thermal Barrier System Functional Test EX1810.306 D-A CS System-Boric Acid Transfer Piping Functional Test EX1810.309 D-C Spent Fuel Pool Cooling System Functional Test EX1810.310 D-A,D-B Emergency Feed Pump Piping Functional Test 1
EX1810.313 D-A DG Cooling Water System Train B Functional Test i
EX1810.314 D-A,D-B DG Starting Air System Train B Functional Test i
EX1810.315 -
D-A,D-B DG Starting Air System Train A Functional Test EX1810.316 D-A DG Cooling Water System Train A
)
Functional Test EX1810.317 D-B MS Supply Line to Emergency Feed Pump Functional Test EX1810.318 D-A DG Fuel Oil System Train A Functional Test EX1810.319 D-A DG Fuel Oil System Train R Functional Test 4
EX1810.320 D-A DG Lube Oil System Train A Functional Test EX1810.321 D-A DG Lube Oil System Train B Functional Test l
l The above tests successfully underwent a VT-2 visual examination. EX1810.309 i
discovered a socket weld on a 3/4" line that was defective. This line was repaired and inspected under the station work control program. During conduct of EX1810.306, boric acid was discovered on a weld. The boric acid was removed, the weld examined by liquid penetrant, and by VT-2 with no unacceptable l
indications. Minor packing and flange leaks were identified and placed on the l
packing adjustment and minor maintenance repetitive task program for correction.
l 24 of 35 i
l,
APPENDIX A FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS 25 of 35 l
j FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS As Required by the Provisions of the ASME Code Rules North Atlantic Energy Service Corporation 1.
Owner P.O. Box 300, Seabrook, NH 03874 (Name and Address of Owner) 2.
Plant-Seabrook Nuclear Power Station, Seabrook, NH 03874 (Name and Address of Plant) 3.
Plant Unit Seabrook Unit i I
4.
Owner Certificate of Authorization (if required)
N/A l
5.
Commercial Service Date 8/19/90 l
6.
National Board Number for Unit N/A 7.
Components Inspected See Abstract item No.13 l
8.
Examination Dates 11/3/95 to 12/11/95 ~
9.
Inspection Period identification End of Second Period i
10.
Inspection Interval Identification First Ten Year Interval l
l
- 11. Applicable Edition of Section XI 1983 Addenda Summer 1983 l
l 12.
Date/ Revision ofInspection Plan Sept. 6,1995 Rev. 2 (SIIR) l l
- 13. Abstract of Examinations and Tests. Include a list of examinations and tests and a statement concerning status of work required for the inspection Plan.
See attached Abstract, Page 28. Statement concerning status of work required for the inspection Plan is included in j
the Introduction.
j 14.
Abstract of Results of Examinations and Tests.
See attached Abstract, Page 29.
l 15.
Abstract of Corrective Measures.
1 See attached Abstract, Page 31, 26 of 35
FORM NIS-1 (Page 2) l We certify that a) the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI, and c) corrective measures taken conform to the rules of the ASME Code,Section XI.
Certificate of Authorization N/A (ifapplicable)
Expiration Date N/A Signed kYa ISI (4 Date EA 27, /99fo n
hner)
CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of New Hampshire and employed by Hartford Steam Boiler inspection and Insurance Co. of Hartford, CT have inspected the components described in the Owner's Report during the period $~/IMV to /E4/ /#f, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owner's Report in accordance with the Inspection Plan and as required by the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connection with this inspection.
/
h/
[
ctor's signature)
Commissions A4/ 20 Z.
"_Z~ "
National Board, state, Province, and Endorsements Date 8 8 27,/ff[
l l
l i
I 27 of 35
l o
- 13. Abstract of Examinations ASME Clau 1
(
'ASME Code i
Category ML Components Examined Method B-B (1)
Steam Generator Head Weld UT B-D (2)
Pressurizer Nozzle UT (2)
Pressurizer Nozzle Inner Radius UT (2)
Steam Generator Nozzle UT (2)
Steam Generator Nozzle Inner UT Radius -
B-G-1 (18)
RPV Nut VT-1 (18)
RPV Washer VT-1 1.
B-G-2 (26)
Valve Bolting VT-1 (1)
Piping Flange Connection VT-1 l
B-J (20)
(48)
System Leakage Test Conducted VT-2 on all Class 1 Systems l
ASME Class 2 ASME Code Category h
Components Exarnined Method C-A (1)
Excess Letdown Heat Exchanger UT Head Weld 1
(4)
Steam Generator Girth Welds UT C-B (1)
Steam Generator Steam Outlet UT,MT Nozzle Weld i
(2)
RHR Heat Exchanger Nozzle VT-2 Welds C-C (2)
PipingIntegral Attachments PT 28 of 35
i-j
^
1 l~
13, Abstract of Examinations (continued)
{
j ASME Clace 2 (continued)
- ASME Code Categorv Comnonents Framined Method C-F-1 (56)
Stainless Steel Piping Welds UT,PT (8)-
Stainless Steel Piping Welds PT C-F-2 (21)
Carbon Steel Piping Welds UT,MT (4)
Carbon Steel Piping Welds MT C-H (27)
Class 2 System Functional Test VT-2
)
ASME Clace 3 and NF ASME Code Categorv Comnonents Examined Method D-A (16)
Class 3 System Functional Test VT-2 D-B (6)
Class 3 System Functional Test VT-2 D-C (3)
Class 3 System Functional Test VT-2 i
NF (151)
Component Supports VT-3 VT-4
- 14. Abstract of Results of Examir.ations and Tests i
B-B One Steam Generator bottom head circumferential weld was examined but full ASME Code coverage could not be achieved. Relief will be pursued.
B-D Two Pressurizer nozzles were examined but full ASME Code coverage could not be achieved. Relief will be pursued.
B-G-2 One valve bonnet was unacceptable due to discovery of a loose nut. The condition was corrected and successfully re-examined. The required sample expansion was performed with no unacceptable results.
f 29of35
,o,.'
- 14. ' Abstract of Results of Examinations and Tests (continued)
ASME Clan 1 (continued)
B.J Two piping welds had linear indications which were corrected by surface conditioning and successfully re-examined.
ASME Clau 2 C-A The Excess Letdown Heat Exchanger head circumferential weld was examined but full ASME Code coverage could not be achieved. Relief will be pursued.
Pour girth seam welds on the "A" Steam Generator were examined. Full ASME Code coverage could not be achieved on three of the four welds.
Relief will be pursued.
C-B The "A" Steam Generator steam outlet nozzle was examined but full ASME Code coverage could not be achieved. Relief will be pursued.
C-F-2 Four piping welds had linear indications which were corrected by surface conditioning and successfully re-examined.
{
ASME Clau 3 & NF D-A During conduct of the Class 3 CS System - Boric Acid Transfer Functional Test, boric acid was discovered on a weld. The boric acid was removed and the weld examined by liquid penetrant and by VT-2. No unacceptable indications were found. The source of the boric acid was identified to be from a packing leak on an overhead valve.
D-C The Class 3 Spent Fuel Pool Cooling System Functional Test discovered a socket weld that was defective. The line was repaired and successfully re-examined.
N-F Several component supports were identified as having minor problems (i.e.
clearances, gaps, etc.). Evaluations were performed and the supports were determined operable, and did not fall within IWF-3410.
300f35
i
,a..,,
- 15. Abstract of Corrective Measures Welds No corrective measures were required as a result of UT examinations. All recorded indications were evaluated and verified to be related to geometry and weld metal I
structure.
Several surface examinations exhibited unacceptable linear indications which appeared to be non-relevant conditions. Further surface conditioning verified the non-relevant condition and yielded an acceptable re-examination.
Bolted Components A nut was found loose on a valve bonnet. The condition was corrected and i
successfully re-examined. In addition, the required sample expansion yielded no unacceptable results.
Pressure Testing A defective weld was discovered during conduct of a functional test on the Spent Fuel Pool Cooling System. The weld was repaired and the line was successfully tested.
- Boric Acid was found on a weld during conduct of a functional test on the CS -
Boric Acid Transfer System. The deposit was removed and the weld examined by liquid penetrant examination and by VT-2. No unacceptable indications were found. The source of the boric acid was identified to be from a packing leak on an overhead valve.
Comnonent Supoorts No corrective measures were required as a result of component support visual examinations. Clearance and gap discrepancies were evaluated by Engineering as acceptable.
31 of 35
o.i,o',
c l
l 4
APPENDIX B REPAIR / REPLACEMENT
SUMMARY
INDEX (From the end of the Third Refueling through the Fourth Refueling) 320f35
1
- / L,. '.,,
e ASME Section XI Repair / Replacements Work Reauest No.
Description t
94W000401 Installation of seal weld on new leakoff plug on MS-PV-3004 94W001087 Replacement of bolting on spare pump and installed on SW-P-41B l
94W001088 Replacement of bolting on spare pump and installed on l
SW-P-41 A
. 94W002273 Installation of seal weld on new leakoff plug on MS-PV-3002 94W002274 Installation of seal weld on new leakoff plug on MS-PV-3003 l
94W002681 Repair of reactor vessel flange seal ring groove i
94W002811 Replacement of code safety MS-V7 l
94 WOO 3106 Replacement of bolting for blanks on alt cooling f
94W003106 Additional bolting replacement on alt. cooling l
94W003236 Replacement of code safety MS-V38 l
94W003431 -
Repair of SW bowl serial #NG2534
)
94W003479 Installation of vent and drain on SW-S-10 l
94W003480 Installation of vent and drain on SW-S-11 l
94W003480 Replacement of bolting to connection on SW-S-11 94 WOO 3647 Replaced mechanical snubber with hydraulic snubber i
94W003648 Deleted snubbers 94W003649 Deleted snubber 94W003650 Deleted snubbers 94W003651 Replacement of mechanical snubber 95W000081 Replaced mechanical snubber with hydraulic snubber 95W000137 Replacement of plug in CS-V145 95W000352 Machining of S/G "D" secondary manway flange face 95W000352 Replacement of S/G "D" secondary manway bolting l
95W000353 Machining of S/G "C" secondary manway flange face l
95W000353 Replacement of S/G "C" secondary manway bolting 95W000354 Replacement of S/G "B" bolting and installation of heli-coil 95W000354 Machining of S/G "B" secondary manway flange face l
95W000354 Replacement of S/G "B" secondary manway bolting j
95W000355 Machining of S/G "A" secondary manway flange face l
95W000355 Replacement of S/G "A" secondary manway bolting l
95W000357 Replacement of S/G "D" primary manway bolting and l
machining of the manway 95W000401 Installation of seal weld on new leakoff plug on MS-PV-3004 95W000413 Removal ofinternals from SI-V297 95W000480 Replacement of bolting on CC-E-17B channel head t
95W000514 Base metal repair to flange on line SW-1806-02 95W000651 Repair of weld-o-let on line SW-1820-08 2
l 33 of 35 l
I l.
I
y.1,.',,
o ASME Section XI Repair / Replacements (continued)
Work Reauest No.
Description 95W000653
- Replacement of flange nut on SW-V61 95W000654 Replacement of bolting on SW-JTR-0805 95W000679' Seal house replacement on CS-P-2B 95W000680 Seal house replacement on CS-P-2A 95W000880 Replacement of SW-V28 95W000881 Repair / replacement ofinternals on MS-V96 95W000885 Repair ofinternals to FW-V70 95W000919 Replacement of disc and installation of anti-rotation lugs on CC-V295 95W000934 Replacement of bolting on SW-Vl9 95W000934 Replacement of flange bolting on SW-1814-JTR 1202 and 1203 95W000958 Relocate and replace MS-V94 95W000959 Relocate and replace MS-V96. Modified support 95W001309 S/G "D" secondary manway mod. by drilling 95W001401 Installation of cross connect to CC "B head tank 95W001402 Installation of cross connect for "B" train 95W001403 Installation of CC train "B" Hx outlet valve 95W001503 Repair of coupling on SF-P-10A casing drain line 95W001583 Deleted snubbers and cut support to allow work 95W001682 Repair to SB-V189 and replacement of studs 95W001784 Fabrication of SW spool pieces 95W001809 Fabricate support 1812-RG-2 and temp. support 95W001814 Installation ofnew SW spool pieces 95W001815 Installation of new SW spool pieces 95W001816 Installation ofnew SW spool pieces 95W001835 Replacement of code safety MS-V36 95W002030 Repair / replacement of S/G "D" secondary manway cover 95W002263 Installation of seal weld on new leakoff plug on MS-PV-3001 95W002273 Installation of seal weld on new leakoff plug on MS-PV-3002 95W002274 Installation of seal weld on new leakoff plug on MS-PV-3003 95W002431 Repair ofweld on line SW-1802 95W002505 Upgrading of DG fuel oil filllines 95W002622 Replacement of bolting on CBS-TK-101 A 95W002662 Replaced snubber with S/N-1593 95W002679 Replacement ofinternals, bolting and machining on RC-V124 95W002739 Replacement of bolting on CC-E-17A 34 of 35
h *', o ASME Section XI Repair / Replacements (continued)
Work Request No.
Description 94RM23715600 Replacement of columns & bowl on SW-P-110A 94RM23716600 Replacement of columns & bowl on SW-P-110B 94RM23721600 Replacement of columns & bowl on SW-P-41C I
94RM23722600 Replacement of columns & bowl on SW-P-41D 94RM24324001 Replacement of columns & bowl on Unit 2 pump serial #
NG2531 94RM24324600 Replacement of bolting for colunms & bowl removed from SW-P-110A 94RM24325600 Replacement of columns & bowl on pump removed 1
from SW-P41 A 94RM24325601 Replacement of columns & bowl on pump removed from SW-P41B 94RM24325603 Replacement of column, bowl and bolting on SW-P-41 spare pump 95RE00115001 Replacement of RC-V115, VI16, VI17 95RM22681001 Replacement of seals on RCP-A 95RM22683001 Replacement of seals on RCP-C 95RM23722600 Replacement of columns & bowl on SW-P-41D PO93770 Base metal repair on SW columns #2535 & #2536 l
l I
35 of 35 1